Key information

Title
A floating fabrication arrangement and a method of building floating structures
Application number
20210670
Case type
National
Status
06.02.2023 Patent meddelt (B1)
Filed
26.05.2021
Effective date
26.05.2021
Publicly available
28.11.2022
Next annual fee due
31.05.2027
Applicant
Fred. Olsen Ocean Ltd. (NO)
Owner
MOBILE FABRICATION SITE AND PORT AS (NO)
Inventor
Geir Grimsrud (NO)
Agent
BRYN AARFLOT AS (NO)
Granted
06.02.2023
Patent number
346872
Expiry date
26.05.2041

Abstract and drawing


Disclaimer: This text has been machine-scanned and may contain errors – please refer to "Publications" for legally binding content.
A floating fabrication arrangement for building of floating structures (15). It comprises floating unit (1-4) having a continuous deck, at least one crane (5, 6) attached to said floating unit (1-4) and a mooring arrangement capable of mooring the floating unit (1-4) in a floating state on a body of water. The floating unit (1-4) having ballast chambers capable of ballasting and de-ballasting the floating unit (1-4) between a first building position where the floating unit (1-4) floats with the deck above water in a substantially horizontal position and a second inclined launch position, in which a first part of the deck is submerged and a second part of the deck is above water. A method of building floating structures is also described.

Publications


B1A1
Checking availability of the latest published version...

Documents


Expand Download files (28)
Date
Date Doc. No. Process Case number In/Out Journal description To/from
23.11.2023 02-01 Overdragelse av søknad/rettighet 2023/16612 UT GH Forespørsel BRYN AARFLOT AS
09.11.2023 01-02 Overdragelse av søknad/rettighet 2023/16612 INN Generalfullmakt NO Kunde 327918 BRYN AARFLOT AS
09.11.2023 01-01 Overdragelse av søknad/rettighet 2023/16612 INN Generell henvendelse BRYN AARFLOT AS
04.04.2023 13-01 Saksbehandling 20210670(346872) UT PT Varsel om betaling av første årsavgift (3317) (PT20210670) BRYN AARFLOT AS
10.02.2023 12-01 Saksbehandling 20210670(346872) UT PT Registreringsbrev nasjonal patent (15) (PT20210670)
21.11.2022 11-01 Saksbehandling 20210670 UT PT Meddelelse om patent PROTECTOR IP AS
06.09.2022 10-01 Saksbehandling 20210670 UT Generelt brev Patent uten frist PROTECTOR IP AS
05.09.2022 09-01 Saksbehandling 20210670 UT SV PT20210670 PT Henlagt manglede svar Deres refP6385NO00-AT PROTECTOR IP AS
05.09.2022 08-01 Saksbehandling 20210670 UT Generelt brev Patent uten frist PROTECTOR IP AS
05.09.2022 07-01 Saksbehandling 20210670 INN VS PT20210670 PT Henlagt manglede svar Deres refP6385NO00-AT PROTECTOR IP AS
02.09.2022 06-01 Saksbehandling 20210670 UT PT Henlagt manglede svar PROTECTOR IP AS
05.07.2022 05-05 Saksbehandling 20210670 INN P6385NO00 Translated claims into Norwegian PROTECTOR IP AS
05.07.2022 05-04 Saksbehandling 20210670 INN P6385NO00 Letter_to_NIPO PROTECTOR IP AS
05.07.2022 05-03 Saksbehandling 20210670 INN P6385NO00 Amended specification PROTECTOR IP AS
05.07.2022 05-02 Saksbehandling 20210670 INN P6385NO00 8 pages drawings PROTECTOR IP AS
05.07.2022 05-01 Saksbehandling 20210670 INN Korrespondanse (Hovedbrev inn) PROTECTOR IP AS
28.04.2022 04-02 Saksbehandling 20210670 INN PDF_486907583 PROTECTOR IP AS
28.04.2022 04-01 Saksbehandling 20210670 INN Korrespondanse (Hovedbrev inn) PROTECTOR IP AS
24.12.2021 03-02 Saksbehandling 20210670 UT PT report 12:47:00
24.12.2021 03-01 Saksbehandling 20210670 UT Substantive examination PROTECTOR IP AS
31.05.2021 02-01 Saksbehandling 20210670 UT Infobrev til oppfinner PROTECTOR IP AS
26.05.2021 01-07 Saksbehandling 20210670 INN P6385NO00 Statement PROTECTOR IP AS
26.05.2021 01-06 Saksbehandling 20210670 INN P6385NO00 Figures PROTECTOR IP AS
26.05.2021 01-05 Saksbehandling 20210670 INN P6385NO00 Description PROTECTOR IP AS
26.05.2021 01-04 Saksbehandling 20210670 INN P6385NO00 Claims PROTECTOR IP AS
26.05.2021 01-03 Saksbehandling 20210670 INN P6385NO00 Abstract PROTECTOR IP AS
26.05.2021 01-02 Saksbehandling 20210670 INN General POA - Fred. Olsen Ocean Ltd. - signed PROTECTOR IP AS
26.05.2021 01-01 Saksbehandling 20210670 INN Søknadsskjema Patent PROTECTOR IP AS

Description, claims and drawings


Disclaimer: This text has been machine-scanned and may contain errors – please refer to "Publications" for legally binding content. Description
Technical Field[0001] The present invention relates to a floating fabrication arrangement for building of floating structures, such as wind turbine foundations, as well as a method of building such structures.Background Art[0002] It is convenient to build floating structures either on shore or close to a quay. If the structure is built on shore, there must be a either a crane present that can lift the structure into the water or a slip to launch the structure into the water after the structure has been built.[0003] Alternatively, the structure can be built while it is floating. This can be done in a dry dock or on top of an already built floating sub-structure. If a dry dock is used, this has to have a sufficient size to accommodate the finished structure. For large structures there are a limited number of such docks available.[0004] These techniques generally require a sufficient water depth next to the quay to allow for the launch of the structure without the structure hitting the seabed. The only exception is if the structure is built in a dry dock, as it is then possible to tow the dock to a place with sufficient water depth.[0005] The above constraints put great limits on where a floating structure can be built. The limitations increase with the size and draught of the floating structure.[0006] It is therefore often necessary to tow the floating structure from a place suitable for building the structure to the place where it is to be deployed. The distance can be considerable. This does not only take time and is costly. It is also risky, as the tow will have to be done during good weather conditions. Last, but not least, it is not very environmentally friendly to tow the structure over large distances. Especially, when building wind turbines, which are supposed to reduce the carbon emission footprint, it is desirable to make the production as environmentally friendly as possible.[0007] The obvious solution to this would be to increase the water depth either by excavating the seabed close to an existing quay, or by building a quay, or extending an existing quay, into deeper waters. This is, however, not desirable both from an environmental perspective and due to the high costs.[0008] WO2016/138088 describes a fabrication arrangement for building floating structures. It comprises a floating unit having a deck. The floating unit can be ballasted to lower one side of the unit below the water surface to launch the floating structure.[0009] The floating structure is, however, not built on the floating unit, but on an adjacent quay, and then it is skidded onto the floating unit for launch. This requires a large quay, a solid skidding arrangement, and it puts limitations on the size of the floating structure.[0010] JPS5583678 describes a similar arrangement for launching boats that have been built on shore.[0011] SE443962 Shows a floating dock on which a large floating structure is built. The dock is adapted to be lowered with its deck sufficiently below the water for the floating structure to float above the deck. This requires a substantial depth at the side of deployment.[0012] There is consequently a great need for a new solution that makes it possible to build large floating structures at an existing facility close to where the structures are to be deployed, even though the water depth close to the existing facility is too shallow for the floating structure to float.Summary of invention[0013] The invention solves the above problem by the arrangement defined in the subsequent claim 1 and the method of the subsequent claim 11. Convenient embodiments are defined in the depending claims.Brief description of drawings[0014]Figure 1 shows a set of barges with cranes being towed to the building site, Figure 2 shows the set of barges assembled at the building site, Figure 3 shows a structure being erected on the set of barges,Figure 4 shows the finished structure on top of the set of barges,Figure 5 shows the structure about to be launched from the set of barges, Figure 6 shows the structure during launch,Figure 7 shows the structure floating outside of the set of barges, andFigure 8 illustrates the disassembly and towing away of the set of barges.Detailed description of the invention[0015] Figure 1 shows a set of barges 1 - 4 being towed to the construction site. The barges may be of a standard type or standard barges that are modified to be able to connect with each other. In the drawings are shown four barges, but depending on the size of deck area and the buoyancy required, the number of barges may be smaller or greater.[0016] Two cranes 5, 6, which are attached on top of a respective barge 1, 4 are also present. During the tow, the boom of the cranes is resting in a respective boom rest 7, 8.[0017] The barges can conveniently be towed by a single tow vessel 9 with tow lines extending between the barges 1-4. However, it would be safer to have at least two tow vessels, one at each end of the tow.[0018] When the barges 1-4 have reached their destination, i.e. a quay 10, the barges are lined up side-by-side and moored with one short side of the barges 1-4 next to the quay side. Preferably, the barges 1-4 abut the quay 10. Fenders may be placed between the barges and the quay. The mooring may comprise hawsers extending between the barges and the quay.[0019] The floating unit comprising the barges 1-4 may also be moored at some distance from the quay or in a secluded area, such as within a bay or fjord.[0020] Then the barges 1-4 are fixedly connected, such as by welding, to make up a single floating unit where the barges are unable to move or flex relative to each other. This process may also take place before the barges are moored. [0021] Instead of welding, the barges may also be firmly connected by devices that are attached between the barges. The connection should be made in such a way that the decks of the barges 1-4 are flush and that there are no obstacles protruding above the surface of the decks.[0022] The barges are arranged so that the two cranes 5, 6 are situated on a respective outer barge 1 and 4, and preferably close to the outer side of those barges as well as close to the inner end, i.e. the end next to the quay 10, of the barges 1, 4. For the building of smaller floating structures, one crane 5 may be sufficient.[0023] Due to tidal differences, the deck of the barges 1-4, i.e. the floating unit will be at different altitudes relative to the quay 10. This can be at least partially compensated for by varying the ballast of the barges. Nevertheless, a ramp (not shown) may be arranged between the barges 1-4 and the quay 10. The ramp may be a small ramp solely for persons and small carry-on goods but may also be a larger ramp that can be crossed by vehicles.[0024] The barges may also have moorings lines, such as ropes or chains, attached to their sides distal from the quay side at one end and attached to anchors at another end, such as suction anchors, placed at the seabed distant from the quay side.[0025] With the barges 1-4 thus moored, the building of the sub-structure may commence. The elements from which the sub-structure is to be built, are brought to the quay either by lorry of by boat. The elements are conveniently hoisted onto the deck of the barges 1-4 by the cranes 5, 6.[0026] In an alternative embodiment, the floating unit may be purpose-built as a single or multi hull structure instead of assembling it from barges.[0027] Figure 3 shows two columns 11, 12 of the sub-structure having been installed and interconnected by struts 13. The connections are conveniently made by welding the pipes of the struts together.[0028] In figure 4 a third column 14 has been installed and connected to the two first columns 11, 12. The sub-structure 15 is now completed.[0029] Figure 5 shows a first step of the launching process. The booms of the cranes 5, 6 have been lowered onto the boom rests 7, 8 and secured thereto. The barges are ballasted by letting water flow into ballast chambers at the distal end of the barges 1-4. This ballasting causes the distal ends of the barges 1-4 to sink into the water. The flow of water into the ballasting chambers continues until the two columns 12, 14 closest to the outer edge of the barges 1-4 are partially submerged under water, and preferably floats off from the deck of the barges 1-4.[0030] When the barges 1-4 have reached a sufficient inclination for the substructure 15 to slide off the deck and into the water, any ties between the substructure and the barges 1-4 are released. A winch or similar may also be activated to pull the sub-structure along the deck if it will not slide due to gravity.[0031] In figure 6 the sub-structure 15 has almost completely slid off the deck, and the innermost column 11 has started to float.[0032] In figure 7 the sub-structure 15 is floating outside of the barges 1-4. At this distance from the quayside, the water depth is sufficient for the sub-structure 15 to float without touching the seabed. It can now be towed to a convenient nearby site for installation of the super-structure such as a wind turbine.[0033] After the launch of the sub-structure 15, the barges 1-4 are de-ballasted by pumping the water in the ballasting chambers out, so that the barges 1-4 are brought up to float with the deck in a horizontal plane. Building of the next sub-structure can then be started.[0034] When the planned number of sub-structures have been built and launched as described above, the barges 1-4 are disconnected from each other and towed away. Alternatively, the barges 1-4 may also be towed as one unit if the next use of the barges is as a single unit, such as at another location.
Claims
Claims1. A floating fabrication arrangement for building of floating structures (15), characterised in that it comprises a floating unit (1, 2, 3, 4) having a continuous deck, at least one crane (5, 6) attached to said floating unit (1, 2, 3, 4) and a mooring arrangement capable of mooring the floating unit (1, 2, 3, 4) in a floating state on a body of water, the floating unit (1, 2, 3, 4) having ballast chambers capable of ballasting and de-ballasting the floating unit (1, 2, 3, 4) between a first building position where the floating unit (1, 2, 3, 4) floats with the deck above water in a substantially horizontal position and a second inclined launch position, in which a first part of the deck is submerged and a second part of the deck is above water.2. The arrangement of claim 1, characterised in that the floating unit (1, 2, 3, 4) is assembled from a plurality of barges that are firmly interconnected.3. The arrangement of claim 1 or 2, characterised in that said arrangement is adapted to be moored next to a quay-side (10), and said first part of the deck is next to a distal side of the floating unit (1, 2, 3, 4), i.e. facing away from said quay-side (10), and said second part of the deck is next to a proximal side of the floating unit (1, 2, 3, 4), i.e. facing towards the quay-side (10).4. The arrangement of any of the preceding claims, characterised in that the barges (1, 2, 3, 4) are interconnected with their long sides facing each other.5. The arrangement of any of the preceding claims, characterised in that it comprises two cranes (5, 6) arranged on the deck of the outermost barges (1, 4).6. The arrangement of any of the preceding claims, characterised in that the barges (1, 2, 3, 4) are connected to each other by welding.7. The arrangement of any of the claims 1-5, characterised in that the barges (1, 2, 3, 4) are connected to each other by devices attached between the barges (1, 2, 3, 4).8. The arrangement of any of the claims 3-7, characterised in that it comprises a ramp extending between the quay (10) and the floating unit (1, 2, 3, 4).9. The arrangement of any of the claims 3-8, characterised in that said mooring comprises hawsers attaching the floating unit (1, 2, 3, 4) to the quay (10).10. The arrangement of claim 9, characterised in that the mooring also comprises mooring lines attached between said floating unit (1, 2, 3, 4) and one or more anchors at the seabed.11. A method of building floating structures, characterised in the following steps:a. mooring a floating unit (1, 2, 3, 4) having a continuous deck on a body of water,b. bringing elements to build said floating structure (15) to said floating unit (1, 2, 3, 4),c. lifting said elements onto said deck and interconnecting said elements to erect said floating structure (15),d. ballasting said floating unit (1, 2, 3, 4) into an inclined position, to bring a first part of said deck below the surface of the water,e. sliding said completed floating structure (15) off of said floating unit (1, 2, 3, 4) and into said water,f. de-ballasting said floating unit (1, 2, 3, 4) to bring the deck completely out of the water.12. The method of claim 11, characterised in that it further comprises:a. firmly interconnecting a plurality of barges (1, 2, 3, 4) to form a single floating unit having a continuous deck,b. mooring said unit (1, 2, 3, 4) next to a quay (10),c. bringing elements to build said floating structure (15) to said quay (10) prior to lifting said elements onto said deck.Patentkrav1. Et flytende fabrikasjonsarrangement for bygging av flytende strukturer (15), karakterisert ved at det omfatter en flytende enhet (1, 2, 3, 4) som har et sammenhengende dekk, minst én kran (5, 6) festet til den flytende enheten (1, 2, 3, 4) og et forankringsarrangement som er i stand til å forankre den flytende enheten (1, 2, 3, 4) i flytende tilstand på en vannmasse, at den flytende enheten (1, 2, 3, 4) har ballastkammere som er i stand til å ballastere og deballastere den flytende enheten (1, 2, 3, 4) mellom en første posisjon der den flytende enheten (1, 2, 3, 4)flyter med dekket over vann i en hovedsakelig horisontal posisjon og en andre skråstilt sjøsettingsposisjon, der en første del av dekket er under vann og en andre del av dekket er over vann.2. Arrangementet ifølge krav 1, karakterisert ved at den flytende enheten (1, 2, 3, 4) er sammenstilt av flere lektere som er fast forbundet med hverandre.3. Arrangementet ifølge krav 1 eller 2, karakterisert ved at arrangementet er tilpasset for å forankres ved en kaiside (10), og at den første delen av dekket er ved en fjern side av den flytende enheten (1, 2, 3, 4), dvs. som vender bort fra kaisiden (10), og at den andre delen av dekket er ved en nær side av den flytende enheten (1, 2, 3, 4), dvs. som vender mot kaisiden (10).4. Arrangementet ifølge et hvilket som helst av de foregående krav, karakterisert ved at lekterne (1, 2, 3, 4) er forbundet med hverandre med langsidene mot hverandre.5. Arrangementet ifølge et hvilket som helst av de foregående krav, karakterisert ved at det omfatter to kraner (5, 6) anordnet på dekket av de ytterste lekterne (1, 4).6. Arrangementet ifølge et hvilket som helst av de foregående krav, karakterisert ved at lekterne (1, 2, 3, 4) er forbundet med hverandre ved sveising.7. Arrangementet ifølge et hvilket som helst av kravene 1-5, karakterisert ved at lekterne (1, 2, 3, 4) er forbundet med hverandre ved innretninger festet mellom lekterne (1, 2, 3, 4).8. Arrangementet ifølge et hvilket som helst av kravene 3-7, karakterisert ved at det omfatter en rampe som strekker seg mellom kaien (10) og den flytende enheten (1, 2, 3, 4).9. Arrangementet ifølge et hvilket som helst av kravene 3-8, karakterisert ved at forankringen omfatter trosser som forbinder den flytende enheten (1, 2, 3, 4) til kaien (10).10. Arrangementet ifølge krav 9, karakterisert ved at forankringen også omfatter forankringsliner som er festet mellom den flytende enheten (1, 2, 3, 4) og ett eller flere ankere på havbunnen.11. An fremgangsmåte for å bygge flytende strukturer, karakterisert ved følgende trinn:a. forankre en flytende enhet (1, 2, 3, 4) som har et sammenhengende dekk på en vannmasse,b. bringe elementer for å bygge nevnte flytende struktur (15) til den flytende enheten (1, 2, 3, 4),c. løfte elementene over på dekket og forbinde elementene med hverandre for å reise den flytende strukturen (15),d. ballastere den flytende enheten (1, 2, 3, 4) til en skråstilt posisjon, for å bringe en første del av dekket under vannflaten,e. la den fullførte flytende strukturen (15) gli av den flytende enheten (1, 2, 3, 4) og ut i vannet,f. de-ballastere den flytende enheten (1, 2, 3, 4)for å bringe dekket helt ut av vannet.12. Fremgangsmåten ifølge krav 11, karakterisert ved at den videre omfatter:a. forbinde fast et antall lektere (1, 2, 3, 4) med hverandre for å danne en enkel flytende enhet som har et sammenhengende dekk,b. forankre nevnte enhet (1, 2, 3, 4) ved siden av en kai (10), c. bringe elementer for å bygge den flytende strukturen (15) til kaien (10) før de løftes over på dekket.
Drawings

Priority


No priority

Patent classes


IPC classesB63B 35/00B63B 35/28B63B 35/30B63B 35/34B63B 35/38B63B 35/42B63B 35/44B63C 1/02E02B 17/00CPC classesB63B 35/00B63B 35/003B63B 35/28B63B 35/301B63B 35/34B63B 35/38B63B 35/42B63B 35/44B63C 1/02E02B 2017/0047

Citations


WO 2016/138088 A1 (A1)JP S5583678 A (A)SE 443962 B (B)

Applicants, owners and inventors


Owners
MOBILE FABRICATION SITE AND PORT AS
Postboks 1159 Sentrum 0107 OSLO NO (OSLO Municipality, Oslo county)Org. number: 928491765
Inventors
Geir Grimsrud
Hestestien 10 1555 SON NO (VESTBY Municipality, Akershus county)

Agent


BRYN AARFLOT AS
BRYN AARFLOT AS

Org. number: 979993269

Name and address are automatically synchronized with the Brønnøysund Register Centre.

Open in The Brønnøysund Register Centre
Stortingsgata 8 0161 OSLO NO (OSLO Municipality, Oslo county)
Org. number: 979993269
Reference: P6385NO00-AT

Status history


Payment history


Oppositions and appeals


No oppositions or appeals

Administrative limitation


No administrative limitation

Liens and licences


No liens or licenses registered

Gazette entries


No Gazette entries foundOnly events from 2024.03.04 and onwards are shown.