Key information

Title
SYSTEM, METHOD, AND SUPPORT VESSEL FOR USE IN RECOVERING VOLATILE ORGANIC COMPOUNDS IN LOADING FLUID HYDROCARBON CARGO INTO A CARGO TANK OF A CARRIER VESSEL
Application number
20200076
Case type
National
Status
Filed
21.01.2020
Effective date
21.01.2020
Publicly available
18.01.2021
Next annual fee due
31.01.2027
Applicant
VAHOLMEN VOC RECOVERY AS (NO)
Owner
VAHOLMEN VOC RECOVERY AS (NO)
Inventor
Alexander Lund (NO)
Agent
HÅMSØ PATENTBYRÅ AS (NO)
Granted
18.01.2021
Patent number
345410
Expiry date
21.01.2040

Abstract and drawing


Disclaimer: This text has been machine-scanned and may contain errors – please refer to "Publications" for legally binding content.
There is described a system, a method, and a support vessel for use in the system. The system can in various embodiments include: a carrier vessel for carrying fluid hydrocarbon cargo across sea, the hydrocarbon cargo to be loaded into at least one cargo tank of the vessel; a support vessel; VOC recovery means on the support vessel for recovering volatile organic compounds, VOCs, the VOCs being produced from the cargo tank in loading the cargo tank, in use; and at least one hose extending between the carrier vessel and the support vessel for communicating gas comprising volatile organic compounds, VOCs, through the hose from the cargo tank of the carrier vessel to the VOC recovery means on the support vessel.

Publications


B1
Checking availability of the latest published version...

Documents


Expand Download files (22)
Date
Date Doc. No. Process Case number In/Out Journal description To/from
06.12.2021 11-01 Saksbehandling 20200076(345410) UT PT Varsel om betaling av første årsavgift (3317) (PT20200076)
05.05.2021 09-01 Saksbehandling 20200076(345410) UT Brev prioritetsdokument HÅMSØ PATENTBYRÅ AS
03.05.2021 10-02 Saksbehandling 20200076(345410) INN Kvittering betaling patentstyret priodok HÅMSØ PATENTBYRÅ AS
03.05.2021 10-01 Saksbehandling 20200076(345410) INN Korrespondanse (Hovedbrev inn) HÅMSØ PATENTBYRÅ AS
05.03.2021 07-01 Saksbehandling 20200076 UT Brev prioritetsdokument HÅMSØ PATENTBYRÅ AS
04.03.2021 08-02 Saksbehandling 20200076(345410) INN P29365NO00_GCC HÅMSØ PATENTBYRÅ AS
04.03.2021 08-01 Saksbehandling 20200076(345410) INN Korrespondanse (Hovedbrev inn) HÅMSØ PATENTBYRÅ AS
18.01.2021 06-01 Saksbehandling 20200076(345410) UT PT Registreringsbrev Nasjonal Patent (15) (PT20200076)
08.01.2021 05-01 Saksbehandling 20200076 UT Intention to grant HÅMSØ PATENTBYRÅ AS
28.09.2020 04-05 Saksbehandling 20200076 INN P29365NO00 Reply to OA HÅMSØ PATENTBYRÅ AS
28.09.2020 04-04 Saksbehandling 20200076 INN P29365NO00 Mark-up copy, amended description HÅMSØ PATENTBYRÅ AS
28.09.2020 04-03 Saksbehandling 20200076 INN P29365NO00 Formal Drawings HÅMSØ PATENTBYRÅ AS
28.09.2020 04-02 Saksbehandling 20200076 INN P29365NO00 Amended description HÅMSØ PATENTBYRÅ AS
28.09.2020 04-01 Saksbehandling 20200076 INN Korrespondanse (Hovedbrev inn) HÅMSØ PATENTBYRÅ AS
20.08.2020 03-02 Saksbehandling 20200076 UT PT report 10:08:47
20.08.2020 03-01 Saksbehandling 20200076 UT Realitet patent HÅMSØ PATENTBYRÅ AS
22.01.2020 02-01 Saksbehandling 20200076 UT Infobrev til oppfinner HÅMSØ PATENTBYRÅ AS
21.01.2020 01-05 Saksbehandling 20200076 INN Erklæring Søkers rett til oppfinnelse HÅMSØ PATENTBYRÅ AS
21.01.2020 01-04 Saksbehandling 20200076 INN Beskrivelse HÅMSØ PATENTBYRÅ AS
21.01.2020 01-03 Saksbehandling 20200076 INN Fullmakt HÅMSØ PATENTBYRÅ AS
21.01.2020 01-02 Saksbehandling 20200076 INN Patenttegninger HÅMSØ PATENTBYRÅ AS
21.01.2020 01-01 Saksbehandling 20200076 INN Søknadsskjema Patent HÅMSØ PATENTBYRÅ AS

Description, claims and drawings


Disclaimer: This text has been machine-scanned and may contain errors – please refer to "Publications" for legally binding content. Description
SYSTEM, METHOD, AND SUPPORT VESSEL FOR USE IN RECOVERING VOLATILE ORGANIC COMPOUNDS IN LOADING FLUID HYDROCARBON CARGO INTO A CARGO TANK OF A CARRIER VESSELTechnical fieldThe present invention relates to marine loading operations, and in particular relates to the loading of fluid hydrocarbon cargo onto carrier vessels, e.g. the loading of crude oil onto oil tankers, and the handling of VOC gases in connection with that.BackgroundProduced hydrocarbon fluid, for example crude oil or other fluid hydrocarbon cargo, are often carried on tanker vessels across the sea. In many cases, the tanker vessels are high-capacity carrier vessels intended to transport the fluid product long distances.In order to load fluid cargo onto the tanker vessel, a hose may be connected to the vessel and the fluid cargo is sent through the hose into the tanks of the vessel.Normally when filling the tanks of a carrier vessel with crude oil, gases including Volatile Organic Compounds (VOC) are released from the oil, e.g. VOC vapour released from the crude oil because of the prevailing temperature and pressure conditions. VOC gases are often also present in residual amounts in the atmosphere of “empty” tanks. The VOC gas is displaced from the tank during filling. Traditionally, the VOC gas is then vented and released into the Earth’s atmosphere.The emission of VOC gases into the Earth’s atmosphere is problematic in that it can be environmentally damaging. In some areas, such as on the Norwegian Continental Shelf (NCS), conditions have been issued prohibiting emissions of VOC gases. The existing solution to this for tankers transporting crude oil in the North Sea is currently to fit a VOC process plant on the tanker. The processing plant then recovers the gas and stores components of the gas as liquid which then can be discharged, thereby avoiding emission of the gas into the atmosphere. However, fitting suitable VOC process plants can be technically complex and expensive, and the inventors have noted that the existing solution can be inconvenient, inefficient and time consuming to scale up for the world fleet of tankers and meet the demands for handling VOC gases. There is a need for solutions which can better address these issues.At least one aim of the invention is otherwise to obviate or mitigate one or more drawbacks of prior art solutions.Published patent application WO 98/33026 A1 describes a method of reducing the discharge of VOC into the atmosphere.Published patent application WO 2019/017796 A1 describes a low emission oil tanker.Summary of the inventionAccording to a first aspect of the invention, there is provided a system comprising: a carrier vessel for carrying fluid hydrocarbon cargo across sea, the hydrocarbon cargo to be loaded into at least one cargo tank of the vessel; a support vessel; VOC recovery means on the support vessel for recovering volatile organic compounds, VOCs, the VOCs being produced from the cargo tank in loading the cargo tank, in use; and at least one hose extending between the carrier vessel and the support vessel for communicating gas comprising volatile organic compounds, VOCs, through the hose from the cargo tank of the carrier vessel to the VOC recovery means on the support vessel.Preferably, the support vessel has a dynamic positioning system, more preferably a DP2 system. By way of the dynamic positioning system, the support vessel may be positioned with respect to the carrier vessel. The support vessel may have propellers or thrusters which may operate under control of the dynamic positioning system for obtaining a desired heading and/or distance away from the carrier vessel. By way of the dynamic positioning, the support vessel may advantageously be kept in desired position and heading relative to the carrier vessel in the presence of forces imparted by waves, wind and current against the carrier vessel or in a case of the carrier vessel rotating or that weathervanes when moored. In particular, the dynamic positioning system may operate to keep the support vessel in position relative to the carrier vessel and/or keep the support vessel spaced apart in the water from the carrier vessel, e.g. by at least a predetermined distance or spacing. The support vessel may be kept in position by operation of the dynamic positioning system so that the distance between the support vessel and the carrier vessel by which they are spaced apart may be kept within a predefined range of allowable distances.Typically, the support vessel is a platform supply vessel, PSV. Alternatively, the support vessel may be a gas carrier e.g. built from new, and equipped with the dynamic positioning system. The system may further comprise an offshore mooring, wherein the carrier vessel may be moored to the mooring. The mooring may comprise a single point mooring. The vessel may be arranged to weathervane about the mooring. The vessel may be bow-moored to the mooring. Alternatively, the mooring may for example comprise a Sea Island or regular berth. The carrier vessel may typically be a crude oil carrier, e.g. an tanker, and the fluid hydrocarbon cargo may then typically comprise crude oil.The VOC recovery means may typically comprise a VOC processing facility onboard the support vessel for processing the VOCs from the supplied gas. The VOC recovery means may further comprise at least one storage tank for storing liquid comprising VOCs. The VOC processing facility is configured to liquefy the VOCs from the gas to obtain a liquid comprising liquefied VOCs. In this way, the support vessel may be certified for transport of liquid in the storage tank, and may conveniently sail to shore to discharge the VOCs from the tank.According to a second aspect of the invention, there is provided a support vessel for assisting in loading fluid hydrocarbon cargo into at least one cargo tank of a carrier vessel, the carrier vessel to transport the loaded fluid hydrocarbon cargo across sea, the support vessel comprising onboard VOC recovery means for recovering volatile organic compounds, VOCs, the VOCs being produced from the cargo tank in loading the cargo tank of the carrier vessel. The support vessel may further comprise at least one hose for extending between the carrier vessel and the support vessel for communicating the gas comprising VOCs from the cargo tank of the carrier vessel to the processing facility on the support vessel.The support vessel may further comprise a dynamic positioning system, e.g. for positioning and controlling the heading of the support vessel with respect to the carrier vessel. The support vessel may further comprise propulsion and/or thruster means for steering or positioning the vessel with a desired heading or distance from the carrier vessel, e.g. under control of the dynamic positioning system. The dynamic positioning system may be as described in relation to the first aspect of the invention.According to a third aspect of the invention, there is provided a method comprising the steps of: loading fluid hydrocarbon cargo into at least one cargo tank of a carrier vessel; providing at least one support vessel to facilitate in said loading step, the support vessel provided with VOC recovery means onboard; recovering volatile organic compounds, VOCs, the VOCs being produced from the cargo tank in the step of loading the cargo tank; supplying gas comprising volatile organic compounds, VOCs, from the cargo tank of the carrier vessel to the VOC recovery means on the support vessel through at least one hose which extends between the carrier vessel and the support vessel.The method may further comprise any one or more of the steps of: disconnecting the support vessel from the carrier vessel by disconnecting the connecting hose from either or both of the support vessel and the carrier vessel; transporting the loaded fluid hydrocarbon cargo across sea on the carrier vessel; and using the support vessel to facilitate in loading another carrier vessel which is moored at the same or another mooring.Advantageously, the support vessel preferably is not moored, and more specifically, preferably the support vessel is not moored to the carrier vessel, e.g. no mooring lines between the two vessels, even when the hose may be connected and be in use between the support vessel and the carrier vessel.The method may further comprise: storing liquid comprising VOCs from the recovery means in at least one storage tank on the support vessel; discharging at least some of the liquid from the storage tank of the support vessel; and transmitting the discharged liquid through tubing to at least one onshore recipient.The recovery means may comprise a processing facility on the support vessel, and the method may then further comprise either or both: operating the processing facility to liquefy VOCs from the gas supplied to the processing facility; and storing liquid comprising the liquefied VOCs in at least one storage tank on the support vessel. The method may further comprise liquifying the VOCs of the gas in the processing facility by cooling and condensing the gas to obtain VOC condensate liquid. Any of the various aspects may have one or more further features as set out in any one or more of the independent claims as appended here to, or anywhere else herein.Various advantages of the different aspects and examples of the invention will be apparent from throughout the present specification.Drawings and specific descriptionThe various aspects of the invention will now be described, by way of example only, with reference to the accompanying drawings, in which:Figure 1 is a schematic overhead view of an example system for loading crude oil onto a crude oil carrier;Figure 2 is a block diagram of a method of loading crude oil carriers for transport; and Figure 3 is a schematic overhead view of an example where the carrier vessel is moored to a Sea Island.The system 1 of Figure 1 includes a crude oil carrier 10 (constituting a carrier vessel) which in this example is moored to an offshore mooring 5 by a tether 6.Flexible hoses 2 connect between the mooring 5 and midship manifold 15b of the carrier 10. The hoses 2 are buoyant and over part of their length float on the water. Oil to be loaded onto the carrier 10 is communicated from the supply pipeline 3 through the hoses 2 and into cargo tanks 12 in the hull 13 of the carrier 10.The system 1 further includes a support vessel 20. The support vessel 20 is positioned alongside the moored carrier 10. The support vessel 20 is spaced apart from one side of the carrier 10 by a distance D and is controlled to have a parallel heading to that of the carrier 10 by the use of a Dynamic Positioning system of the vessel 20.The support vessel 20 has a VOC recovery means 21 including an onboard processing facility 22 for recovering volatile organic compounds (VOC). To facilitate this, the system includes a supply hose 24 for communicating gas comprising VOCs from the cargo tanks 12 of the carrier vessel to the recovery means 21 on the support vessel. The supply hose 24 extends between the carrier 10 and the support vessel 20. One end of the supply hose 24 in this example is connected to a midship manifold 15a of the carrier 10 and the other end of the supply hose 24 in this example is connected to an inlet pipe 25 of the processing facility 22. The hose 24 is flexible and stored on a reel 26 on the support vessel 20.The processing facility 22 receives the gas and is operable to liquify the VOCs into liquid, e.g. by compressing and condensing the various VOC components of the gas. VOC recovery technology such as that available from Wartsila can be provided on the support vessel 22 for this purpose. The VOC recovery means 21 includes a storage tank 23 for storing the produced liquid, allowing it to be transported onward across sea onboard the vessel.The liquid is temporarily stored in the tank 23 onboard the support vessel 20. The liquid is later discharged, for example it may be transported and offloaded to land when in port or transferred to an onward transhipment facility.Thus, the VOCs which are produced from the cargo tanks 12 during loading of the carrier 10 are recovered without releasing the VOC gases into the atmosphere. The liquid comprising liquefied VOCs is stored on the support vessel 20 and can be later discharged safely at a suitable facility onshore or elsewhere.By providing the VOC recovery means 21 on the support vessel 20, the facility 22 can be used for the time needed during loading, then disconnected readily for use with another incoming crude oil carrier, simply by disconnecting the end of the hose 24. The hose 24 is preferably stored on the support vessel 20 on the reel 26, in which case the end of the hose attached at the midship manifold 15a may be disconnected. The crude oil carrier 10 can in the meantime set off across sea to the desired destination for the crude oil. The support vessel 20 can then remain on standby or travel to port for discharge of the liquid VOC, e.g. near the location of the mooring 5, awaiting the arrival of another crude oil carrier at the mooring 5. As soon as the other crude oil carrier is moored, the support vessel 20 can be utilised again for recovery of VOC gas when the next crude oil carrier is being loaded. Thus, the VOC processing facility 22 may advantageously be put into operational use again before the original carrier 10 has reached its destination. The VOC recovery means 21 may thus be conveniently available for operation on a repeated basis with new carriers. The crude oil carrier 10 is bow moored to the mooring 5. The carrier 10 is moored rotationally to the mooring 5. The tether 6 extends from the bow of the transport vessel to the mooring 5. The carrier 10 can then move i.e. “weathervane” according to the forces imparted from the environment rotationally about the mooring 5. The crude oil carrier 10 can then weathervane so as to align parallel to and with the bow arranged toward the direction W of environmental force, e.g. the cumulative force of wind, waves, and current acting upon the vessel. However, any other suitable moorings for the crude oil carrier could be used.The support vessel 20 has a dynamic positioning system, preferably DP2, positioning system whereby it can keep a position and heading relative to the crude oil carrier 10 that is substantially constant. The support vessel 20 has thrusters and steering which operate under control of the dynamic positioning system to maintain the position and heading. If urged by environmental forces away from the desired position, the dynamic positioning system operates to bring the support vessel 20 back to its intended, e.g. pre-programmed, position and heading relative to the carrier 10. If the carrier vessel moves during loading operations, e.g. upon weathervaning, the support vessel 20 can be moved correspondingly by operation of the dynamic positioning system.This can facilitate arranging the support vessel 20 a safe distance away from the carrier 10 but near enough that the hose 24 can be connected. Furthermore, the support vessel 20 is mobile and readily moved away upon disconnecting and removing the hose 24 the vessel 20 is ready for further use.Conveniently, the support vessel 20 is a platform supply vessel (PSV).The support vessel 20 is not moored to the carrier vessel 10. The necessary positioning is provided by virtue of the operability of the dynamic positioning system and steering thrusters for manoeuvring the support vessel. No mooring lines are used or required between the support vessel and the carrier vessel.The only connection between the carrier vessel 10 and the support vessel is the hose 24. This can be quickly released and allow the support vessel 20 to be quickly disengaged from the carrier 10 in an emergency situation, e.g. fire, or for other reason, such as if the weather suddenly deteriorates to make it unfeasible to continue loading and recovering released VOC gases. However, the arrangement can facilitate continuing operations even when weather is difficult and otherwise could hinder the use of mooring lines.In this example, the oil to be loaded is transported to the mooring 5 through a seabed pipeline 3. The mooring 5 has conduits arranged to convey the fluid from the pipeline 3 to the hoses 2 which in turn connect to a midship manifold 15b of the carrier 10 for loading the carrier 10. Referring to Figure 2, a method has various steps as follows, using the same numbering of steps S1 to S7 as indicated in the figure:S1. The crude oil carrier 10 is moored. The load tubing 2 is connected to the carrier 10. S2. The support vessel 20 is moved into position alongside the carrier 10, and the supply hose 24 is connected to the carrier.S3. Loading of crude oil is performed. As loading takes place, VOC gases or vapour from the cargo tanks of the carrier are displaced from the tanks and conveyed through the connected hose 24 to the processing facility 22 of the support vessel 20 and the VOCs are processed. The VOC components of the gas or vapour are turned into liquid, e.g. condensed, and the liquid is stored in one or more tanks 23 on the support vessel.S4. Once loading is complete, the support vessel 20 and the tubing 24 is disconnected from the carrier 10. The carrier 10 disconnects from the mooring and travels across sea to transport the loaded crude oil to the destination.S5. The liquid is typically discharged from the support vessel, e.g. if full or if greater capacity is required before further operation of the support vessel. For example, the support vessel 20 travels to port and the tank of stored liquid is discharged by transferring liquid out of the tank 23 to another facility or recipient. The liquid comprising VOCs which is discharged is typically reinjected into crude oil or utilized for other purposes onshore or alternatively is transhipped. The support vessel 20 may then return to be positioned near the mooring or near another mooring and is then used in connection with loading another carrier. The support vessel 20 can stay near the mooring or berth that has been vacated and/or may travel to another nearby mooring location without discharging the tanks of liquid, ready for further use, if the tanks 23 on the support vessel 20 have sufficient capacity for accommodating expected liquid produced in that further use.S6 & S7. Another crude oil carrier is moored at the same or another mooring or berth. The support vessel 20 is moved into position alongside the other carrier, the hose 24 is connected and the steps S1 to S5 are then repeated in respect of the other carrier, making use of the support vessel 20 to recover the VOCs when loading the crude oil onto the carrier. In Figure 3, the support vessel 20 is used in connection with the crude oil carrier 10 moored to a Sea Island 105. Loading then takes place through the pipelines 102 from the Sea Island 105. The Sea Island is a fixed structure and connected to a jetty extending typically from shore. The VOC gases are recovered by the processing facility 22 onboard the support vessel 20 in corresponding manner as for other moorings of the carrier 10.The use of the support vessel 20 with the VOC recovery means 21 onboard can facilitate efficient and regular loading of large crude oil tankers 10, each of which can take up to 2 days, e.g. as may typically be desired 4 to 6 times per week, with full VOC handling. The system allows providing the VOC service to multiple tankers from one support vessel, allowing rapid and more convenient adoption of VOC capture that is especially suited for production regions where transport of large quantities of produced oil over long distances across sea may be needed. Tankers can advantageously be filled without modification of the ship, with standard equipment sufficient, as the support vessel 20 merely connects onto the mid ship manifold with the hose 24. Operations using the support vessel and system as described above may allow large amounts of VOC to be recovered and it is estimated over a fleet of 50 ships that the solution could provide reductions in yearly emissions to the atmosphere compared with traditional operations of up to 30% CO2 equivalence of current day emissions from mainland Norway.
Claims
CLAIMS1. A system (1) comprising:a carrier vessel (10) for carrying fluid hydrocarbon cargo across sea, the hydrocarbon cargo to be loaded into at least one cargo tank (12) of the vessel (10);the system (1) being c h a r a c t e r i s e d b y further comprising:a support vessel (20);volatile organic compound recovery means (21) on the support vessel (20) for recovering volatile organic compounds, the volatile organic compounds being produced from the cargo tank (12) in loading the cargo tank (12), in use; andat least one hose (24) extending between the carrier vessel (10) and the support vessel (20) for communicating gas comprising volatile organic compounds through the hose (24) from the cargo tank (12) of the carrier vessel (10) to the volatile organic compound recovery means (21) on the support vessel (20).2. The system as claimed in claim 1, wherein the support vessel (20) has a dynamic positioning system for positioning the support vessel (20) with respect to the carrier vessel (10).3. The system as claimed in claim 1 or claim 2, wherein the support vessel (20) is a platform supply vessel, PSV.4. The system as claimed in any preceding claim, further comprising an offshore mooring (5, 105), wherein the carrier vessel (10) is moored to the mooring (5, 105).5. The system as claimed in any preceding claim, wherein the carrier vessel (10) is a crude oil carrier and the fluid hydrocarbon cargo comprises crude oil.6. The system as claimed in any preceding claim, wherein the volatile organic compound recovery means (21) comprises a volatile organic compound processing facility (22) for processing the volatile organic compounds from the supplied gas.7. The system as claimed in claim 6, wherein the volatile organic compound recovery means (21) further comprises at least one storage tank (23) for storing liquid comprising volatile organic compounds.8. The system as claimed in claim 6 or 7, wherein the volatile organic compound processing facility (22) is configured to liquefy the volatile organic compounds from the gas to obtain a liquid comprising liquefied volatile organic compounds.9. A support vessel (20) for assisting in loading fluid hydrocarbon cargo into at least one cargo tank (12) of a carrier vessel (10), the carrier vessel (10) to transport the loaded fluid hydrocarbon cargo across sea,c h a r a c t e r i s e d i n thatthe support vessel (20) comprises onboard volatile organic compound recovery means (21) for recovering volatile organic compounds, the volatile organic compounds being produced from the cargo tank (12) in loading the cargo tank (12) of the carrier vessel (10).10. The support vessel as claimed in claim 9, further comprising at least one hose (24) for extending between the carrier vessel (10) and the support vessel (20) for communicating the gas comprising volatile organic compounds from the cargo tank (12) of the carrier vessel (10) to the processing facility (22) on the support vessel (20).11. The support vessel as claimed in claim 9 or claim 10, further comprising dynamic positioning and propulsion means for positioning and controlling the heading of the support vessel (20) with respect to the carrier vessel (10).12. A method comprising the step of:loading fluid hydrocarbon cargo into at least one cargo tank (12) of a carrier vessel (10); the method being c h a r a c t e r i s e d b y further comprising the steps of: providing at least one support vessel (20) to facilitate in said loading step, the support vessel (20) provided with volatile organic compound recovery means (21) onboard;recovering volatile organic compounds, the volatile organic compounds being produced from the cargo tank (12) in the step of loading the cargo tank (12);supplying gas comprising volatile organic compounds from the cargo tank (12) of the carrier vessel (10) to the volatile organic compound recovery means (21) on the support vessel (20) through at least one hose (24) which extends between the carrier vessel (10) and the support vessel (20).13. The method as claimed in claim 12, which further comprises the steps of:disconnecting the support vessel (20) from the carrier vessel (10) by disconnecting the connecting hose (24) from either or both of the support vessel (20) and the carrier vessel (10);transporting the loaded fluid hydrocarbon cargo across sea on the carrier vessel (10); using the support vessel (20) to facilitate in loading another carrier vessel which is moored at the same (5) or another mooring.14. The method as claimed in claim 12 or 13, which further comprises:storing liquid comprising volatile organic compounds from the recovery means (21) in at least one storage tank (23) on the support vessel (20);discharging at least some of the liquid from the storage tank (23) of the support vessel (20); andtransmitting the discharged liquid through tubing to at least one onshore facility.15. The method as claimed in any of claims 12 to 14, wherein the recovery means (21) comprises a processing facility (22) on the support vessel (20), and the method further comprises:operating the processing facility (22) to liquefy volatile organic compounds from the gas supplied to the processing facility (22); andstoring liquid comprising the liquefied volatile organic compounds in at least one storage tank (23) on the support vessel (20).16. The method as claimed in claim 15, which further comprises liquefying the volatile organic compounds of the gas by cooling and condensing the gas to obtain volatile organic compound condensate liquid.PATENTKRAV1. System (1) omfattende:et fraktfartøy (10) for å frakte flytende hydrokarbonlast over sjø, hvor hydrokarbonlasten skal lastes i minst én lasttank (12) i fartøyet (10);hvor systemet (1) er k a r a k t e r i s e r t v e d videre å omfatte:et støttefartøy (20);midler (21) for gjenvinning av flyktige organiske forbindelser på støttefartøyet (20), for å gjenvinne flyktige organiske forbindelser, idet de flyktige organiske forbindelsene produseres fra lasttanken (12) under lasting av lasttanken (12), under bruk; og minst én slange (24) som strekker seg mellom fraktfartøyet (10) og støttefartøyet (20), for å overføre gass omfattende flyktige organiske forbindelser gjennom slangen (24), fra lasttanken (12) i fraktfartøyet (10) til midlene (21) for gjenvinning av flyktige organiske forbindelser på støttefartøyet (20).2. Systemet ifølge krav 1, hvor støttefartøyet (20) har et dynamisk posisjoneringssystem for posisjonering av støttefartøyet (20) i forhold til fraktfartøyet (10).3. Systemet ifølge krav 1 eller krav 2, hvor støttefartøyet (20) er et plattformforsyningsfartøy.4. Systemet ifølge hvilket som helst av de foregående krav, videre omfattende en fortøyning (5, 105) til havs, hvor fraktfartøyet (10) er fortøyd til fortøyningen (5, 105).5. Systemet ifølge hvilket som helst av de foregående krav, hvor fraktfartøyet (10) er et råoljefraktfartøy, og den flytende hydrokarbonlasten omfatter råolje.6. Systemet ifølge hvilket som helst av de foregående krav, hvor midlene (21) for gjenvinning av flyktige organiske forbindelser omfatter et prosesseringsanlegg (22) for flyktige organiske forbindelser, for prosessering av de flyktige organiske forbindelsene fra den tilførte gassen.7. Systemet ifølge krav 6, hvor midlene (21) for gjenvinning av flyktige organiske forbindelser videre omfatter minst én lagertank (23) for lagring av væske omfattende flyktige organiske forbindelser.8. Systemet ifølge krav 6 eller 7, hvor prosesseringsanlegget (22) for flyktige organiske forbindelser er konfigurert til å væskedanne de flyktige organiske forbindelsene fra gassen, for å oppnå en væske omfattende væskedannede flyktige organiske forbindelser.9. Støttefartøy (20) for å assistere ved lasting av flytende hydrokarbonlast i minst én lasttank (12) i et fraktfartøy (10), hvor fraktfartøyet (10) skal transportere den lastede flytende hydrokarbonlasten over sjø,k a r a k t e r i s e r t v e d at:støttefartøyet (20) omfatter midler (21) for gjenvinning av flyktige organiske forbindelser ombord, for å gjenvinne flyktige organiske forbindelser, idet de flyktige organiske forbindelsene produseres fra lasttanken (12) ved lasting av lasttanken (12) i fraktfartøyet (10).10. Støttefartøyet ifølge krav 9, videre omfattende minst én slange (24) for strekking mellom fraktfartøyet (10) og støttefartøyet (20), for å overføre gassen omfattende flyktige organiske forbindelser fra lasttanken (12) i fraktfartøyet (10) til prosesseringsanlegget (22) på støttefartøyet (20).11. Støttefartøyet som angitt i krav 9 eller krav 10, videre omfattende dynamiske posisjonerings- og fremdriftsmidler for posisjonering og styring av kursen til støttefartøyet (20) i forhold til fraktfartøyet (10).12. Fremgangsmåte omfattende trinnet:å laste flytende hydrokarbonlast i minst én lasttank (12) i et fraktfartøy (10);hvor fremgangsmåten er k a r a k t e r i s e r t v e d videre å omfatte trinnene:å tilveiebringe minst ett støttefartøy (20) for å lette i nevnte lastetrinn, idet støttefartøyet (20) forsynt med midler (21) for gjenvinning av flyktige organiske forbindelser ombord;å gjenvinne flyktige organiske forbindelser, idet de flyktige organiske forbindelsene produseres fra lasttanken (12) i trinnet med lasting av lasttanken (12);å tilføre gass omfattende flyktige organiske forbindelser fra lasttanken (12) i fraktfartøyet (10) til midlene (21) for gjenvinning av flyktige organiske forbindelser på støttefartøyet (20) gjennom minst én slange (24) som strekker seg mellom fraktfartøyet (10) og støttefartøyet (20).13. Fremgangsmåten ifølge krav 12, som videre omfatter trinnene:å frakoble støttefartøyet (20) fra fraktfartøyet (10) ved å koble forbindelsesslangen (24) fra det ene av eller både støttefartøyet (20) og fraktfartøyet (10);å transportere den lastede flytende hydrokarbonlasten over sjø på fraktfartøyet (10); å bruke støttefartøyet (20) til å lette ved lasting av et annet fraktfartøy som er fortøyd ved den samme (5) eller en annen fortøyning.14. Fremgangsmåten ifølge krav 12 eller 13, som videre omfatter:å lagre væske omfattende flyktige organiske forbindelser fra midlene (21) for gjenvinning i minst én lagertank (23) på støttefartøyet (20);å losse minst noe av væsken fra lagertanken (23) i støttefartøyet (20); ogå overføre den lossede væsken gjennom rør til minst ett landanlegg.15. Fremgangsmåten ifølge hvilket som helst av kravene 12 til 14, hvor midlene (21) for gjenvinning omfatter et prosesseringsanlegg (22) på støttefartøyet (20), og fremgangsmåten videre omfatter:å drifte prosesseringsanlegget (22) for å væskedanne flyktige organiske forbindelser fra gassen som tilføres prosesseringsanlegget (22); ogå lagre væske omfattende de væskedannede flyktige organiske forbindelsene i minst én lagertank (23) på støttefartøyet (20).16. Fremgangsmåten som angitt i krav 15, som videre omfatter å væskedanne de flyktige organiske forbindelsene i gassen ved avkjøling og kondensering av gassen, for å oppnå kondensatvæske av flyktige organiske forbindelser.
Drawings

Priority


No priority

Patent classes


IPC classesB63B 27/25B63B 27/30B63B 27/24B01D 53/00B63B 25/08B67D 9/02B65D 90/30CPC classesB63B 27/25B63B 27/30B63B 27/24B01D 53/00B63B 25/08B67D 9/02B65D 90/30

Citations


WO 98/33026 A1 (A1)WO 2019/017796 A1 (A1)

Applicants, owners and inventors


Owners
VAHOLMEN VOC RECOVERY AS
Bark Silas' vei 8 4876 GRIMSTAD NO (GRIMSTAD Municipality, Agder county)Org. number: 916618980
Inventors
Alexander Lund
Bringsværveien 10 4885 GRIMSTAD NO (GRIMSTAD Municipality, Agder county)

Agent


HÅMSØ PATENTBYRÅ AS
HÅMSØ PATENTBYRÅ AS

Org. number: 918752900

Name and address are automatically synchronized with the Brønnøysund Register Centre.

Open in The Brønnøysund Register Centre
Postboks 9 4068 STAVANGER NO (STAVANGER Municipality, Rogaland county)
Org. number: 918752900
Reference: P29365NO00

Status history


Payment history


Oppositions and appeals


No oppositions or appeals

Administrative limitation


No administrative limitation

Liens and licences


No liens or licenses registered

Gazette entries


No Gazette entries foundOnly events from 2024.03.04 and onwards are shown.