Key information

Title
System for Offshore Hydrocarbon Production with both Externally and Internally Variable Electric Power Generation with Energy Distribution Hub
Application number
20220294
Case type
National
Status
22.10.2025 Opphevet etter innsigelse
Filed
09.03.2022
Effective date
09.03.2022
Publicly available
14.08.2023
Applicant
INTERNATIONAL ENERGY CONSORTIUM AS (NO)
Owner
INTERNATIONAL ENERGY CONSORTIUM AS (NO)
Inventor
Gunnar Myhr (NO)
Granted
14.08.2023
Patent number
347251

Abstract and drawing


Disclaimer: This text has been machine-scanned and may contain errors – please refer to "Publications" for legally binding content.
This invention can, but not necessary, be related to systems for (approximate) CO2 free offshore electric power generation, in the context of offshore oil and gas production, with i. e. external (exogenous) variable power supply in the form of wind turbines, solar power, tidal turbines, wave buoys and the like, in combination with variable internal (endogenous) electric power source(s). Electric power can be both imported or exported to and from the power system or installation(s). Fume gases can be injected into aquifer(s) or reservoir(s). AI brain, as part of an advanced control systems, can be implemented and utilized. Both the external and/or the internal electric power sources can represent residual or balancing electric power supplies. In the simplest form the residual internal electrical power supply is provided by at least one gas engine or a gas engine in combination with a turbine, with atmospheric fume release.

Publications


Latest published versionB1A1

Documents


Expand Download files (153)
Date
Date Doc. No. Process Case number In/Out Journal description To/from
17.09.2026 06-01 Klage til Klagenemda (KFIR) 2025/00435 INN E-post fra KFIR
26.06.2026 05-01 Klage til Klagenemda (KFIR) 2025/00435 INN E-post fra KFIR
26.06.2026 04-01 Klage til Klagenemda (KFIR) 2025/00435 INN Avgjørelse 25-00093
02.02.2026 38-01 Saksbehandling 20220294(347251) UT PT Varsel om betaling av årsavgift for år 4 + (3352) (PT20220294) INTERNATIONAL ENERGY CONSORTIUM AS
06.11.2025 03-05 Klage til Klagenemda (KFIR) 2025/00435 UT 24_10_2025 - Klage til KFIR- Vedr Patentstyrets opphevelse - NO347251 - OP2014_00141
06.11.2025 03-04 Klage til Klagenemda (KFIR) 2025/00435 UT 24_10_2025 - Klage til KFIR- Vedr Patentstyrets opphevelse - NO347251 - OP2014_00141
06.11.2025 03-03 Klage til Klagenemda (KFIR) 2025/00435 UT Korrespondanse (Hovedbrev inn)
06.11.2025 03-02 Klage til Klagenemda (KFIR) 2025/00435 UT Nytt overprøvningskrav (OP)
06.11.2025 03-01 Klage til Klagenemda (KFIR) 2025/00435 UT Klage til klagenemda Klagenemnda for industrielle rettigheter
03.11.2025 02-02 Klage til Klagenemda (KFIR) 2025/00435 INN 24_10_2025 - Klage til KFIR- Vedr Patentstyrets opphevelse - NO347251 - OP2014_00141 INTERNATIONAL ENERGY CONSORTIUM AS
03.11.2025 02-01 Klage til Klagenemda (KFIR) 2025/00435 INN Korrespondanse (Hovedbrev inn) INTERNATIONAL ENERGY CONSORTIUM AS
24.10.2025 01-02 Klage til Klagenemda (KFIR) 2025/00435 INN 24_10_2025 - Klage til KFIR- Vedr Patentstyrets opphevelse - NO347251 - OP2014_00141 INTERNATIONAL ENERGY CONSORTIUM AS
24.10.2025 01-01 Klage til Klagenemda (KFIR) 2025/00435 INN Nytt overprøvningskrav (OP) INTERNATIONAL ENERGY CONSORTIUM AS
22.10.2025 31-02 Innsigelse 2024/00141 UT IAIN07P- Avgjørelse - innsigelse_2085240
22.10.2025 31-01 Innsigelse 2024/00141 UT Brev om avgjørelse, med klagefrist ACAPO ONSAGERS AS
22.10.2025 30-02 Innsigelse 2024/00141 UT IAIN07P- Avgjørelse - innsigelse_2085240
22.10.2025 30-01 Innsigelse 2024/00141 UT Brev om avgjørelse, med klagefrist ZACCO NORWAY AS
22.10.2025 29-02 Innsigelse 2024/00141 UT IAIN07P- Avgjørelse - innsigelse_2085240
22.10.2025 29-01 Innsigelse 2024/00141 UT Brev om avgjørelse, med klagefrist INTERNATIONAL ENERGY CONSORTIUM AS
21.10.2025 32-01 Innsigelse 2024/00141 UT IAIN07P- Avgjørelse - innsigelse_2085240
25.08.2025 28-01 Innsigelse 2024/00141 UT Opp til avgjørelse (tilstrekkelig opplyst) INTERNATIONAL ENERGY CONSORTIUM AS
25.08.2025 27-01 Innsigelse 2024/00141 UT Opp til avgjørelse (tilstrekkelig opplyst) ACAPO ONSAGERS AS
01.08.2025 26-01 Innsigelse 2024/00141 INN 202400141 - Avgjørelse KFIR
01.07.2025 10-01 Klage til Klagenemda (KFIR) 2024/00442 INN E-post fra KFIR
01.07.2025 09-01 Klage til Klagenemda (KFIR) 2024/00442 INN Avgjørelse 25-00008
02.02.2025 36-01 Saksbehandling 20220294(347251) UT PT Varsel om betaling av årsavgift for år 4 + (3352) (PT20220294) INTERNATIONAL ENERGY CONSORTIUM AS
20.01.2025 08-08 Klage til Klagenemda (KFIR) 2024/00442 INN NORSK pdf - Translated REPLY TO OPPOSITION BY ZACCO AS VS NO347251 - 23_08_24
20.01.2025 08-07 Klage til Klagenemda (KFIR) 2024/00442 INN NORSK pdf - Translated REPLY TO ONSAGERS OPPOSITION VS NO347251 - 23_08_24 - 24_09
20.01.2025 08-06 Klage til Klagenemda (KFIR) 2024/00442 INN NO347251
20.01.2025 08-05 Klage til Klagenemda (KFIR) 2024/00442 INN KLAGE TIL KFIR PÅ OPPHEVELSE AV PATENT NO347251 - Deres ref OP2024_00141 - 23_12_2024
20.01.2025 08-04 Klage til Klagenemda (KFIR) 2024/00442 INN I-Z
20.01.2025 08-03 Klage til Klagenemda (KFIR) 2024/00442 INN I-O
20.01.2025 08-02 Klage til Klagenemda (KFIR) 2024/00442 INN A-I NO347251
20.01.2025 08-01 Klage til Klagenemda (KFIR) 2024/00442 INN Korrespondanse (Hovedbrev inn)
20.01.2025 07-01 Klage til Klagenemda (KFIR) 2024/00442 INN Korrespondanse (Hovedbrev inn)
20.01.2025 06-13 Klage til Klagenemda (KFIR) 2024/00442 UT NORSK pdf - Translated REPLY TO OPPOSITION BY ZACCO AS VS NO347251 - 23_08_24
20.01.2025 06-12 Klage til Klagenemda (KFIR) 2024/00442 UT NORSK pdf - Translated REPLY TO ONSAGERS OPPOSITION VS NO347251 - 23_08_24 - 24_09
20.01.2025 06-11 Klage til Klagenemda (KFIR) 2024/00442 UT NO347251
20.01.2025 06-10 Klage til Klagenemda (KFIR) 2024/00442 UT KLAGE TIL KFIR PÅ OPPHEVELSE AV PATENT NO347251 - Deres ref OP2024_00141 - 23_12_2024
20.01.2025 06-09 Klage til Klagenemda (KFIR) 2024/00442 UT I-Z
20.01.2025 06-08 Klage til Klagenemda (KFIR) 2024/00442 UT I-O
20.01.2025 06-07 Klage til Klagenemda (KFIR) 2024/00442 UT A-I NO347251
20.01.2025 06-06 Klage til Klagenemda (KFIR) 2024/00442 UT Korrespondanse (Hovedbrev inn)
20.01.2025 06-05 Klage til Klagenemda (KFIR) 2024/00442 UT Korrespondanse (Hovedbrev inn)
20.01.2025 06-04 Klage til Klagenemda (KFIR) 2024/00442 UT Korrespondanse (Hovedbrev inn)
20.01.2025 06-03 Klage til Klagenemda (KFIR) 2024/00442 UT Korrespondanse (Hovedbrev inn)
20.01.2025 06-02 Klage til Klagenemda (KFIR) 2024/00442 UT Nytt overprøvningskrav (OP)
20.01.2025 06-01 Klage til Klagenemda (KFIR) 2024/00442 UT OP05: Oversendelse Klagenemnda for industrielle rettigheter
16.01.2025 05-01 Klage til Klagenemda (KFIR) 2024/00442 INN Korrespondanse (Hovedbrev inn) INTERNATIONAL ENERGY CONSORTIUM AS
12.01.2025 04-01 Klage til Klagenemda (KFIR) 2024/00442 INN Korrespondanse (Hovedbrev inn)
08.01.2025 03-01 Klage til Klagenemda (KFIR) 2024/00442 INN Korrespondanse (Hovedbrev inn) INTERNATIONAL ENERGY CONSORTIUM AS
05.01.2025 02-01 Klage til Klagenemda (KFIR) 2024/00442 INN Korrespondanse (Hovedbrev inn) INTERNATIONAL ENERGY CONSORTIUM AS
23.12.2024 01-08 Klage til Klagenemda (KFIR) 2024/00442 INN NORSK pdf - Translated REPLY TO OPPOSITION BY ZACCO AS VS NO347251 - 23_08_24 INTERNATIONAL ENERGY CONSORTIUM AS
23.12.2024 01-07 Klage til Klagenemda (KFIR) 2024/00442 INN NORSK pdf - Translated REPLY TO ONSAGERS OPPOSITION VS NO347251 - 23_08_24 - 24_09 INTERNATIONAL ENERGY CONSORTIUM AS
23.12.2024 01-06 Klage til Klagenemda (KFIR) 2024/00442 INN NO347251 INTERNATIONAL ENERGY CONSORTIUM AS
23.12.2024 01-05 Klage til Klagenemda (KFIR) 2024/00442 INN KLAGE TIL KFIR PÅ OPPHEVELSE AV PATENT NO347251 - Deres ref OP2024_00141 - 23_12_2024 INTERNATIONAL ENERGY CONSORTIUM AS
23.12.2024 01-04 Klage til Klagenemda (KFIR) 2024/00442 INN I-Z INTERNATIONAL ENERGY CONSORTIUM AS
23.12.2024 01-03 Klage til Klagenemda (KFIR) 2024/00442 INN I-O INTERNATIONAL ENERGY CONSORTIUM AS
23.12.2024 01-02 Klage til Klagenemda (KFIR) 2024/00442 INN A-I NO347251 INTERNATIONAL ENERGY CONSORTIUM AS
23.12.2024 01-01 Klage til Klagenemda (KFIR) 2024/00442 INN Nytt overprøvningskrav (OP) INTERNATIONAL ENERGY CONSORTIUM AS
29.11.2024 37-01 Saksbehandling 20220294(347251) INN Korrespondanse (Hovedbrev inn) INTERNATIONAL ENERGY CONSORTIUM AS
20.11.2024 25-03 Innsigelse 2024/00141 UT OP09: Oversendelse med avgjørelse
20.11.2024 25-02 Innsigelse 2024/00141 UT IAIN07P- Avgjørelse - innsigelse_1920063
20.11.2024 25-01 Innsigelse 2024/00141 UT OP10: Oversendelsesbrev med avgjørelse uten klagefrist ZACCO NORWAY AS
20.11.2024 24-03 Innsigelse 2024/00141 UT OP09: Oversendelse med avgjørelse
20.11.2024 24-02 Innsigelse 2024/00141 UT IAIN07P- Avgjørelse - innsigelse_1920063
20.11.2024 24-01 Innsigelse 2024/00141 UT OP10: Oversendelsesbrev med avgjørelse uten klagefrist ACAPO ONSAGERS AS
20.11.2024 23-02 Innsigelse 2024/00141 UT IAIN07P- Avgjørelse - innsigelse_1920063
20.11.2024 23-01 Innsigelse 2024/00141 UT OP09: Oversendelse med avgjørelse INTERNATIONAL ENERGY CONSORTIUM AS
02.10.2024 22-03 Innsigelse 2024/00141 INN NORSK pdf - Translated REPLY TO OPPOSITION BY ZACCO AS VS NO347251 - 23_08_24 INTERNATIONAL ENERGY CONSORTIUM AS
02.10.2024 22-02 Innsigelse 2024/00141 INN NORSK pdf - Translated REPLY TO ONSAGERS OPPOSITION VS NO347251 - 23_08_24 - 24_09 INTERNATIONAL ENERGY CONSORTIUM AS
02.10.2024 22-01 Innsigelse 2024/00141 INN Korrespondanse (Hovedbrev inn) INTERNATIONAL ENERGY CONSORTIUM AS
24.09.2024 21-03 Innsigelse 2024/00141 UT Opp til avgjørelse
24.09.2024 21-02 Innsigelse 2024/00141 UT Opp til avgjørelse
24.09.2024 21-01 Innsigelse 2024/00141 UT Opp til avgjørelse INTERNATIONAL ENERGY CONSORTIUM AS
24.09.2024 20-02 Innsigelse 2024/00141 UT REPLY TO ONSAGERS OPPOSITION VS NO347251-pdf- 23_08_24
24.09.2024 20-01 Innsigelse 2024/00141 UT Opp til avgjørelse ACAPO ONSAGERS AS
24.09.2024 19-02 Innsigelse 2024/00141 UT REPLY TO OPPOSITIN BY ZACCO VS NO347251-pdf- 23_08_24
24.09.2024 19-01 Innsigelse 2024/00141 UT Opp til avgjørelse ZACCO NORWAY AS
04.09.2024 16-01 Innsigelse 2024/00141 INN Korrespondanse (Hovedbrev inn) INTERNATIONAL ENERGY CONSORTIUM AS
30.08.2024 15-03 Innsigelse 2024/00141 INN REPLY TO OPPOSITIN BY ZACCO VS NO347251-pdf- 23_08_24 INTERNATIONAL ENERGY CONSORTIUM AS
30.08.2024 15-02 Innsigelse 2024/00141 INN REPLY TO ONSAGERS OPPOSITION VS NO347251-pdf- 23_08_24 INTERNATIONAL ENERGY CONSORTIUM AS
30.08.2024 15-01 Innsigelse 2024/00141 INN Korrespondanse (Hovedbrev inn) INTERNATIONAL ENERGY CONSORTIUM AS
28.08.2024 17-03 Innsigelse 2024/00141 INN REPLY TO OPPOSITIN BY ZACCO VS NO347251-pdf- 23_08_24 INTERNATIONAL ENERGY CONSORTIUM AS
28.08.2024 17-02 Innsigelse 2024/00141 INN REPLY TO ONSAGERS OPPOSITION VS NO347251-pdf- 23_08_24 INTERNATIONAL ENERGY CONSORTIUM AS
28.08.2024 17-01 Innsigelse 2024/00141 INN Korrespondanse (Hovedbrev inn) INTERNATIONAL ENERGY CONSORTIUM AS
23.08.2024 18-03 Innsigelse 2024/00141 INN REPLY TO OPPOSITIN BY ZACCO VS NO347251-pdf- 23_08_24 INTERNATIONAL ENERGY CONSORTIUM AS
23.08.2024 18-02 Innsigelse 2024/00141 INN REPLY TO ONSAGERS OPPOSITION VS NO347251-pdf- 23_08_24 INTERNATIONAL ENERGY CONSORTIUM AS
23.08.2024 18-01 Innsigelse 2024/00141 INN Korrespondanse (Hovedbrev inn) INTERNATIONAL ENERGY CONSORTIUM AS
22.05.2024 14-01 Innsigelse 2024/00141 INN Korrespondanse (Hovedbrev inn)
14.05.2024 13-01 Innsigelse 2024/00141 UT Bekreftelse ZACCO NORWAY AS
14.05.2024 12-06 Innsigelse 2024/00141 UT Innsigelse mot norsk patent 347251
14.05.2024 12-05 Innsigelse 2024/00141 UT Bilag 4 - Kravtrekktabell
14.05.2024 12-04 Innsigelse 2024/00141 UT Bilag 3 - Søknad som inngitt
14.05.2024 12-03 Innsigelse 2024/00141 UT Bilag 2 - Norsk patent 347251
14.05.2024 12-02 Innsigelse 2024/00141 UT Bilag 1 - Begrunnelse
14.05.2024 12-01 Innsigelse 2024/00141 UT Oversendelse av innsigelse IN01P INTERNATIONAL ENERGY CONSORTIUM AS
03.05.2024 11-07 Innsigelse 2024/00141 INN Innsigelse mot norsk patent 347251 ZACCO NORWAY AS
03.05.2024 11-06 Innsigelse 2024/00141 INN Bilag 4 - Kravtrekktabell ZACCO NORWAY AS
03.05.2024 11-05 Innsigelse 2024/00141 INN Bilag 3 - Søknad som inngitt ZACCO NORWAY AS
03.05.2024 11-04 Innsigelse 2024/00141 INN Bilag 2 - Norsk patent 347251 ZACCO NORWAY AS
03.05.2024 11-03 Innsigelse 2024/00141 INN Bilag 1 - Begrunnelse ZACCO NORWAY AS
03.05.2024 11-02 Innsigelse 2024/00141 INN Nytt overprøvningskrav (OP) ZACCO NORWAY AS
03.05.2024 11-01 Innsigelse 2024/00141 INN Korrespondanse (Hovedbrev inn)0 ZACCO NORWAY AS
25.04.2024 10-02 Innsigelse 2024/00141 UT Oversendelse
25.04.2024 10-01 Innsigelse 2024/00141 UT Generelt brev INTERNATIONAL ENERGY CONSORTIUM AS
25.04.2024 09-02 Innsigelse 2024/00141 UT Oversendelse
25.04.2024 09-01 Innsigelse 2024/00141 UT Generelt brev Equinor Energy AS
24.04.2024 08-01 Innsigelse 2024/00141 UT Oversendelse ACAPO ONSAGERS AS
24.04.2024 06-01 Innsigelse 2024/00141 UT Bekreftelse ACAPO ONSAGERS AS
24.04.2024 05-03 Innsigelse 2024/00141 UT Innsigelse mot NO347251B1 (OP1239NO00) 1165300
24.04.2024 05-02 Innsigelse 2024/00141 UT D9 - US9639070
24.04.2024 05-01 Innsigelse 2024/00141 UT Oversendelse av innsigelse IN01P INTERNATIONAL ENERGY CONSORTIUM AS
24.04.2024 04-07 Innsigelse 2024/00141 UT D8 - GB2546252
24.04.2024 04-06 Innsigelse 2024/00141 UT D7 - A General Simulation Algorithm for the accurate assessment of Diesel-Wind Turbines Systems Interaction
24.04.2024 04-05 Innsigelse 2024/00141 UT D6 - Case Study Of Integrating An Offshore Wind Farm With Offshore Oil And Gas Platforms And With An Onshore Electrical Grid
24.04.2024 04-04 Innsigelse 2024/00141 UT D5b - Med kabel til land kunne Hywind Tampen kuttet 100 - Energiteknikk
24.04.2024 04-03 Innsigelse 2024/00141 UT D5a - Hywind Tampen, PUD del-II, Konsekvensutredning
24.04.2024 04-02 Innsigelse 2024/00141 UT D4a - Kraft fra land til Troll B og C, Oseberg feltsenter og Oseberg sør
24.04.2024 04-01 Innsigelse 2024/00141 UT Oversendelse av innsigelse IN01P INTERNATIONAL ENERGY CONSORTIUM AS
24.04.2024 03-03 Innsigelse 2024/00141 UT D3a - Plan for utbygging og drift, Troll Prosjekter, Del 2 Konsekvensutredning
24.04.2024 03-02 Innsigelse 2024/00141 UT D2- DK202000220
24.04.2024 03-01 Innsigelse 2024/00141 UT Oversendelse av innsigelse IN01P INTERNATIONAL ENERGY CONSORTIUM AS
24.04.2024 02-04 Innsigelse 2024/00141 UT D1- WO2022003621
24.04.2024 02-03 Innsigelse 2024/00141 UT CGK2 - A Survey of Artificial Neural Network in Wind Energy Systems
24.04.2024 02-02 Innsigelse 2024/00141 UT CGK1 - utdrag PDF
24.04.2024 02-01 Innsigelse 2024/00141 UT Oversendelse av innsigelse IN01P INTERNATIONAL ENERGY CONSORTIUM AS
22.04.2024 01-15 Innsigelse 2024/00141 INN Innsigelse mot NO347251B1 (OP1239NO00) 1165300 ACAPO ONSAGERS AS
22.04.2024 01-14 Innsigelse 2024/00141 INN Equinor Energy AS ACAPO ONSAGERS AS
22.04.2024 01-13 Innsigelse 2024/00141 INN D9 - US9639070 ACAPO ONSAGERS AS
22.04.2024 01-12 Innsigelse 2024/00141 INN D8 - GB2546252 ACAPO ONSAGERS AS
22.04.2024 01-11 Innsigelse 2024/00141 INN D7 - A General Simulation Algorithm for the accurate assessment of Diesel-Wind Turbines Systems Interaction ACAPO ONSAGERS AS
22.04.2024 01-10 Innsigelse 2024/00141 INN D6 - Case Study Of Integrating An Offshore Wind Farm With Offshore Oil And Gas Platforms And With An Onshore Electrical Grid ACAPO ONSAGERS AS
22.04.2024 01-09 Innsigelse 2024/00141 INN D5b - Med kabel til land kunne Hywind Tampen kuttet 100 - Energiteknikk ACAPO ONSAGERS AS
22.04.2024 01-08 Innsigelse 2024/00141 INN D5a - Hywind Tampen, PUD del-II, Konsekvensutredning ACAPO ONSAGERS AS
22.04.2024 01-07 Innsigelse 2024/00141 INN D4a - Kraft fra land til Troll B og C, Oseberg feltsenter og Oseberg sør ACAPO ONSAGERS AS
22.04.2024 01-06 Innsigelse 2024/00141 INN D3a - Plan for utbygging og drift, Troll Prosjekter, Del 2 Konsekvensutredning ACAPO ONSAGERS AS
22.04.2024 01-05 Innsigelse 2024/00141 INN D2- DK202000220 ACAPO ONSAGERS AS
22.04.2024 01-04 Innsigelse 2024/00141 INN D1- WO2022003621 ACAPO ONSAGERS AS
22.04.2024 01-03 Innsigelse 2024/00141 INN CGK2 - A Survey of Artificial Neural Network in Wind Energy Systems ACAPO ONSAGERS AS
22.04.2024 01-02 Innsigelse 2024/00141 INN CGK1 - utdrag PDF ACAPO ONSAGERS AS
22.04.2024 01-01 Innsigelse 2024/00141 INN Nytt overprøvningskrav (OP) ACAPO ONSAGERS AS
09.04.2024 35-01 Saksbehandling 20220294(347251) INN Korrespondanse (Hovedbrev inn) ONSAGERS AS
06.02.2024 34-01 Saksbehandling 20220294(347251) UT PT Varsel om betaling av første årsavgift (3317) (PT20220294) INTERNATIONAL ENERGY CONSORTIUM AS
15.08.2023 33-01 Saksbehandling 20220294(347251) UT PT Registreringsbrev nasjonal patent (15) (PT20220294)
03.08.2023 32-02 Saksbehandling 20220294 INN Intention to grant - NO20220294 INTERNATIONAL ENERGY CONSORTIUM AS
03.08.2023 32-01 Saksbehandling 20220294 INN Korrespondanse (Hovedbrev inn) INTERNATIONAL ENERGY CONSORTIUM AS
02.08.2023 31-01 Saksbehandling 20220294 UT Intention to grant INTERNATIONAL ENERGY CONSORTIUM AS
28.06.2023 30-07 Saksbehandling 20220294 INN Patentkrav på norsk - NO20220294 28 June 2023 INTERNATIONAL ENERGY CONSORTIUM AS
28.06.2023 30-06 Saksbehandling 20220294 INN Figures - NO20220294 28 June 2023 INTERNATIONAL ENERGY CONSORTIUM AS
28.06.2023 30-05 Saksbehandling 20220294 INN Description with annotations NO20220294 - 28 June 2023 INTERNATIONAL ENERGY CONSORTIUM AS
28.06.2023 30-04 Saksbehandling 20220294 INN Clean Description NO20220294 - 28 June 2023 INTERNATIONAL ENERGY CONSORTIUM AS
28.06.2023 30-03 Saksbehandling 20220294 INN Claims NO20220294 June 28 3 2023 INTERNATIONAL ENERGY CONSORTIUM AS
28.06.2023 30-02 Saksbehandling 20220294 INN Abstract and figure NO20220294 28 June 2023 INTERNATIONAL ENERGY CONSORTIUM AS
28.06.2023 30-01 Saksbehandling 20220294 INN Korrespondanse (Hovedbrev inn) INTERNATIONAL ENERGY CONSORTIUM AS
09.05.2023 29-01 Saksbehandling 20220294 INN Korrespondanse (Hovedbrev inn) Gunnar Myhr
09.05.2023 28-01 Saksbehandling 20220294 UT Substantive examination INTERNATIONAL ENERGY CONSORTIUM AS
31.03.2023 27-01 Saksbehandling 20220294 INN Korrespondanse (Hovedbrev inn) Gunnar Myhr
31.03.2023 26-02 Saksbehandling 20220294 UT PT20220294_Priority
31.03.2023 26-01 Saksbehandling 20220294 UT Brev prioritetsdokument INTERNATIONAL ENERGY CONSORTIUM AS
28.03.2023 25-02 Saksbehandling 20220294 INN PDF_544517838 INTERNATIONAL ENERGY CONSORTIUM AS
28.03.2023 25-01 Saksbehandling 20220294 INN Korrespondanse (Hovedbrev inn) INTERNATIONAL ENERGY CONSORTIUM AS
03.03.2023 24-04 Saksbehandling 20220294 INN NO20220294 - March 3_2023 with annotations INTERNATIONAL ENERGY CONSORTIUM AS
03.03.2023 24-03 Saksbehandling 20220294 INN NO20220294 - March 3_2023 Clean Version INTERNATIONAL ENERGY CONSORTIUM AS
03.03.2023 24-02 Saksbehandling 20220294 INN Claims NO20220294 March 3 2023 INTERNATIONAL ENERGY CONSORTIUM AS
03.03.2023 24-01 Saksbehandling 20220294 INN Korrespondanse (Hovedbrev inn) INTERNATIONAL ENERGY CONSORTIUM AS
17.01.2023 23-01 Saksbehandling 20220294 UT Substantive examination INTERNATIONAL ENERGY CONSORTIUM AS
14.12.2022 22-01 Saksbehandling 20220294 INN Korrespondanse (Hovedbrev inn) INTERNATIONAL ENERGY CONSORTIUM AS
14.12.2022 21-07 Saksbehandling 20220294 INN Response to Office Action as of December 6, 2022 - NO20220294 INTERNATIONAL ENERGY CONSORTIUM AS
14.12.2022 21-06 Saksbehandling 20220294 INN Rene og korrigerte krav på norsk - NO20220294 14. desember 2022 INTERNATIONAL ENERGY CONSORTIUM AS
14.12.2022 21-05 Saksbehandling 20220294 INN Korrigerte krav på norsk - NO20220294 14. desember 2022 INTERNATIONAL ENERGY CONSORTIUM AS
14.12.2022 21-04 Saksbehandling 20220294 INN Clean Version NO20220294 - pdf - as of December 14, 2022 INTERNATIONAL ENERGY CONSORTIUM AS
14.12.2022 21-03 Saksbehandling 20220294 INN Clean Ammended Claims as of December 14, 2022 - NO20220294 INTERNATIONAL ENERGY CONSORTIUM AS
14.12.2022 21-02 Saksbehandling 20220294 INN Ammended Claims with annotations as of December 14, 2022 - NO20220294 INTERNATIONAL ENERGY CONSORTIUM AS
14.12.2022 21-01 Saksbehandling 20220294 INN Korrespondanse (Hovedbrev inn) INTERNATIONAL ENERGY CONSORTIUM AS
06.12.2022 20-01 Saksbehandling 20220294 UT Substantive examination INTERNATIONAL ENERGY CONSORTIUM AS
20.11.2022 19-01 Saksbehandling 20220294 INN Korrespondanse (Hovedbrev inn) INTERNATIONAL ENERGY CONSORTIUM AS
03.10.2022 18-01 Saksbehandling 20220294 INN Korrespondanse (Hovedbrev inn) INTERNATIONAL ENERGY CONSORTIUM AS
12.09.2022 17-01 Saksbehandling 20220294 INN Korrespondanse (Hovedbrev inn) INTERNATIONAL ENERGY CONSORTIUM AS
22.08.2022 16-04 Saksbehandling 20220294 INN NO20220294 with Annotations INTERNATIONAL ENERGY CONSORTIUM AS
22.08.2022 16-03 Saksbehandling 20220294 INN NO20220294 - Clean as of August 22 INTERNATIONAL ENERGY CONSORTIUM AS
22.08.2022 16-02 Saksbehandling 20220294 INN Krav på norsk - NO20220294 INTERNATIONAL ENERGY CONSORTIUM AS
22.08.2022 16-01 Saksbehandling 20220294 INN Korrespondanse (Hovedbrev inn) INTERNATIONAL ENERGY CONSORTIUM AS
15.08.2022 15-01 Saksbehandling 20220294 UT Substantive examination INTERNATIONAL ENERGY CONSORTIUM AS
22.06.2022 14-01 Saksbehandling 20220294 INN Korrespondanse (Hovedbrev inn) INTERNATIONAL ENERGY CONSORTIUM AS
09.06.2022 13-02 Saksbehandling 20220294 INN Third Revision of Claims - NO20220294 - IEC AS INTERNATIONAL ENERGY CONSORTIUM AS
09.06.2022 13-01 Saksbehandling 20220294 INN Korrespondanse (Hovedbrev inn) INTERNATIONAL ENERGY CONSORTIUM AS
03.06.2022 12-02 Saksbehandling 20220294 UT PT report 11:13:27
03.06.2022 12-01 Saksbehandling 20220294 UT Substantive examination INTERNATIONAL ENERGY CONSORTIUM AS
26.05.2022 11-02 Saksbehandling 20220294 INN Second revision of Claims - NO20220294 - as of May 26^J 2022 INTERNATIONAL ENERGY CONSORTIUM AS
26.05.2022 11-01 Saksbehandling 20220294 INN Korrespondanse (Hovedbrev inn) INTERNATIONAL ENERGY CONSORTIUM AS
15.05.2022 10-02 Saksbehandling 20220294 INN Revised claims - NO20220294 INTERNATIONAL ENERGY CONSORTIUM AS
15.05.2022 10-01 Saksbehandling 20220294 INN Korrespondanse (Hovedbrev inn) INTERNATIONAL ENERGY CONSORTIUM AS
12.05.2022 07-01 Saksbehandling 20220294 UT Generelt brev Patent INTERNATIONAL ENERGY CONSORTIUM AS
10.05.2022 08-01 Saksbehandling 20220294 INN Korrespondanse (Hovedbrev inn) INTERNATIONAL ENERGY CONSORTIUM AS
06.05.2022 09-01 Saksbehandling 20220294 INN Korrespondanse (Hovedbrev inn) INTERNATIONAL ENERGY CONSORTIUM AS
31.03.2022 06-01 Saksbehandling 20220294 INN Korrespondanse (Hovedbrev inn) INTERNATIONAL ENERGY CONSORTIUM AS
11.03.2022 05-02 Saksbehandling 20220294 INN Overføring av rettigheter - patentsøknad 20220294 INTERNATIONAL ENERGY CONSORTIUM AS
11.03.2022 05-01 Saksbehandling 20220294 INN Korrespondanse (Hovedbrev inn) INTERNATIONAL ENERGY CONSORTIUM AS
10.03.2022 04-01 Saksbehandling 20220294 UT Formalia 1 INTERNATIONAL ENERGY CONSORTIUM AS
10.03.2022 03-01 Saksbehandling 20220294 INN Korrespondanse (Hovedbrev inn) INTERNATIONAL ENERGY CONSORTIUM AS
09.03.2022 02-01 Saksbehandling 20220294 INN Korrespondanse (Hovedbrev inn) INTERNATIONAL ENERGY CONSORTIUM AS
09.03.2022 01-02 Saksbehandling 20220294 INN System for Offshore Hydrocarbon Production with both Externally and Internally Variable Electric Power Generation with Energy Distribution Hub INTERNATIONAL ENERGY CONSORTIUM AS
09.03.2022 01-01 Saksbehandling 20220294 INN Søknadsskjema Patent INTERNATIONAL ENERGY CONSORTIUM AS
- Innsigelse 2024/00141 UT Ugyldig dok INTERNATIONAL ENERGY CONSORTIUM AS

Description, claims and drawings


Disclaimer: This text has been machine-scanned and may contain errors – please refer to "Publications" for legally binding content. Description
This invention can, but not necessary, be related to systems for (approximate) CO2 free offshore electric power generation, in the context of offshore oil and gas production, with i. e. external (exogenous) variable power supply in the form of wind turbines, solar power, tidal turbines, wave buoys and the like, in combination with variable internal (endogenous) electric power source(s). Electric power can be both imported or exported to and from the power system or installation(s). Fume gases can be injected into aquifer(s) or reservoir(s). AI brain, as part of an advanced control systems, can be implemented and utilized. Both the external and/or the internal electric power sources can represent residual or balancing electric power supplies. In the simplest form the residual internal electrical power supply is provided by at least one gas engine or a gas engine in combination with a turbine, with atmospheric fume release.Background and definitionsOffshore hydrocarbon (HC) producing installations (platforms) have traditionally been powered by gas turbines, which subsequently drive generators for local electric power generation and consumptions.Due to the aim of reducing CO2 emissions, HC installations or offshore field(s), constituting several installations, have been installed with onshore (mainland connected) power cables, enabling the offshore installations to be connected to an onshore power grid, providing fully or partial supply of onshore generated electric power. The transmitted power through (sea) cable(s) can be both in the form of adjustable current (AC) or direct current (DC). See e.g. (related to Johan Sverdrup and the Goliat fields):https://www.equinor.com/no/what-we-do/electrification.html, https://www.eni.com/en-IT/operations/norway-goliat.htmlAs alternative electric power sources for offshore installations, offshore wind turbines, solar energy, tidal turbines, wave buoys and the like, have been proposed.One example of such a system is the Hywind Tampen project. Hywind Tampen represents 88 MW (11 x 8 MW) of floating wind turbines, constituting a wind farm, intended to provide electricity for the Snorre and Gullfaks offshore field operations in the Norwegian North Sea. (Offshore) wind turbines are a variable energy source, which on average (“over the year”) has a capacity utilization of approximately 35 %. For shorter periods of time the capacity utilization can be both significantly lower or higher than this number. Since wind, solar, tidal or wave energies are technologies of variable output or production, they provide a limited amount or being a variable within a total dynamic electricity system, like offshore oil and gas operations, which require stable and predictable electric power supply. Variable energy sources may normally provide up to or less than 10 % of the total electricity demand within a grid, without prohibiting or endangering the load viability and the entire (offshore) operations (production of crude oil and gas) enabled by the electric power supply. See e.g. Understanding variable output characteristics of wind power: variability and predictability (wind-energy-the-facts.org)The problem with e.g. the Hywind Tampen project is that wind power will represent a variable supply source between 0 and 50 %, may be higher, depending on how many platform or units of the Tampen area it will supply, or how many installations that will be part of the grid(s) or network. The sole electric power suppliers and current regulator(s) of the individual platforms constituting the Tampa area are, at the present, gas turbines. A variable load (electric demand) and a highly variable partial supply sources in the form of e.g. wind turbines, will require flexible residual supply and providing short-duration load or puls load control.Combined Cycle (CC) power plants, uses combinations of (e.g.) gas turbines (or gas engines), furnace/heat exchangers and steam turbine(s) together, see e.g. https://www.ge.com/gaspower/products/hrsg for details. Gas turbines and CC units have technical constraints related to startup time, ramp rate (increase/decrease of velocity, power etc), and minimum load rate for maintaining hot conditions. Hot start conditions maintain temperature and pressure in the steam components of the CC, allowing rapid ramping of the gas turbine(s) component(s). The exhaust temperature of gas turbines can reach 600 oC (LM2500+, T = 518 oC, https://www.geaviation.com/marine/engines/military/lm2500-plus-engine) In CC units with a furnace, temperatures can be more than 1200 oC. Hard ramp up rate and cycling can cause thermo-mechanical stress of the various components of the power plant beyond tolerance limits and provide human, technical, and economic hazards.E. g. Wärtsilä (https://www.wartsila.com/energy/solutions/engine-power-plants/flexicycleand-chp/flexicycle-power-plants) has gas and fuel engines with lower exhaust temperatures, at 360 oC, also enabling lower steam temperatures, thus provide faster start up and ramping, without compromising units or components within the power plant [constituting e.g. gas turbines, furnace, heat recovery, steam turbine(s) and the like].Other gas & dual fuel engines, see e.g.https://www.siemens-energy.com/global/en/offerings/power-generation/rice.htmlIn this context a system is a group of interacting or interrelated elements or activities that act or interact according to a set of commands to form a unified whole. Such systems, surrounded and influenced by its environment, is defined or described by its boundaries.Refining processes uses chemicals, catalysts, heat or pressure to separate and combine basic types of hydrocarbon molecules which naturally occurs in crude oils into groups of such molecules. Such groups are labeled petroleum components. Examples of such petroleum components are naphtha, kerosene, gas oil or distillates. Petroleum components are further processed to become refined products like gasoline(s), diesel, heating oils etc.“Crude oil”, “petroleum components”, “refined products”, “non-refined petroleum” and “oil” are synonymous terms.The term "gas" represents any combination of the gasses methane, ethane, propane, butane and the terms Natural Gas Liquids (NGL) and condensate. The concept "natural gas" is a mixture of methane and varying amounts of other higher alkanes. Condensate is NGL (Natural Gas Liquids) and hexane, heptane and octane. NGL is LPG (Liquid Petroleum Gas) and ethane and pentane. LPG is a mix of propane and butane. Natural gas can contain CO2, N2 and sulfide in addition to "gas". "Gas" and "natural gas" are synonymous terms.Hydrocarbons (HC) can be any combinations of gas and (crude) oil.The term “installation”, “platform”, “structure”, “units”, “source” are synonymous concepts. The term "offshore" represents any device, structure or installation located on, within or at the bottom (subsea) of water. Equivalently, "onshore" represents any device or structure located not on, within or under water (subsea).The statement “at least one of” means, from a set of variables, activities or processes (synonymous terms) [a1, a2, …an] either a1, a2, …or an isolated (single activity) or any combination(s) among the variables. The term “at least one of” and “any combinations of” are synonymous. The terms "fume gases", "flue gases", "gas mixture" and “CO2” are defined as synonymous terms. The terms "inject" and reinject" are synonymous terms.“Grid” and “network” are synonymous terms.“Puls”, “Demand” and “grid-balancing” are synonymous terms.The term “External variable power source” or exogenous power supply represents at least one of wind turbines, solar power, tidal turbines, wave buoys and the like.The term “Internal variable electric power source” or endogenous power supply represents at least one of gas engine, one gas turbine, one heat exchanger, one furnace, one steam turbine, Combined Cycle power plant and the like.“Source” and “supply” are synonymous terms.“Production” and “generation” are synonymous terms.“Residual” represents a quantity of an element, e.g. Watt or kWh, remaining after other similar elements have been subtracted, allowed for or adjusted.“Residual”, “balancing” and “rest” are synonymous terms.“Power source” and energy source” are synonymous terms.Prior artThe closed known prior art is NO 332044 (Myhr) which describes a system for integrated production of electric power from an offshore gas power plant with local gas production and reservoir injection of fume gases, and where the power is transported to consumers.EP2795055 (Myhr) is related to integrated systems for offshore or land based industrial activities which use for feedstock or produce gas, crude oil and/or refined petroleum products/components, and provide reservoir injection of fume gases, can receive and store CO2 or flue gases from other offshore or onshore industrial processes or hydrocarbon producing installations, and can provide industrial products.Some of the definitions used in this document follow what is stated in EP2795055.WO2022003621A1 describes an offshore assembly to operate a facility, in particular an underwater oil and gas production facility, has: - a semi-submersible support structure arranged in a body of water and having at least one tubular portion; a wind turbine to generate electricity and equipped with a tower, a nacelle and a blade assembly; and at least one backup power source mounted on the semi-submersible support structure to generate electricity; a plurality of compartments stacked on top of each other within the tubular portion, in which each of the compartments is dedicated to housing respective equipment to perform respective functions; and a cooling and ventilation system to cool and ventilate said plurality of compartments.DK202000220A1 describes an offshore jack-up installation that comprises a hull and a plurality of moveable legs engageable with the seafloor, wherein the offshore installation is arranged to move the legs with respect to the hull to position the hull out of the water when the legs engage the seafloor. The offshore jack-up installation also comprises an exhaust processing module arranged to receive exhaust gas comprising carbon dioxide. The exhaust module is arranged to process carbon dioxide in the exhaust gas and to output processed carbon dioxide to at least one other offshore installation for storage in a carbon dioxide storage pocket in the seabed.Brief Summary of the InventionThe invention is a system for electric power generation in conjunction with at least one offshore installation (3) wherein the offshore installation comprises:-at least one hydrocarbon production well on the seabed,-means to control the flow of hydrocarbons from the at least one well,-at least one riser structure for guiding hydrocarbons up to the at least one offshore installation,the system for electric power generation comprises:-at least one internal variable electric power source (6) wherein the at least one internal variable electric power source comprises at least one gas engine (11) driving at least one electrical generator, or at least one gas engine (11) and at least one gas turbine (12) driving at least one electrical generator, wherein Yadj(t) is the power output of the internal variable power source,-at least one external variable electric power source (2) wherein said external variable electric power source is at least one of or a combination of a wind turbine, a solar power unit, a tidal turbine, or a wave buoy, wherein Xadj(t) is the power output of said external variable electric power source, wherein-at least one control system (10) is arranged to monitor an electrical power demand D(t) (1) of said offshore installation and control a flow of electrical power between said one or more external power sources (2) and said offshore installation (3) as well as between said one or more external power sources (2) and an external grid, wherein said control system comprises a first independent controller for said internal variable electric power source (6) and a second independent controller for said one or more external variable electric power source (2).Embodiments are defined in the attached dependent claims.Embodiments of the InventionThe objective technical problem to be solved by the invention, is to manage an exogenous or external variable electric power supply, in the form of at least one wind turbine, solar power unit, tidal turbine, wave buoys and the like, and provide predictable and sustainable total electric power supply, enabling adequate and stable offshore oil and gas operations and subsequent production. This in combination with an internal or endogenous power source, where both the exogenous and/or endogenous power supplies can both represent residual power sources. In the most basic form, the residual (internal) electric power is supplied from at least one gas engine or the at least one gas engine and the at least one gas turbine with atmospheric fume release. A preferred solution is providing (residual) internal electric power in the context of (approximate) CO2 free offshore electric power generation, and subsequent oil and/or gas production.All references, terms, definitions and phrases related to e.g. all major or minor units or subsystems mentioned in the "Background and definition", "Prior art", “Invention” sections and in the figures, also apply to, form the basis of, and are incorporated into the invention represented by this document.Real-time control requires controllers to capture all the significant target activities and to deliver their responses as swiftly as possible so that system performance is never degraded. In Advanced Industrial Control Technology, Peng Zhang, 2010, ISBN: 978-1-4377-7807-6, https://www.sciencedirect.com/book/9781437778076/advanced-industrial-controltechnology#book-info, structure and requirements to real-time control systems are outlined, excerpts (chapter 1.2.1, line 7):“A control operation is a series of events or actions occurring within system hardware and software to give a specific result. A real-time control system is a system in which the correctness of a result depends not only on its logical correctness but also on the time interval in which the result is made available. The following three standards give the definition of a real-time control operation, and an industrial control system in which all thecontrol operations occur in real-time qualifies as a real-time control system:(1) Reliable operation execution - the operation execution must be stable, and it must be repeatable.(2) Determined operation deadline - any control operation needs time to execute.(3) Predictable operation result -the result for any control operation must be predictable.”Artificial intelligence (AI) technologies will advance or support the next generation of control systems.Based on e.g. combinations of, but not limited to, Model Predictive Control, (MPC), Proportional Integral Derivative (PID), Deep Reinforcement Learning (DRL), three characteristics of AI-based controllers can be emphasized;1. Learning: DRL-based controllers learn by methodically and continuously practicing (machine learning).2. Delayed gratification: DRL-based controllers can learn to recognize sub-optimal behavior in the short term, which enables the optimization of gains in the long term.3. Non-traditional input data: DRL-based controllers manage the intake and are able evaluate sensor information that automated systems cannot.The enablement of e.g. DRL-based control systems to a process facility, require, but are not limited to, the following steps in delivering a DRL-based controls:1. Preparation of a companion simulation model for the (AI) brain,2. Design and training of the (AI) brain, 3. Assessment of the trained (AI) brain,4. Deployment.For further reading, see e.g. :https://www.controleng.com/articles/evolution-of-controlsystems-with-artificial-intelligence/In this context the AI brain(s) is/are, but not limited to, to be trained to, at least one of; foresee, forecast, predict, simulate or otherwise, related to;- wind status,- weather status,- supply of electric power from one or more wind turbines, wind park(s), solar power units, tidal turbines, wave buoys and the like,- power demand from the platform(s) or offshore field(s) as part of the grid,- supply and/or delivery status to any connected grid or electric power system connected by sea cable,- technical and maintenance status to the various components constituting the installation and power system.Advanced power-grid monitoring systems combine i.a. load-balancing, power-supply monitoring, metering functions, protection, supervision of power quality and disturbances, transient monitoring, and to enable efficient power delivery. For details, see e.g.: https://www.mouser.com/pdfdocs/Solar-Maxim-Power_Grid_Monitoring.pdf https://www.dnv.com/services/grid-code-compliance-measurements-72067https://www.dnv.com/services/grid-code-compliance-measurements-72067 https://www.vaisala.com/en/lp/leveraging-lidar-offshore-wind-energy? https://unipower.se/products-and-services/power-quality-management-system/pq-secure/Several approaches have been proposed to extract (most of) the CO2 from the flue gas (mixture), named carbon capture (and storage) or CCS. The concept is to dispose only the fraction of the fume containing CO2 rather than the total flue volumes. This for practical and economic reasons. The various approaches can be labelled as post-combustion, oxy-fuel combustion or phase separation. The various techniques which can be utilized are among chemical (amine) solvents, physical solvents, physical absorbents, membrane separation processes, chemisorption, chemical bonding, phase separation.For a more thorough discussion of various CCS approaches, see e.g.http://gcep.stanford.edu/pdfs/assessments/carbon_capture_assessment.pdf Detailed description of the embodiments of the inventionFigure 1 outlines the global architecture of the at least one electric power system. Power Demand (1) is measured from the total grid. The grid constitutes power demand from at least one offshore structure. The at least one wind turbine, tidal turbine, wave buoy, solar power unit and the like (2) provides external variable power supply (3). The at least one external power source can be located on the structure itself, on land, on or within water (offshore) and/or on separate structure(s). External power cable (4), if installed, can transmit electric power (5) both to and from the at least one installation. The at least one external power cable (4) can be mainland connected or represent alternative offshore grid structure(s). The residual internal power source (6) provides the residual internal power (7). The at least one processing unit (8), constituting at least one real time control system (10) and an AI brain (9), if installed. Generators are not shown. Any intermediate fume storage facilities are not shown.The at least one such power unit (6) is either fixed (to the seabed) or locates on solid ground (onshore) or located on one or several fixed or floating (offshore) installations. Floating units can be founded on pontoons (semisubmersible), can be moored or anchored by tension legs. The unit (6) can be partly floating, can be mobile and/or can represent one or more vessels.The installation or platform can be made of combinations of concrete, metals (steel), epoxy, kevlar, fibers, matrixes, synthetic materials, composites, fiber glass and the like.As outlined in Figure 2, the internal power system (6) can constitute combinations of at least one gas engine (11), or the combination of a at least one gas engine (11) and at least one gas turbine (12). If a combined cycle power (CC) system is installed, the fume gas from the at least one gas engine (11), and/or the at least one gas turbine (12) can be fed to at least one heat exchanger and/or a furnace (13) to generate steam, which is powering the at least one steam turbine (14). At least one carbon capture unit (CCS) (15) can be part of the total system. At least one high performance (multiple) step compressor unit can be integrated within the system (16) to provide adequate pressure for the injection into wells on the sea floor where fume gases from at least one turbine unit is/are injected into at least one aquifer (17) and/or HC producing reservoir (17). All components of the system (11 – 17) are interconnected by the at least one processing unit (8), constituting at least one real time control system (10) and an AI brain (9), if installed. At least one systemic control and guidance system (10) will interconnect all subsystems (1 -9), (11 – 17) with the help of sensors (not shown on figures). These sensors will, but are not limited to, the detection (quality and quantity to) pressure, temperature, heat (infrared), frequencies (sound, light), stress, strain, liquid (level), gas (concentrations), one or two phase fluid flows, relative and absolute humidity. Such sensors can be, but are not limited to, analog or digital electronic, electro - mechanical, optical or of ultrasound types. The sensors are connected by wire or wireless communications. Overall coordination of the control system is executed by at least one processing unit (8), which constitute the hub of the at least one control and guidance system (10).Any storage facilities for gas and/or oil are not shown.Units for separation of sand/and or water from gas and/or oil are not shown. The at least one electric generator is/are not shown. Any condensers are not shown.The at least one gas turbine and/or gas engine, or any elements constituting a CC unit, if installed, can be fueled by any combinations of gas and oil, but preferably pure methane. Parts of the electricity, or heat, or steam produced can be used to drift other parts of the installation [e.g. (15), (16)]. The control system (10) can be partially of totally overturned manually, meaning that at least one of the sub - systems or modules (1, 2, 6), (11 – 17) can be manually controlled.The total system (6) can be fully or partly placed on the sea floor (subsea).The system in which at least one gas engine (11) and/or gas turbine (12) unit or in a CC arrangement is/are combinations of gas turbine/engine and/or furnace/heat recovery steam generator (steam turbine) and the like, can be powered by any combinations of gas and oil. It is also possible that smaller amounts of sand and/or water is comprised in the terms "gas" and “oil”. Gas produced on the HC installation or within the field, is the preferred fuel.The system (6) can be represented by components or subsystems (11 – 17) where these mainly comprise, but are not limited to, of combinations of metals, ceramics, composites, matrices, fiber, plastic, epoxy, kevlar, synthetic materials and the like. Use of concrete, wood, glass can be done where this appears as natural or beneficial, however this will not be chosen to a larger extent for load-carrying constructions. The installation or field can be represented by, but not limited to, one or more global units or production units where the electric power production is driven by gas and/or oil to provide power supply to the at least one installation, and it also can produce oil and/or gas from at least one reservoir. This means that oil and gas can be produced from one or more reservoirs which are part of the field, and where (parts of) the gas can both be used for electricity production for export, and/or parts of the gas and the oil can be transported via buoy loading and/or by pipeline(s) away from the field. This is as an example.The invention can comprise several separate power plants coupled together in parallel and/or in series, comprising one or more separate reservoirs for production of gas and/or reinjection of fume gases. This is as an example.Case StudiesSplit range control has been utilized for decades. A disadvantage of this control structure is that using a single controller, has i.a. limitations with respect to tuning.A proposed Multiple Input Multiple Output (MIMO) model has been outlines for a system exemplified by figure 3. Major advantages of this (MIMO) approach, are that separate controllers for each input variable i.a. provide independent tuning and independent setpoints (SP) or target values for each of the variables.In figure 4 Setpoint for the (PID) controller for the at least one external variable electric power source (e.g. wind turbines), applying Xadj (t) (Cx), is X(t) sp.X(t) sp can be defined in various ways.One dynamic example is to define X(t) sp = D(t), where D(t) = Demand, [f(t)], for electric power from the at least one offshore installation.]This dynamic variable can be overturned by defining a static value, Xadj*.Where Xadj* = nominal or target value for the at least one external variable electric power source.Resulting in Xadj (t) = adjusted input variable (output power), power supply from the at least one external variable electric power source.The setpoint for the (PID) controller for the at least one internal variable electric power source (e.g. gas engine, gas turbine, CC unit, and the like), applying Yadj (t) (Cy), is X(t) sp + Δ X sp. Normally D(t) > Xadj(t), thus Δ X sp will have to be defined sufficiently to maintain normal operations of the at least one installation.Where ei = exit or output index.Equivalently, this can be overturned by defining a static value, Yadj*.Where Yadj* = nominal or target value for the at least one internal variable electric power source.Resulting inYadj (t) = adjusted input variable (output power) for the at least one internal variable electric power source.Both Xadj (t) and/or Yadj (t) can be residual electric power supplies.The model can be extended to multiple number of input variables.The MIMO model is fully integrated with the processing unit (8), real time control system (10) and (AI) brain (9) of figures 1 and 2.Examples1. In one example the power output from e.g. a wind turbine park (at least one unit), S(t)*, partially or the total power, can be transmitted on and to a separate grid. This because a specific market is willing to provide a higher price when guaranteed that the power is exclusively based on wind energy (turbines).2. If D(t) > Xadj (t), the power demand for the local grid is greater than what is provided by the variable external power source, e.g. a wind turbine park, the internal (residual) power, Yadj (t), Yadj (t) = D(t) - Xadj (t), if Si (t) = 0. 3. If D(t) > Xadj (t) Yadj (t), then Si (t) < 0, which implies the system has to import electric power from another grid.4. If Yadj* is e. g. stated at max capacity and D(t) < Xadj (t) Yadj (t), then Si (t) > 0, and the excess power can be exported to an external grid.Other featuresa) Xadj (t) can be split between S(t)* and power to the installation(s), XSi (t).b) Feedback sent to the controllers Cx and Cy independently can e.g. be provided by the control system (10) based on input from the AI brain (9). This would enable both Xadj (t) and/or Yadj (t) to be residual electric power supplies, concurrently or simultaneously.The internal variable electric power source, i.e., at least one gas turbine and/or gas engine, is/are controlled to provide enough power to meet the demand of the offshore installation. The required power supply of the at least one gas turbine and/or gas engine Y(t)adj, is/are equal to D(t) - Xadj(t), where D(t) is the demand of the offshore installation(s) and Xadj(t) is the output of the (e.g.) wind turbine(s). That is, the at least one gas turbine and/or gas engine is/are controlled based on (a) how much the wind turbine(s) produce(s) and (b) the demand.The wind turbine(s) is/are always on and generating as much power as possible. In one embodiment, the output of the wind turbine(s) Xadj(t) varies from 0 when the wind is 0 m/s and increases to a maximum value Xadj(t)(max) when the wind is 15m/s and remains at Xadj(t)(max) when the wind is between 15m/s and 25m/s. The values 15m/s and 25m/s are used as an example and these values could change based on the particular wind turbine(s) being used. In any case, the output of the wind turbine is varied according to the wind.The system is controlled so that the system exports as much power as possible from the wind turbine(s), if a high price can be obtained for power generated by the wind turbine(s), and the system constitutes at least one external power cable (4). In that case, if the demand of the installation(s), D(t) is equal or less than the maximum output of the e.g. the at least one gas turbine and/or gas engine Yadj(t)(max), the e.g. at least one gas turbine and/or gas engine is/are controlled to power the installation and the power generated by the wind turbine(s) is/are exported to an external grid, i.e., export power = Xadj(t). If the demand of the installation is greater than the maximum output of the at least one gas turbine and/or gas engine Yadj(t)(max), the at least one gas turbine and/or gas engine is/are controlled to provide the maximum output and any excess power generated by the wind turbine is exported to an external grid, i.e., export power = S(t)* - Si(t) = Xadj(t) Yadj(t)(max) - D(t).Thus, the controller Cy controls the internal variable electric power source based on the above specifications. The controller Cx controls the external variable electric power source for, i.e., manual overturning of the output of the wind turbine by additional pitching of the wind turbine blades, e.g. during very strong wind gusts or when there is an additional need for stabilize the electric supply to the offshore installation.A most preferred solution for electric power generation on at least one offshore installation comprising at least one unit for separation of at least one of sand and water from gas and/or oil, and at least one hydrocarbon production well on the seabed, the control of hydrocarbons from the at least one well, at least one riser structure for guiding hydrocarbons up to the at least one installation, which system consisting of- an internal variable electric power source including a gas engine and at least one generator;- at least one external variable electric power source among wind turbines, solar power units, tidal turbines, wave buoys and the like,- at least one control system for monitoring a demand of the at least one offshore installation, the control system including independent controllers for the internal variable electric power source and the at least one external variable electric power source.
Claims
PATENT CLAIMS1. A system for electric power generation in conjunction with at least one offshore installation (3) whereinthe offshore installation comprises:-at least one hydrocarbon production well on the seabed,-means to control the flow of hydrocarbons from the at least one well,-at least one riser structure for guiding hydrocarbons up to the at least one offshore installation,the system for electric power generation comprises:-at least one internal variable electric power source (6) wherein the at least one internal variable electric power source comprises at least one gas engine (11) driving at least one electrical generator, or at least one gas engine (11) and at least one gas turbine (12) driving at least one electrical generator, wherein Yadj(t) is the power output of the internal variable power source,-at least one external variable electric power source (2) wherein said external variable electric power source is at least one of or a combination of a wind turbine, a solar power unit, a tidal turbine, or a wave buoy, wherein Xadj(t) is the power output of said external variable electric power source,characterized by-at least one control system (10) is arranged to monitor an electrical power demand D(t) (1) of said offshore installation and control a flow of electrical power between said one or more external power sources (2) and said offshore installation (3) as well as between said one or more external power sources (2) and an external grid, wherein said control system comprises a first independent controller for said internal variable electric power source (6) and a second independent controller for said one or more external variable electric power source (2).2. The system for electric power generation according to claim 1, whereinsaid system is arranged to export power to an external grid (4), wherein said system is further arranged to provide electric power generated by said at least one external variable electric power source (2) to said external grid (4).3. The system for electric power generation according to claim 2, wherein-said system is arranged to monitor a unit price of exported electric power and a unit cost of electric power produced by the internal variable electric power source (6),-if said price of exported electric power is greater than said cost of electric power produced by the internal variable electric power source (6), then export all available power from the at least one external variable electric power source (2) to the external grid (4).4. The system for electric power generation according to claim 2, whereinif the electrical power demand (1) of the offshore installation is less than the electrical power producing capacity of the internal variable power source (6):-the system is arranged to export all available power from the at least one external variable electric power source (2) to the external grid (4),-the internal variable power source (6) is arranged to supply the offshore installation with electrical power.5. The system for electric power generation according to claim 2, whereinif the electrical power demand of the offshore installation is greater than the power production capacity of the internal electrical power source:-the internal variable power source is arranged to produce its maximum power,-the external variable power source is arranged to export the remaining of the offshore installation's electrical power demand to the offshore installation,-the external variable power source is further arranged to export its excess electrical power to the external grid, wherein the excess electrical power is given as Xadj(t) Yadj(t) - D(t).6. The system for electric power generation according to any of the preceding claims, wherein the at least one control system (10) comprises at least one AI brain (9).7. The system for electric power generation according to claim 6,wherein said AI brain (9) is trained to forecast power production of based on:-wind status, weather status, supply of electric power from the external variable electric power source, supply to the external grid, and technical and maintenance status to components of the offshore installation and power system.8. The system for electric power generation according to any of the preceding claims, wherein said at least one gas engine (11) and/or at least one gas turbine (12) are powered by any combinations of gas and oil.9. The system for electric power generation according to any of the preceding claims, wherein said at least one internal variable electric power source (6) comprises at least one steam turbine (14) driving at least one electrical generator, said steam turbine (14) powered directly or indirectly by any combinations of gas and oil.10. The system for electric power generation according to any of the preceding claims, wherein said power output Xadj (t) and/or said power output Yadj (t) can be residual electric power supplies, concurrently.KRAV1. Et system for elektrisk kraftgenerering i forbindelse med minst en offshoreinstallasjon (3), deroffshore-installasjonen omfatter:- minst en hydrokarbonproduksjonsbrønn på havbunnen,- midler til å kontrollere strømmen av hydrokarboner fra den minst en brønn,- minst en stigerørstruktur for å lede hydrokarboner opp til den minst en offshoreinstallasjonen,systemet for elektrisk kraftgenerering omfatter:- minst en intern variabel elektrisk strømkilde (6), der den minst en interne variabel elektriske strømkilden omfatter minst en gassmotor (11) som driver minst en elektrisk generator, eller minst en gassmotor (11) og minst en gassturbin (12) som driver minst en elektrisk generator, der Yadj(t) er den elektriske effekten fra den interne variable strømkilden,- minst en ekstern variabel elektrisk strømkilde (2), der den eksterne variabel elektriske strømkilden er en eller en kombinasjon av en vindturbin, en solkraftenhet, en tidevannsturbin eller en bøye, der Xadj(t) er den elektriske effekten fra den eksterne variabel elektriske strømkilden,- kjennetegnet av- minst ett kontrollsystem (10) er arrangert for å overvåke et elektrisk kraftbehov D(t) (1) til den offshore-installasjonen og styre strømmen av elektrisk kraft mellom en eller flere eksterne kraftkilder (2) og den offshore-installasjonen (3), samt mellom en eller flere eksterne kraftkilder (2) og et eksternt strømnett, der kontrollsystemet omfatter en første uavhengig kontroller for den interne variable elektriske strømkilden (6) og en andre uavhengig kontroller for den en eller flere eksterne variable elektriske strømkilder (2).2. Et system for elektrisk kraftgenerering i henhold til krav 1, der systemet er arrangert for å eksportere kraft til et eksternt strømnett (4), der systemet er ytterligere arrangert for å levere elektrisk kraft generert av en eller flere eksterne variable elektriske strømkilder (2) til det eksterne strømnettet (4).3. Et system for elektrisk kraftgenerering i henhold til krav 2, der- systemet er arrangert for å overvåke en enhetspris for eksportert elektrisk kraft og en enhetskostnad for elektrisk kraft produsert av den interne variable elektriske strømkilden (6),- hvis prisen for eksportert elektrisk kraft er større enn kostnaden for elektrisk kraft produsert av den interne variable elektriske strømkilden (6), eksporteres all tilgjengelig kraft fra den en eller flere eksterne variable elektriske strømkildene (2) til det eksterne strømnettet (4).4. Et system for elektrisk kraftgenerering i henhold til krav 2, der hvis det elektriske kraftbehovet (1) til den offshore-installasjonen er mindre enn den elektriske kraftproduksjonskapasiteten til den interne variable strømkilden (6):- systemet er arrangert for å eksportere all tilgjengelig kraft fra en eller flere eksterne variable elektriske strømkilder (2) til det eksterne strømnettet (4),- den interne variable strømkilden (6) er arrangert for å forsyne den offshoreinstallasjonen med elektrisk kraft.5. Et system for elektrisk kraftgenerering i henhold til krav 2, der hvis det elektriske kraftbehovet til den offshore-installasjonen er større enn kraftproduksjonskapasiteten til den interne elektriske strømkilden:- den interne variable strømkilden er arrangert for å produsere sin maksimale kraft, - den eksterne variable strømkilden er arrangert for å eksportere det resterende av den offshore-installasjonens elektriske kraftbehov til den offshore-installasjonen,- den eksterne variable strømkilden er videre arrangert for å eksportere overskuddet av elektrisk kraft til det eksterne strømnettet, der overskuddet av elektrisk kraft gis som Xadj(t) Yadj(t) - D(t).6. Et system for elektrisk kraftgenerering i henhold til noen av de foregående kravene, der det minst en kontrollsystemet (10) omfatter minst en AI-hjerne (9).7. Et system for elektrisk kraftgenerering i henhold til krav 6, der den AI-hjernen (9) er trent til å forutsi kraftproduksjon basert på: -vindstatus, værstatus, tilførsel av elektrisk kraft fra den eksterne variable elektriske strømkilden, tilførsel til det eksterne strømnettet og teknisk og vedlikeholdsstatus for komponenter i den offshoreinstallasjonen og kraftsystemet.8. Et system for elektrisk kraftgenerering i henhold til noen av de foregående kravene, der den minst en gassmotor (11) og/eller den minst ene gassturbinen (12) blir drevet av ulike kombinasjoner av gass og olje.9. et system for elektrisk kraftgenerering i henhold til noen av de foregående kravene, der den minst en interne variable elektriske strømkilden (6) omfatter minst en dampturbin (14) som driver minst en elektrisk generator, der dampturbinen (14) blir drevet direkte eller indirekte av ulike kombinasjoner av gass og olje.10. Et system for elektrisk kraftgenerering i henhold til noen av de foregående kravene, der den elektriske effekten Xadj (t) og/eller den elektriske effekten Yadj (t) kan være residuale elektriske kraftforsyninger, samtidig.
Drawings

Priority


No priority

Patent classes


IPC classesE21B 43/00B63B 35/44CPC classesE21B 43/00B63B 2035/446F05B 2240/93

Citations


WO 2022/003621 A1 (A1)DK 202000220 A1 (A1)

Applicants, owners and inventors


Owners
INTERNATIONAL ENERGY CONSORTIUM AS
c/o Gunnar Myhr, Putten 50 1676 KRÅKERØY NO (FREDRIKSTAD Municipality, Østfold county)Org. number: 912678296
Inventors
Gunnar Myhr
Putten 50 1676 KRÅKERØY NO (FREDRIKSTAD Municipality, Østfold county)

Agent


No agent

Status history


Payment history


Oppositions and appeals


Appeal to Board of AppealsReceived: 24.10.2025 NIPO's case No.: 2025/00435Board of appeal casenumber: 25/00093Current status: Avgjort. Fastholdt Patentstyrets avgjørelse
RequestorINTERNATIONAL ENERGY CONSORTIUM AS c/o Gunnar Myhr, Putten 50 1676 KRÅKERØY NO

Appeal to Board of AppealsReceived: 23.12.2024 NIPO's case No.: 2024/00442Board of appeal casenumber: 25/00008Current status: Avgjort. Opphevet helt/delvis Patentstyrets avgjørelse
RequestorINTERNATIONAL ENERGY CONSORTIUM AS c/o Gunnar Myhr, Putten 50 1676 KRÅKERØY NO

InnsigelseReceived: 22.04.2024 NIPO's case No.: 2024/00141Current status: Avgjort. Høyere instans har opphevet patentet/registreringen
OpponentZACCO NORWAY AS
ZACCO NORWAY AS

Org. number: 982702887

Name and address are automatically synchronized with the Brønnøysund Register Centre.

Open in The Brønnøysund Register Centre
Postboks 488 0213 OSLO NO
Equinor Energy AS Forusbeen 50 4035 STAVANGER NO
Opponent's agentACAPO ONSAGERS AS Edvard Griegs vei 1 5059 BERGEN NO (BERGEN Municipality, Vestland county)
Org. number: 932214636Reference: OP475727NO

Administrative limitation


No administrative limitation

Liens and licences


No liens or licenses registered

Gazette entries


No Gazette entries foundOnly events from 2024.03.04 and onwards are shown.