Key information

Title
Method for replacing flexible risers whilst installation vessel is positioned outside the platform safety zone
Application number
20151637
Case type
National
Status
02.12.2019 Patent meddelt (B1)
Filed
01.12.2015
Effective date
01.12.2015
Publicly available
02.06.2017
Next annual fee due
31.12.2026
Applicant
Ocean Installer AS (NO)
Owner
Ocean Installer AS (NO)
Inventor
Håvard Strand (NO)
Granted
02.12.2019
Patent number
344410
Expiry date
01.12.2035

Abstract and drawing


Disclaimer: This text has been machine-scanned and may contain errors – please refer to "Publications" for legally binding content.
The patent application describes installing or replacing flexible products by an improved simplified transfer of both topside and subsea ends to and from vessel/platform. This is without the use of additional vessel(s), additional winches on the topside/platform, subsea winches or requiring to take topside end near the seabed. This method describes a novel use of a lightweight rope or wire to safely transfer and connect heavy rigging up between installation/construction vessel and platform, with use of wire deflecting sheaves/wheels on both topside/platform and installation/contruction vessel.

Publications


B1A1
Checking availability of the latest published version...

Documents


Expand Download files (50)
Date
Date Doc. No. Process Case number In/Out Journal description To/from
03.11.2025 25-01 Saksbehandling 20151637(344410) UT PT Varsel om betaling av årsavgift for år 4 + (3352) (PT20151637)
04.11.2024 24-01 Saksbehandling 20151637(344410) UT PT Varsel om betaling av årsavgift for år 4 + (3352) (PT20151637)
10.11.2023 23-01 Saksbehandling 20151637(344410) UT PT Varsel om betaling av årsavgift for år 4 + (3352) (PT20151637)
03.11.2022 22-01 Saksbehandling 20151637(344410) UT PT Varsel om betaling av årsavgift for år 4 + (3352) (PT20151637)
02.11.2021 21-01 Saksbehandling 20151637(344410) UT PT Varsel om betaling av årsavgift for år 4 + (3352) (PT20151637)
03.11.2020 20-01 Saksbehandling 20151637(344410) UT PT Varsel om betaling av årsavgift for år 4 + (3352) (PT20151637)
30.04.2020 19-01 Saksbehandling 20151637 UT PT Påminnelse om ikke betalt årsavgift (3329) (PT20151637)
05.12.2019 18-01 Saksbehandling 20151637 UT PT Registreringsbrev Nasjonal Patent (15) (PT20151637)
05.11.2019 17-01 Saksbehandling 20151637 UT PT Varsel om betaling av årsavgift for år 4 + (3352) (PT20151637)
16.10.2019 16-01 Saksbehandling 20151637 UT PT Meddelelse om patent Ocean Installer AS
01.07.2019 15-05 Saksbehandling 20151637 INN Hovedbrev Ocean Installer AS
01.07.2019 15-04 Saksbehandling 20151637 INN Krav engelsk Ocean Installer AS
01.07.2019 15-03 Saksbehandling 20151637 INN Krav norsk Ocean Installer AS
01.07.2019 15-02 Saksbehandling 20151637 INN Beskrivelse Ocean Installer AS
01.07.2019 15-01 Saksbehandling 20151637 INN Korrespondanse (Hovedbrev inn) Ocean Installer AS
02.04.2019 14-01 Saksbehandling 20151637 UT Realitet patent Ocean Installer AS
07.01.2019 13-06 Saksbehandling 20151637 INN Krav Ocean Installer AS
07.01.2019 13-05 Saksbehandling 20151637 INN Krav Ocean Installer AS
07.01.2019 13-04 Saksbehandling 20151637 INN Beskrivelse Ocean Installer AS
07.01.2019 13-03 Saksbehandling 20151637 INN Hovedbrev Ocean Installer AS
07.01.2019 13-02 Saksbehandling 20151637 INN Patenttegninger Ocean Installer AS
07.01.2019 13-01 Saksbehandling 20151637 INN Korrespondanse (Hovedbrev inn) Ocean Installer AS
01.11.2018 12-01 Saksbehandling 20151637 UT PT Varsel om betaling av årsavgift for år 4 + (3352) (PT20151637)
09.10.2018 11-01 Saksbehandling 20151637 UT Realitet patent Ocean Installer AS
08.02.2018 10-06 Saksbehandling 20151637 INN Patenttegninger Ocean Installer AS
08.02.2018 10-05 Saksbehandling 20151637 INN Beskrivelse Ocean Installer AS
08.02.2018 10-04 Saksbehandling 20151637 INN Krav Ocean Installer AS
08.02.2018 10-03 Saksbehandling 20151637 INN Hovedbrev Ocean Installer AS
08.02.2018 10-02 Saksbehandling 20151637 INN Krav Ocean Installer AS
08.02.2018 10-01 Saksbehandling 20151637 INN Korrespondanse (Hovedbrev inn) Ocean Installer AS
13.11.2017 09-01 Saksbehandling 20151637 UT Realitet patent Ocean Installer AS
02.11.2017 08-01 Saksbehandling 20151637 UT PT Batch Varsel om betaling av første årsavgift (3317)
02.12.2016 07-02 Saksbehandling 20151637 INN Krav Ocean Installer AS
02.12.2016 07-01 Saksbehandling 20151637 INN Korrespondanse (Hovedbrev inn) Ocean Installer AS
01.12.2016 06-02 Saksbehandling 20151637 INN Krav Ocean Installer AS
01.12.2016 06-01 Saksbehandling 20151637 INN Korrespondanse (Hovedbrev inn) Ocean Installer AS
09.06.2016 05-02 Saksbehandling 20151637 UT PT report 01:39:29
09.06.2016 05-01 Saksbehandling 20151637 UT Realitet patent Ocean Installer AS
08.12.2015 04-01 Saksbehandling 20151637 INN Korrespondanse (Hovedbrev inn) Ocean Installer AS
02.12.2015 03-01 Saksbehandling 20151637 UT Formalia 1 Ocean Installer AS
01.12.2015 02-04 Saksbehandling 20151637 INN PT søknadsskjema Ocean Installer AS
01.12.2015 02-03 Saksbehandling 20151637 INN Beskrivelse Ocean Installer AS
01.12.2015 02-02 Saksbehandling 20151637 INN Erklæring Søkers rett til oppfinnelsen Ocean Installer AS
01.12.2015 02-01 Saksbehandling 20151637 INN E-post Ocean Installer AS
01.12.2015 01-06 Saksbehandling 20151637 INN Krav
01.12.2015 01-05 Saksbehandling 20151637 INN Beskrivelse
01.12.2015 01-04 Saksbehandling 20151637 INN Erklæring Søkers rett til oppfinnelse
01.12.2015 01-03 Saksbehandling 20151637 INN Krav engelsk
01.12.2015 01-02 Saksbehandling 20151637 INN tegninger
01.12.2015 01-01 Saksbehandling 20151637 INN Søknadsskjema Patent

Description, claims and drawings


Disclaimer: This text has been machine-scanned and may contain errors – please refer to "Publications" for legally binding content. Description
DESCRIPTIONMethod for replacing flexible risers whilst installation vessel is positioned outside the platform safety zoneA method for replacing risers, umbilicals and other flexible products (summarily termed risers) was developed in order to prevent the installation vessel performing the operations from needing to be in close proximity of the platform. This provides marine safety benefits in terms of keeping the vessel further away from the platform (hence reducing risk of collision as well as exposure to potential hazardous discharge/leaks from platform), it provides flexibility with heading for the construction/installation vessel which provides improved operability depending on environmental (wind/waves) direction, and as some platforms have exposed riser balconies (hang off areas where risers are hung off on the topside) and prohibited zones where the vessel cannot enter whilst production is ongoing it allows for simultaneous marine operations to replace risers, umbilicals and flexible products whilst production is ongoing at the platform.The method can be performed either with recovery of risers or installation of risers. This patent covers for the differences in method compared to the normal replacement method which requires the construction vessel to be typically within 20m of the platform. Typical arrangement for operations when vessel is required to be close to platform for topside handshake is shown on Figures 1-6, which show a typical up-close arrangement for topside transfer of a riser topside end to the platform/topside pull in winch wire.With reference to Statoil Patent (International Publication Number WO 2015/074687 A1), this patent describes installing or replacing flexible products by an improved and simplified transfer of both topside and subsea ends to and from vessel/platform. This is without the use of additional vessel(s), additional winches on the topside/platform, subsea winches or requiring to take topside end near the seabed. This method describes a novel use of a lightweight rope or wire to safely transfer and connect heavy rigging up between installation vessel and platform, with use of wire deflecting sheaves/wheels on both topside/platform and installation vessel.This patent also describes a way to use buoyancy on the topside end if required in order to reduce winching tension for transfer of topside end between topside/platform and installation vessel.Several devices/equipment are required for this method. A "vessel wire deflector" device on the installation vessel (described below), a winch with lightweight rope/wire on it on it, rigging for performing the "handshakes" and a topside winch with a "topside wire deflector" on the topside, ref to Figure 7 and 8.The "vessel wire deflector" is a device which allows a lifting wire to be deflected away from its main lifting axis (this is usually vertical for cranes but may be different for other lifting devices -such as horizontal for winches). This typically involves a sheave but may have a chute or rollers or other similar design to allow the wire to be bent away from the main vertical axis. The sheave/chute/rollers can typically rotate such that there is minimal wear on the lifting wire. The sheave/chute/rollers may also swivel (typically in the vertical axis - but may be different depending upon lifting device) such that it allows for varying angles of the wire relative to the vessel (which provides vessel heading flexibility). This is particularly useful on cranes as the crane wire typically has a restriction in offlead and sidelead angles which prevents large deflections relative to the vertical axis from being allowed. A typical concept sketch for a “vessel wire deflector” is shown in Figure 7.The "topside wire deflector" is a similar device which allows a lifting wire to be deflected away from the main lifting axis (typically vertical for winches but may be different depending on lifting device and wire routing). This typically involves a sheave but may have a chute or rollers or other similar design to allow the wire to be bent away from the main lifting axis. The sheave/chute/rollers can typically rotate such that there is minimal wear on the lifting wire. The "topside wire deflector" however does not typically need to swivel around an axis as the platform riser angle towards the installation vessel is typically maintained within a small sector and the platform does not typically need heading flexibility. A typical “topside wire deflector” arrangement is shown on the left side of the Figure 8 and if this is not used the normal angle of wire out of the hangoff area is restricted due to clashing of wire and this is shown on the righthand side of Figure 8.Due to the distances of transfer, the wire tensions and deflection angles can be large. If the wire angle & tension combination during the transfers are larger than what the equipment can safely operate, an alternative method is to incorporate some buoyancy elements on the topside end of the riser in order to reduce the top tension. This can be kept in place during the transfer or removed separately.The method for recovery of existing risers consists of the following steps:● Lowering the topside end of the riser through the hang off slot so the riser goes deeper into the water (shown on Figure 9.).● Installing a “topside wire deflector” on the topside hang off slot such that it allows the winch wire on the platform to be deflected below level of the hang off slot towards the vessel.● The installation vessel then deploys a lifting wire over the side of the vessel facing the platform (typically crane block but could easily be a winch or other lifting device with wire attached) (shown on Figure 9.).● This lifting wire from the installation vessel is then inserted into the crane wire deflector and secured in the sheave/chute/rollers.● A pulling device (typically winch) with lightweight rope/wire (typically synthetic/fibre rope made close to neutrally buoyant) or lightweight wire is then deployed over the same side of the vessel facing the platform (shown on Figure 9.).● The lightweight rope/wire is equipped with rigging that is attached to the bottom of the installation vessel lifting wire and with a snatch block (or other running device which allows the rope to run through the system) to the topside end of the riser (or rigging above it) (shown on Figure 10).● The lightweight rope/wire is then paid in to bring the end of the lifting wire from the installation vessel towards the topside end of the riser and this is then connected up to the topside end of the riser through rigging (shown on Figure 11 and 12).● The lightweight rope/wire is then disconnected and recovered back to the vessel (or in an alternative arrangement can remain connected during the transfer), whilst the winch wire from the platform is paid out and the lifting wire from the vessel is paid in either simultaneously or in steps or in a combination to bring the topside end of the riser towards the installation vessel (shown on Figure 12 and 13).● The lightweight rope/wire is then deployed again and connected up to the topside end of the riser (or rigging above it) and the snatch block (or other running device which allows the rope to run through the system) is connected up to the winch wire from the platform/topside. This can be also done the other way with the snatch block connected to the topside end of the riser and the end connected to the winch wire from the platform/topside. This is shown on Figure 14.● The winch wire is then disconnected from the riser and the lightweight rope/wire is paid out to allow the winch wire from the platform/topside to be recovered to the platform/topside area. This is shown on Figure 14.● The vessel remains at distance from the platform during this whole process.● The riser is then recovered in the normal method whilst keeping at distance away from the platform/topside.The method for installation can then involve additional steps in order initiate the subsea end of the riser if the subsea end of the riser is in pliant wave configuration. The method for this initiation of subsea end consists of the following steps:● The subsea end of the riser is deployed from the installation vessel (shown on Figure 15). ● The pulling device (typically winch) with lightweight rope/wire (typically synthetic/fibre rope made close to neutrally buoyant) or lightweight wire is then deployed over the same side of the vessel facing the platform (shown on Figure 15).● The lightweight rope/wire with snatch block or other running device attaches to the subsea end of the riser below the vessel and also is connected to the winch wire from the platform/topside (shown on Figure 15).● The lightweight rope/wire is then paid in to bring the winch wire from the platform/topside across to the subsea end of the riser (shown on Figure 16).● A subsea connection is then made between the platform wire rigging and the subsea end of riser (shown on Figure 16).● The lightweight rope/wire is then disconnected from the subsea end and platform/topside wire (shown on Figure 16). ● The winch wire from the platform and riser on the vessel are paid in/out either simultaneously or in steps or in a combination to allow the subsea end of the riser to be brought closer to the platform and then the "sag bend" catenary that is created in the riser is landed on the seabed in correct position with the subsea end suspended on the platform winch wire and the riser is then laid away from the platform (shown on Figure 17 and 18).● Once the installation vessel is in position, the platform is then moved in a coordinated pattern (typically using the mooring/winch system) and the platform/topside winch wire is lowered (either simultaneously, in steps, or a combination) to enable the subsea end to be lowered towards the seabed and disconnected (shown on Figure 19).Once the platform winch wire is disconnected from the subsea end and the installation vessel is ready for transfer of the topside end of the riser to the platform/topside, the topside end of the product will typically be hanging from below the vessel on the A&R (Abandonment and Recovery) rigging or the crane rigging (shown on Figure 20 and 21 below). The transfer of the topside end of the riser will then be performed from either the crane/winch rigging or from the A&R rigging and it consists of the following steps:● The lightweight rope/wire with snatch block or other running device will be deployed and connected up to both topside end of riser and platform winch wire (shown on Figure 22).● The lightweight rope/wire is then paid in to bring the end of the lifting wire from platform/topside towards the topside end of the riser and is then connected up (shown on Figure 23).● The lightweight rope/wire is then disconnected and recovered back to the vessel (or in an alternative arrangement can remain connected during the transfer), whilst the winch wire from the platform is paid in and the crane rigging or A&R wire from the vessel is paid out either simultaneously or in steps or in a combination to bring the topside end of the riser underneath the platform/topside (shown on Figure 24).● Once the load is taken by the platform winch wire, the lightweight rope/wire is connected to the end of the crane rigging or A&R wire and the topside end to disconnect the crane/A&R rigging and then the lightweight rope/wire is paid out to allow the crane/A&R rigging to return to the installation vessel (shown on Figure 24 -26). ● The lightweight rope/wire is then disconnected and the topside end of riser is fully transferred over to the platform/topside (shown on Figure 26 - 27).
Claims
CLAIMS1. A method for removing a riser using an installation vessel positioned and remaining outside the safety zone of an offshore platform characterized in that the method comprises the steps of:a. The topside end of the riser is lowered below the platform, in the case of the removal of a riser by a first lifting wire connected to a first lifting device, b. A second lifting wire connected to a second lifting device is lowered below the installation vessel in the case of the removal of a riser,c. A rope or line, light in weight with respect to the first and second lifting wire, is lowered from a winch on the installation vessel and connected to the end of the second lifting wire,d. A pulley, arranged along the rope or line, is connected to the topside end of the riser, such that the rope or line extends from the winch on the installation vessel, through the pulley attached to the topside end of the riser, and over to the second lifting wire,e. The rope or line is pulled in by the winch on the installation vessel in coordination with paying out the second lifting wire, whereby the second lifting wire is pulled over to the immediate vicinity of the topside end of the riser,f. The second lifting wire is connected to the topside end of the riser,g. The second lifting wire is pulled in by the second lifting device, in coordination with the first lifting wire being paid out by the first lifting device, whereby the topside end of the riser is moved to a position below the second lifting device,Whereby the riser may then be moved vertically to a desired position by the second lifting device.2. The method for removing a riser according to claim 1, characterized in that the topside end of the riser comprises connection rigging for connecting the pulley and/or the second lifting wire to the topside end of the riser.3. The method for removal of a riser according to claim 1 or 2, characterized in that the desired position of the topside end of the riser is at a moonpool or at the side of the installation vessel.4. The method for removing a riser according to one of the preceding claims further comprises the step of pulling in the first lifting wire by the first lifting device, in coordination with paying out the rope or line, in order to safely return the first lifting wire to a position below the first lifting device.5. The method for removing a riser according to one of the preceding claims, whereby either or both of the first or the second lifting wire pass through a deflecting sheave arranged to permit the lifting wire to achieve an angle of deflection greater than the angle of deflection otherwise tolerated by its respective lifting device.6. The method for removing a riser according to one of the preceding claims, characterized in that one or more of the connections of the first or second lifting wires, and/or the rope or the line, is performed by a ROV.7. The method for installation of a riser using an installation vessel positioned and remaining outside the safety zone of an offshore platform characterized in that the method comprises the steps of:a. A first lifting wire connected to a first lifting device is lowered from the platform b. The topside end of the riser is lowered below the installation vessel, using a second lifting wirec. A rope or line, light in weight with respect to the first and second lifting wires is lowered from a winch on the installation vessel and connected to the end of the first lifting wire,d. A pulley, arranged along the rope or line, is connected to the topside end of the riser, such that the rope or line extends from the winch on the installation vessel, through the pulley attached to the topside end of the riser, and over to the first lifting wire, e. The rope or line is pulled in by the winch on the installation vessel in coordination with paying out the first lifting wire, whereby the first lifting wire is pulled over to the immediate vicinity of the topside end of the riser,f. The first lifting wire is connected to the topside end of the riser,g. The first lifting wire is pulled in by the first lifting device, at the same time as the second lifting wire is being paid out by the second lifting device, whereby the topside end of the riser is moved to a position below the first lifting device,Whereby the riser may then be moved vertically to a desired position by the first lifting device.8. The method for installing a riser according to claim 7, characterized in that the desired position of the topside end of the riser is at a hang off point on the platform.Oversettelse av krav fra engelsk til norskKRAV1. Fremgangsmåte for fjerning av stigerør ved bruk av et installasjonsfartøy plassert og som forblir utenfor sikkerhetssonen av en offshore-plattform, karakterisert ved at fremgangsmåten omfatter følgende trinn:a. Plattform-enden av stigerøret senkes under plattformen, i tilfellet av fjerning av stigerør ved hjelp av en første løftevaier forbundet med en første løfteinnretning, b. En andre løftevaier som er koblet til en andre løfteinnretning senkes under installasjonsfartøyet dersom man skal fjerne et stigerør,c. Et tau eller line, lett i vekt i forhold til første og andre løftevaier, senkes fra en vinsj på installasjonsfartøyet og tilkobles enden av den andre løftevaieren,d. En talje, som er anordnet langs tauet eller linen, er koblet til plattform-enden av stigerøret, slik at tauet eller linen strekker seg fra vinsjen på installasjonsfartøyet, gjennom taljen festet til plattform-enden av stigerøret, og over til den andre løftevaieren,e. Tauet eller linen trekkes inn av vinsjen på installasjonsfartøyet samtidig som man gir ut den andre løftevaieren, og hvor den andre løftevaieren blir trukket over til umiddelbar nærhet av plattform-enden av stigerøret,f. Den andre løftevaieren er koblet til plattform-enden av stigerøret,g. Den andre løftevaieren trekkes inn av den andre løfteinnretningen, samtidig som at den første løftevaieren gis ut av den første løfteinnretningen, og hvor plattformenden av stigerøret blir flyttet til en posisjon under den andre løfteinnretningen,Deretter kan stigerøret flyttes vertikalt til en ønsket posisjon ved den andre løfteinnretningen.2. Fremgangsmåte for fjerning av stigerør i henhold til krav 1, karakterisert ved at plattform-enden av stigerøret omfatter rigging for tilkopling av taljen og / eller den andre løftevaieren til plattform-enden av stigerøret.3. Fremgangsmåte for fjerning av et stigerør i henhold til krav 1 eller 2, karakterisert ved at den ønskede posisjonen til plattform-enden av stigerøret er ved en «moonpool» eller på siden av installasjonsfartøyet.4. Fremgangsmåte for fjerning av stigerør i henhold til et av de foregående krav, omfatter videre trinnet med å trekke inn i den første løftevaieren ved den første løfteinnretningen, samtidig som man løser ut tauet eller linen, for å trygt returnere den første løftevaieren til en posisjon under den første løfteinnretningen.5. Fremgangsmåte for fjerning av stigerør i henhold til et av de foregående krav, hvor den ene eller begge av den første eller den andre løftevaieren passerer gjennom en styreblokk anordnet for å tillate løftevaieren å oppnå en vinkel som er større enn vinkelen som ville vært tolerert av sin respektive løfteinnretning.6. Fremgangsmåte for fjerning av stigerør i henhold til et av de foregående krav, karakterisert ved at en eller flere av sammenkoblingene til den første eller andre løftevaieren og / eller tauet eller linen utføres av en ROV.7. Fremgangsmåten for installering av stigrør ved bruk av et installasjonsfartøy plassert og som forblir utenfor sikkerhetssonen av en offshore-plattform, karakterisert ved at fremgangsmåten omfatter følgende trinn:a. En første løftevaier som er koblet til en første løfteinnretning senkes fra plattformen, b. Plattform-enden av stigerøret senkes under installasjonsfartøyet ved hjelp av en andre løftevaier,c. Et tau eller line, lett i vekt i forhold til første og andre løftevaier, senkes fra en vinsj på installasjonsfartøyet og tilkobles enden av den første løftevaieren,d. En talje, som er anordnet langs tauet eller linen, er koblet til plattform-enden av stigerøret, slik at tauet eller linen strekker seg fra vinsjen på installasjonsfartøyet, gjennom taljen festet til plattform-enden av stigerøret og over til den første løftevaieren,e. Tauet eller linen trekkes inn av vinsjen på installasjonsfartøyet samtidig som man gir ut den første løftevaieren, og hvor den første løftevaieren blir trukket over til umiddelbar nærhet av plattform-enden av stigerøret,f. Den første løftevaieren er koblet til plattform-enden av stigerøretg. Den første løftevaieren trekkes inn av den første løfteinnretningen, samtidig som at den andre løftevaieren gis ut av den andre løfteinnretningen, og hvor plattform-enden av stigerøret blir flyttet til en posisjon under den første løfteinnretningen.Deretter kan stigerøret flyttes vertikalt til en ønsket posisjon ved den første løfteinnretningen.8. Fremgangsmåte for å installere et stigrør i henhold til krav 7, karakterisert ved at den ønskede posisjonen til plattform-enden av stigerøret er ved et avhengingspunkt på plattformen.
Drawings

Priority


No priority

Patent classes


IPC classesE21B 17/01CPC classesE21B 17/015

Citations


WO 2015/074687 A1 (A1)WO 2011/099869 A2 (A2)US 4588326 A (A)US 2007/048093 A1 (A1)

Applicants, owners and inventors


Owners
Ocean Installer AS
Postboks 8070 4068 STAVANGER NO (STAVANGER Municipality, Rogaland county)Org. number: 996713156
Inventors
Håvard Strand
Postboks 8070 4068 STAVANGER NO (STAVANGER Municipality, Rogaland county)

Agent


No agent

Status history


Payment history


Oppositions and appeals


No oppositions or appeals

Administrative limitation


No administrative limitation

Liens and licences


No liens or licenses registered

Gazette entries


No Gazette entries foundOnly events from 2024.03.04 and onwards are shown.