Key information

Title
A tension monitoring device
Application number
20210920
Case type
National
Status
Filed
20.07.2021
Effective date
20.07.2021
Publicly available
23.01.2023
Next annual fee due
31.07.2027
Applicant
Seasystems AS (NO)
Owner
Seasystems AS (NO)
Inventor
Torkjell Lisland (NO)
Agent
BRYN AARFLOT AS (NO)
Granted
11.05.2026
Patent number
349793
Expiry date
20.07.2041

Abstract and drawing


Disclaimer: This text has been machine-scanned and may contain errors – please refer to "Publications" for legally binding content.
A tension monitoring device, in particular for monitoring tension in mooring lines, comprising an H-link (1) for coupling into a mooring line, and a power and communication unit (4). The H-link (1) comprises at least one shear load bolt (3), containing at least one strain gauge. The shear load bolt (3) comprises an integrated power and processing unit (PPU) (10) and having a receptacle capable of receiving the power and communication unit (PCU) (4) after the H-link has been deployed into the sea.

Publications


B1A1
Checking availability of the latest published version...

Documents


Expand Download files (45)
Date
Date Doc. No. Process Case number In/Out Journal description To/from
15.05.2026 17-01 Saksbehandling 20210920(349793) UT PT Registreringsbrev nasjonal patent (15) (PT20210920)
04.03.2026 16-01 Saksbehandling 20210920 UT PT Meddelelse om patent BRYN AARFLOT AS
30.12.2025 15-05 Saksbehandling 20210920 INN P6447NO00 Response letter to NIPO 30Dec2025 BRYN AARFLOT AS
30.12.2025 15-04 Saksbehandling 20210920 INN P6447NO00 Patentkrav norsk oversettelse BRYN AARFLOT AS
30.12.2025 15-03 Saksbehandling 20210920 INN P6447NO00 Amended specification - 30DES2025 - with annotations BRYN AARFLOT AS
30.12.2025 15-02 Saksbehandling 20210920 INN P6447NO00 Amended specification - 30DES2025 - clean copy BRYN AARFLOT AS
30.12.2025 15-01 Saksbehandling 20210920 INN Korrespondanse (Hovedbrev inn) BRYN AARFLOT AS
10.10.2025 14-01 Saksbehandling 20210920 UT Realitet patent BRYN AARFLOT AS
10.07.2025 12-01 Saksbehandling 20210920 INN Korrespondanse (Hovedbrev inn) BRYN AARFLOT AS
09.07.2025 13-02 Saksbehandling 20210920 INN 20210920_4 Korrespondanse (Hovedbrev inn) BRYN AARFLOT AS
09.07.2025 13-01 Saksbehandling 20210920 INN Korrespondanse (Hovedbrev inn) BRYN AARFLOT AS
09.07.2025 11-01 Saksbehandling 20210920 INN Korrespondanse (Hovedbrev inn) BRYN AARFLOT AS
12.06.2025 10-01 Saksbehandling 20210920 INN Korrespondanse (Hovedbrev inn) BRYN AARFLOT AS
20.12.2023 09-09 Saksbehandling 20210920 INN Norwegian translation of claims marked up BRYN AARFLOT AS
20.12.2023 09-08 Saksbehandling 20210920 INN Norwegian translation of claims clean copy BRYN AARFLOT AS
20.12.2023 09-07 Saksbehandling 20210920 INN Letter to NIPO 20Dec2023 BRYN AARFLOT AS
20.12.2023 09-06 Saksbehandling 20210920 INN IPRP Chapter II.pdf BRYN AARFLOT AS
20.12.2023 09-05 Saksbehandling 20210920 INN Amended description marked-up BRYN AARFLOT AS
20.12.2023 09-04 Saksbehandling 20210920 INN Amended description clean copy BRYN AARFLOT AS
20.12.2023 09-03 Saksbehandling 20210920 INN Amended claims marked-up BRYN AARFLOT AS
20.12.2023 09-02 Saksbehandling 20210920 INN Amended claims clean copy BRYN AARFLOT AS
20.12.2023 09-01 Saksbehandling 20210920 INN Korrespondanse (Hovedbrev inn) BRYN AARFLOT AS
06.06.2023 08-01 Saksbehandling 20210920 UT PT Varsel om betaling av første årsavgift (3317) (PT20210920) BRYN AARFLOT AS
27.12.2022 07-07 Saksbehandling 20210920 INN Norwegian translation of claims PROTECTOR IP AS
27.12.2022 07-06 Saksbehandling 20210920 INN Letter to NIPO PROTECTOR IP AS
27.12.2022 07-05 Saksbehandling 20210920 INN Amended description - clean PROTECTOR IP AS
27.12.2022 07-04 Saksbehandling 20210920 INN Amended description - annotated PROTECTOR IP AS
27.12.2022 07-03 Saksbehandling 20210920 INN Amended claims - clean PROTECTOR IP AS
27.12.2022 07-02 Saksbehandling 20210920 INN Amended claims - annotated PROTECTOR IP AS
27.12.2022 07-01 Saksbehandling 20210920 INN Korrespondanse (Hovedbrev inn) PROTECTOR IP AS
25.10.2022 06-01 Saksbehandling 20210920 UT Realitet patent PROTECTOR IP AS
11.07.2022 05-02 Saksbehandling 20210920 INN Brev_til_Patentstyret PROTECTOR IP AS
11.07.2022 05-01 Saksbehandling 20210920 INN Korrespondanse (Hovedbrev inn) PROTECTOR IP AS
08.07.2022 04-02 Saksbehandling 20210920 INN PDF_498029949 PROTECTOR IP AS
08.07.2022 04-01 Saksbehandling 20210920 INN Korrespondanse (Hovedbrev inn) PROTECTOR IP AS
13.01.2022 03-02 Saksbehandling 20210920 UT PT report 11:16:17
13.01.2022 03-01 Saksbehandling 20210920 UT Realitet patent PROTECTOR IP AS
20.07.2021 02-01 Saksbehandling 20210920 UT Infobrev til oppfinner PROTECTOR IP AS
20.07.2021 01-07 Saksbehandling 20210920 INN P6447NO00 krav PROTECTOR IP AS
20.07.2021 01-06 Saksbehandling 20210920 INN P6447NO00 Erklæring_om_søkers_rett_til_oppfinnelsen PROTECTOR IP AS
20.07.2021 01-05 Saksbehandling 20210920 INN P6447NO00 beskrivelse PROTECTOR IP AS
20.07.2021 01-04 Saksbehandling 20210920 INN P6447NO00 Abstract PROTECTOR IP AS
20.07.2021 01-03 Saksbehandling 20210920 INN P6447NO00 - tegninger (2 blad) PROTECTOR IP AS
20.07.2021 01-02 Saksbehandling 20210920 INN GPOA Seasystems AS PROTECTOR IP AS
20.07.2021 01-01 Saksbehandling 20210920 INN Søknadsskjema Patent PROTECTOR IP AS

Description, claims and drawings


Disclaimer: This text has been machine-scanned and may contain errors – please refer to "Publications" for legally binding content. Description
3497931A TENSION MONITORING DEVICETechnical Field[0001] The present invention relates to a tension monitoring device and in particular a tension monitoring device for mooring lines.5 Background Art[0002] When mooring lines are used to moor a floating structure, such as a drilling vessel, an FPSO (Floating production and Storage Offloading system), a floating wind turbine, fish farms, etc., it is important to ensure both that the pre-tension, that the mooring line has received during installation, is maintained and also that the 10 mooring line is not subjected to tension exceeding the design limits of the components. Hence there have for a long time been applied tension measuring devices to such mooring lines to monitor the tension. The tension is recorded over time to evaluate fatigue of the mooring components.[0003] The tension monitoring devices are found in a wide range of varieties and 15 types. The most widely used types are either direct in-line monitoring, indirect monitoring or angular displacement and position monitoring[0004] Direct in-line monitoring systems require a monitoring element which can take the full mooring load and it is acting as a structural part of the mooring system. Typically, this element is a shear load bolt connecting two links of the mooring line.20 [0005] Indirect tension monitoring can be achieved in a number of ways. A typical example is to measure the strain/elongation in the structural steel of a mooring line component with a strain gauge, linear transducer or a solution based on optics.[0006] Angular displacement and position monitoring is a method where the relative angle of the mooring line is measures with an angular transducer, typically an 25 inclinometer or accelerometer.[0007] From an accuracy point of view, the direct in-line monitoring is the best. Indirect and angular displacement monitoring have challenges with respect to accuracy of the actual tension monitoring even though the monitoring equipment itself may be very accurate.30 [0008] From an operability and service point of view. Indirect and angular displacement principles have advantages, as they may be replaced without 3497932interfering with the actual mooring line. If a replacement of the direct in-line monitoring equipment is to be performed, the tension in the mooring line has to be relieved, and the remaining mooring lines will have to take up the load of the subjected mooring line.5 [0009] An additional challenge of all the above-mentioned equipment is that they will have to be located close to the hull of the floating installation so that electrical wires and connectors can be coupled to read the signals from the tension monitoring devices. In this location the environment is hostile and difficult to access with ROV and divers for service and replacement.10 [0010] In general, long term tension monitoring is very hard to achieve due to failure of the electronics in the shear load bolt, cabling, and electrical connectors in a hostile environment close to the hull. This equipment does fail over time and replacement is challenging and expensive.[0011] There are many known devices for transferring data or power through an 15 inductive coupling, such as:[0012] CA2062815, which describes a sensor arranged on a shaft for measuring torsion in the shaft. A detector outside the shaft contains a transceiver to communicate with the sensor via an antenna.[0013] EP2554962 describes the use of surface acoustic wave (SAW) sensors to 20 detect stress or tension in the part to be monitored. The reading of the sensors is done by an inductive coupling with an external reader.[0014] EP3517914 describes a load measuring device monitoring an element subjected to load. The measure data are transferred wirelessly to an external unit by either RFID or WLAN.25 [0015] DE102019000605 describes a sensor with a power supply. The power supply can receive energy from an external energy transmitter to be charged. Moreover, information can also be sent wirelessly between the sensor and an external receiver.[0016] US20200182715 describes a strain sensor to be attached by adhesive to a structural element. The signals from the sensor can be transferred wirelessly to a 30 receiver. The sensor can be supplied with power through an inductive coupling. 3497933[0017] US20100076701 describes a load gauge that can communicate wirelessly with an external receiver.[0018] EP2912417 describes a waterproof sensor that can communicate wirelessly.[0019] US 2017/225749 describes a mooring link, which consists of two main parts, 5 a male part and a female part. A bolt holds these two parts together. A tension sensor is arranged in the female part, and this communicates with the bolt via an inductive coupling. Via this coupling is also electric power transferred. Due to the inductive coupling, it is possible to pull the bolt out of the link. However, when the bolt is pulled out of the link, the mechanical coupling between the male and the female 10 part is broken. It is in fact not possible to pull the bolt when the mooring line is in tension, as the bolt will be clamped between the male and female part. To pull the bolt, the mooring line has first to be slackened. When the mooring line has been slackened and the bolt is pulled, the mooring line will drop to the seabed.[0020] In order to avoid the dropping of the mooring line, the upper end will either 15 have to be taken on board the floating structure or a temporary connection between the mooring line and the vessel has to be established.[0021] US 3992 934 describes a link with the same problem as the previous reference. As for US 2017/225749 it is not possible to remove the power- and communication module from the link. The communication takes place via a cable that 20 is connected to the end of the bolt. A power supply has not been explained, but is would be natural that the power also goes via the same cable. The cable is coupled to a cover. At the inside of the cover is a cavity in which an amplifier is placed. The cavity is filled with transformer oil. Hence, it is not possible to open the cover while the coupling is below water in order to remove the communication module.25 [0022] The bolt also forms a part of the mechanical coupling of the link, so it cannot be removed when the link is in tension. If the bolt is to be removed, the same challenges as for US 2017/225749 will arise.[0023] US 2003/128138 A1 describes a sensor in a mooring arrangement. No replaceable part is described in connection with this. However, US 2003/128138 30 refers to DE 7715 093 U1, which describes a sensor that has been arranged in a recess in the bolt. It is stated clearly that the recess is filled with a casting material. In addition, the recess may be closed by plates that are fixed to the ends of the bolt. 3497934Hence it is not possible to pull out any of the internal parts of the bolt separately. The bolt must be removed as an entity. DE 7715 093 U1 does not describe any arrangement of the bolt in a link. If the bolt is used in the arrangement of US 2003/128138, it would somehow form a part of the mechanical coupling of the link 5 and hence only be removable when the mooring line has been slackened.[0024] GB2501303 describes a link having heavily encapsulated electronic components. It is not possible to replace any of these parts, such as a battery while the link is in the sea.[0025] Despite the above known solutions to communicate wirelessly with a strain 10 gauge and also to provide power through an inductive coupling, no known attempts have been made to implement such technology into direct in-line monitoring of mooring lines. In this field the load sensor is coupled by a cable to the receiver at the floating installation. Hence, the strain gauge is placed as close as possible to the floating structure, so that the cable becomes as short as possible. As described 15 above, this places the strain gauge in a very hostile environment, where it is subjected to impact from waves and a very corrosive environment with a mixture of air and seawater.[0026] Moreover, the cable either has to be connected when the mooring line is being deployed or it has to be connected after deployment. The latter imposes 20 hazard to the persons involved in the hook-up of the cable, as they have to work on the outside of the floating structure in the splash zone. The former involves the risk of the cable becoming snatched and break during the deployment.Summary of invention[0027] The present invention has as its main objectives to improve long term tension 25 monitoring and reduce the cost of replacement by moving the tension monitoring device away from the hull of the floating structure and removing the need for exposed electric cabling and connectors. The device according to the invention therefore has no protruding parts when it is being deployed into the sea.[0028] The present invention has as a further objective to provide a link having a 30 removable power and communication unit that can be pulled without having to slacken the mooring line and break the mechanical coupling of the link. 3497935[0029] These and other objectives are achieved by the features defined in the appended independent claim 1.[0030] What is important here is that no parts of the shear load bolt can be damaged when the H-link is installed. It should therefore be understood that the outer boundary 5 or outer surface of the H-link also can be formed by a protective structure integrated welded, welded to or otherwise firmly fixed to the H-link, so that the protective structure effectively is in one piece with the H-link.Brief description of drawings[0031]10 Figure 1 shows the H-link of the invention in an isometric view, andFigure 2 shows the H-link of the invention in a longitudinal cross-section.Detailed description of the invention[0032] A mooring line typically consists of several elements extending from a seabed anchor to the attachment structure on the hull. These elements are usually 15 joined with one or more so-called H-links, which typically is a unitary H-shaped forged piece with opposite fork-shaped ends and a bolt extending between and through each of the forked ends. A mooring chain, wire or rope extends around each bolt.[0033] Some of these H-link elements are lying on the seabed and some are 20 situated in mid-water. During installation of the mooring system the H-links are handled by the installation vessel and typically deployed over the stern roller or the installation vessel. For this reason, they should have as few protruding parts as possible.[0034] The H-link structure is the load bearing structure that together with the shear 25 load bolt is taking the full mooring load. The mooring line can be a fiber rope, wire or chain. If a fiber rope is attached there is typically a fiber rope thimble around the bolt, ensuring a smooth contact surface and suitable bending radius for the fiber rope.[0035] According to the invention, one bolt of the H-link is a shear load bolt equipped with a tension sensor or strain gauge. Figure 1 shows an H-link 1 according 30 to the invention. It has two bolts 2, 3, of which the bolt 2 is a solid bolt without any tension monitoring function and the bolt 3 is equipped with a strain gauge. 3497936[0036] The tension monitoring bolt 3, in the preferred embodiment, does not have any internal power supply or signal communication unit. Instead the power supply and communication functions are included in a separate power and communication unit (PCU) 4, which can be received by the tension monitoring bolt 3, as will be 5 explained below.[0037] When the mooring line with the H-link 1 is being installed, the PCU 4 is not connected to the bolt 3. The PCU 4 is installed by a diver or an ROV only after the mooring line is in place. To facilitate this installation, and to enable replacement of the PCU 4, it is equipped with an ROV handle 5.10 [0038] The PCU 4 can be received in a recess 6 (see also figure 2) at one end of the bolt 3. Conveniently, an outer end 7 of the PCU 4 and the internal surface of the recess 6 are equipped with a respective part of a bayonet joint. The ROV manipulator can then stab the PCU 5 into the recess 6 and twist the PCU 4 until it locks with the bayonet socket 8 of the recess.15 [0039] As an alternative to a bayonet coupling, the coupling may also be a screw coupling, a press-fit, a magnet coupling or other types of er se known couplings. However, a bayonet coupling has been found to be the most convenient coupling when ease of connection and durability are taken into account.[0040] The shear load bolt 3 is a structural steel bolt with strain gauge(s) (not visible 20 in the figures). In the figures, the bolt 3 is shown fully flush with the outer surface of the H-link, except for the recess. It is also possible for the bolt itself to be recessed relative to the outer surface of the H-link. It is also possible that the bolt protrudes from the surface proper of the H-link, but that a protective structure is integrated with, welded to, bolted to or otherwise firmly attached to the outer surface of the H-link, so 25 that the bolt is fully within the outer surface of this protective structure. The protective structure may, e.g., be a collar formed around the end of the bolt.[0041] Below the bayonet socket 8 the recess 6 has a section 9 into which a power and processing unit (PPU) 10 has been placed. The PPU 10 is coupled to the strain gauge of the bolt. The strain gauge(s) is not visible in the figures but is integrated 30 with the bolt 3 in a per se known way. The strain gauge(s) is powered and monitored by the PPU 10. These two units, gauges and PPU 10, are permanently sealed by fusion or welding, ensuring no penetration of seawater. 3497937[0042] The PCU 4 transfers electric power to the PPU 10 inside the shear load bolt 3 over an inductive interface. The signals containing tension values are transmitted through the same interface to the PCU 4. The PCU communicates with a receiver on the floating structure over an acoustic link to transmit the tension values.5 [0043] According to the invention, the power supply, signal processing, storage and data transfer can be done through different option:[0044] Power can be supplied on a permanent basis from the PCU 4 with no electric source within the shear load bolt 3.[0045] Alternatively, power can be stored inside the shear load bolt 3 PPU 10, such 10 as in an integrated battery.[0046] An external additional power unit can be added at the opposite end of the shear load bolt 3 from the PCU 4. The connection can be similar to the connection of the PCU 4.[0047] Full signal processing can be performed in the shear load bolt 3 PPU 10. 15 Possibly also with data storage in the PPU 10. The processed data can then be transferred to the PCU 4 either on request or continuously.[0048] Raw data can be sent to the external PCU 4 for processing in the PCU 4.[0049] Processed data will be communicated to the floating structure by the CPU 4. This communication is preferably done by acoustic transfer. Acoustic transfer has 20 proven itself as a reliably way of communication in water, albeit having a somewhat narrow bandwidth. It is therefore more convenient to transfer processed data than raw data.[0050] The communication between the PCU 4 on the H-link 1 and the floating unit can be at pre-defined intervals, intelligent transfer of data at pre-defined occurrences 25 or on-demand transfer based on 2-way communication between the floating unit and the PCU 4.[0051] It is also possible to retrieve data without any wireless communication between the PCU 4 and the floating structure. With a data storage in the PCU 4, the PCU 4 can be retrieved by an ROV and replaced with a new unit at regular intervals.30 The retrieved PCU 4 can then be coupled to a reader onboard the floating structure to download the data. 3497938[0052] Alternatively, data can be retrieved by docking an ROV on the H-link 1 and connecting directly to the PCU 4, such as by an inductive coupling, to read data from this.[0053] The two last options are convenient for retrieval of larger amounts of data. 5 [0054] When the H-link is installed, this is without the PCU 4. The mooring line will be deployed over the stern roller of the installation vessel without the PCU 4. Hence there are no protruding parts that can become damaged during the installation of the mooring line.[0055] Only after the mooring line has been completely installed and an initial 10 tensioning of the mooring line has been completed, the PCU 4 is brought down to the H-link and docked into this. The PPU 10 will be initiated by the connection of the PCU 4 and start to send tension data. Then the further tensioning of the mooring line can commence until the prescribed pre-tension has been reached.[0056] The installation can be done by an ROV or a diver. The H-link is placed in the 15 mooring line at a safe distance from the floating installation but at a readily reachable depth.
Claims
3497939Claims1. A tension monitoring device, in particular for monitoring tension in mooring lines, comprising an H-link (1) for coupling into a mooring line, and a power and 5 communication unit (4); said H-link (1) comprising at least one shear load bolt (3), containing at least one strain gauge, characterized in that said shear load bolt (3) comprising an integrated power and processing unit (PPU) (10) and having a receptacle, in the form of a recess (6) in the shear bolt (3), capable of receiving the power and communication unit (PCU) (4) when the H-link (1) is in the sea, and the 10 recess (6) comprising a first part (8) of a bayonet coupling (7, 8), a screw coupling, a press-fit or a magnet coupling, said PCU comprising a second corresponding part (7) of said bayonet coupling (7, 8), screw coupling, press-fit or magnet coupling, locking said PCU (4) in the recess; said PCU (4) being capable of communicating with the PPU (10) through an inductive coupling; said PCU (4) further comprising a battery 15 and that said inductive coupling is capable of transferring electric energy from said battery to said PPU (10); said PPU (10) being capable of processing raw data from the at least one strain gauge before transferring data to the PCU (4) via said inductive coupling, wherein said shear load bolt (3) is placed fully within the outer boundary of the H-link (1) or any protective structure effectively being in one piece 20 with the H-link 81), and wherein said H-link (1) is forming a structural component of a mooring line for mooring a floating structure with said shear load bolt (3) taking up the whole mooring tension of the mooring line.2. The tension device of claim 1, wherein said PCU (4) comprises a handle (5) for handling by a diver or an ROV.25 3. The tension device of claim 1 or 2, wherein said PCU (4) has an acoustic transmitter capable of communicating data with a receiver on a floating structure.34979310Patentkrav1. En strekkovervåkningsinnretning, spesielt for å overvåke strekk i forankringsliner, omfattende et H-ledd (1) for innkobling i en forankringsline, og 5 en kraft- og kommunikasjonsenhet (4); der nevnte H-link (1) omfatter minst én skjærlastbolt (3), som inneholder mint én strekkmåler, og der skjærlastbolten (3) omfatter en integrert kraft- og prosesseringsenhet (PPU) (10) og har et mottakskammer, i form av en fordypning i skjærlastbolten (3), som er i stand til å motta kraft- og kommunikasjonsenheten (PCU) (4) når H-leddet befinner seg i 10 sjøen, og fordypningen omfatter en første del av en bajonettkobling, en skrukobling, en press-pasning eller en magnetkobling, idet PCU’en omfatter en andre korresponderende del av bajonettkoblingen, skrukoblingen, presspasningen eller magnetkoblingen, som låser PCU’en (4) i fordypningen; der PCU’en er i stand til å kommunisere med PPU’en (10) gjennom en induktiv 15 kobling; idet PCU’en videre omfatter et batteri og at den induktive koblingen er i stand til å overføre elektrisk energi fra batteriet til PPU’en (10); der PPU’en (10) er i stand til å prosessere rådata fra den minst ene strekkmåleren før dataene overføres til PCU’en (4) via den induktive koblingen, idet skjærlastbolten (3) er plassert helt innenfor den ytre avgrensningen av H-leddet (1) eller en eventuell 20 beskyttende struktur som effektivt danner ett stykke med H-leddet, og der H-leddet danner en strukturkomponent i en forankringsline for å forankre en flytende struktur, der skjærlastbolten (3) tar opp hele forankringsstrekket i forankringslinen.2. Strekkovervåkningsinnretningen ifølge krav 1, der PCU’en )4) omfatter en 25 hendel for håndtering ved en dykker eller en ROV.3. Strekkovervåkningsinnretningen ifølge krav 1 eller 2, der PCU’en (4) har en akustisk sender som er i stand til å kommunisere data med en mottaker på en flytende struktur.
Drawings

Priority


No priority

Patent classes


IPC classesB63B 21/00G01L 1/22H02J 50/10H02J 7/00CPC classesB63B 21/00B63B 2021/008G01L 1/22H02J 50/10H02J 7/00034

Citations


GB 2501303 A (A)DE 102019000605 B3 (B3)US 3992934 A (A)

Applicants, owners and inventors


Owners
Seasystems AS
Postboks 24 1541 VESTBY NO (VESTBY Municipality, Akershus county)Org. number: 913199863
Inventors
Torkjell Lisland
Belsjøveien 60 1445 DRØBAK NO (FROGN Municipality, Akershus county)

Agent


BRYN AARFLOT AS
BRYN AARFLOT AS

Org. number: 979993269

Name and address are automatically synchronized with the Brønnøysund Register Centre.

Open in The Brønnøysund Register Centre
Stortingsgata 8 0161 OSLO NO (OSLO Municipality, Oslo county)
Org. number: 979993269
Reference: P6447NO00

Status history


Payment history


Oppositions and appeals


No oppositions or appeals

Administrative limitation


No administrative limitation

Liens and licences


No liens or licenses registered

Gazette entries


No Gazette entries foundOnly events from 2024.03.04 and onwards are shown.