Key information

Title
Heave compensable crane and method of hoisting a load
Application number
20221292
Case type
National
Status
Filed
01.12.2022
Effective date
01.12.2022
Publicly available
03.06.2024
Applicant
NEKKAR ASA (NO)
Inventor
Yngvar Borø (NO) et al.
Agent
HÅMSØ PATENTBYRÅ AS (NO)

Abstract and drawing


Disclaimer: This text has been machine-scanned and may contain errors – please refer to "Publications" for legally binding content.
A heave compensable crane (200) configured to be mountable on a vessel, the crane (200) comprising: a heave compensation system; a boom (201, 202, 203) comprising a heave compensable portion (201, 202); and a hoisting winch (204) configured to reel in and out a lifting cable (205) to perform a hoisting operation in use; wherein the heave compensation system is configured to provide heave compensation to the heave compensable portion (201, 202) of the boom (201, 202, 203) in use, and the hoisting winch (204) is located on the heave compensable portion (201, 202) of the boom (201, 202, 203).

Publications


A1
Checking availability of the latest published version...

Documents


Expand Download files (19)
Date
Date Doc. No. Process Case number In/Out Journal description To/from
06.05.2026 11-01 Saksbehandling 20221292 UT Endelig henleggelse ENG HÅMSØ PATENTBYRÅ AS
02.05.2026 10-01 Saksbehandling 20221292 UT PT Påminnelse om ikke betalt årsavgift (3329) (PT20221292) HÅMSØ PATENTBYRÅ AS
03.02.2026 09-01 Saksbehandling 20221292 UT Henlagt manglende svar ENG HÅMSØ PATENTBYRÅ AS
23.09.2025 08-01 Saksbehandling 20221292 UT Substantive Examination HÅMSØ PATENTBYRÅ AS
04.11.2024 07-01 Saksbehandling 20221292 UT PT Varsel om betaling av første årsavgift (3317) (PT20221292) HÅMSØ PATENTBYRÅ AS
01.07.2024 06-02 Saksbehandling 20221292 INN P30600NO00_response_010724 HÅMSØ PATENTBYRÅ AS
01.07.2024 06-01 Saksbehandling 20221292 INN Korrespondanse (Hovedbrev inn) HÅMSØ PATENTBYRÅ AS
12.04.2024 05-01 Saksbehandling 20221292 UT 20221292_1838014_PT 08 Eng HÅMSØ PATENTBYRÅ AS
06.12.2023 04-04 Saksbehandling 20221292 INN P30600NO00_response_061223 HÅMSØ PATENTBYRÅ AS
06.12.2023 04-03 Saksbehandling 20221292 INN P30600NO00_amendedspecmarked_061223 HÅMSØ PATENTBYRÅ AS
06.12.2023 04-02 Saksbehandling 20221292 INN P30600NO00_amendedspecclean_061223 HÅMSØ PATENTBYRÅ AS
06.12.2023 04-01 Saksbehandling 20221292 INN Korrespondanse (Hovedbrev inn) HÅMSØ PATENTBYRÅ AS
15.06.2023 03-02 Saksbehandling 20221292 UT PT report 10:26:14
15.06.2023 03-01 Saksbehandling 20221292 UT 20221292_1722105_PT 08 Eng HÅMSØ PATENTBYRÅ AS
02.12.2022 02-01 Saksbehandling 20221292 UT Informasjon til oppfinner Yngvar Borø
01.12.2022 01-04 Saksbehandling 20221292 INN P30600NO00_specification HÅMSØ PATENTBYRÅ AS
01.12.2022 01-03 Saksbehandling 20221292 INN P30600NO00_drawings HÅMSØ PATENTBYRÅ AS
01.12.2022 01-02 Saksbehandling 20221292 INN P30600NO00 Signed General_power_of_attorney HÅMSØ PATENTBYRÅ AS
01.12.2022 01-01 Saksbehandling 20221292 INN Søknadsskjema Patent HÅMSØ PATENTBYRÅ AS

Description, claims and drawings


Disclaimer: This text has been machine-scanned and may contain errors – please refer to "Publications" for legally binding content. Description
HEAVE COMPENSABLE CRANE AND METHOD OF HOISTING A LOADFIELDThe present invention relates to a crane with heave compensation. More particularly, the present invention relates the configuration of a winch on a portion of the boom of the crane.BACKGROUNDCranes are used in myriad lifting operations both onshore and offshore. In offshore operations, the cranes are typically installed on a deck and serve to lift and move heavy objects such as containers or oilfield equipment, for example.Offshore vessels must continue to operate in severe weather and extreme sea states. In such conditions, lifting operations can be dangerous as the load being lifted may sway and crash into the crane, the vessel or other adjacent vessels or equipment, such as an offshore platform or floating rig. The hazards of performing lifting operations in extreme weather are well known and have been problematic for some time.Winches are used to lift the loads, however the winches must constantly adjust the tension in the lifting cable to compensate for the heave of the vessel. Furthermore, the winches must be capable of producing a high torque such that the load can be stably lifted when heave of the vessel is high.Cranes used in offshore operations typically utilise ropes, wires or cables to lift and lower loads and also to control the movement of parts of the crane. Offshore lifting operations can involve the lifting of extremely large loads, which can impart severe stresses on the cranes used. Most problematically, bending loads can be imparted on the cranes which can cause damage leading to failure with catastrophic consequences.The invention has for its object to remedy or to reduce at least one of the drawbacks of the prior art, or at least provide a useful alternative to the prior art.The object is achieved through features, which are specified in the description below and in the claims that follow.SUMMARYAccording to a first aspect of the invention, there is provided a heave compensable crane configured to be mountable on a vessel, the crane comprising: a heave compensation system; a boom comprising a heave compensable portion; and a hoisting winch configured to reel in and out a lifting cable to perform a hoisting operation in use; wherein the heave compensation system is configured to provide heave compensation to the heave compensable portion of the boom in use, and the hoisting winch is located on the heave compensable portion of the boom.The crane may further comprise a substantially vertically upstanding mast. The mast may be configured to be connected to the boom by a luff cable in use, such that the mast can support the boom and the luff cable can luff the boom in use.The boom may comprise a luff cable roller configured such that the luff cable can be run from the mast through the luff cable roller to allow the mast to support the boom and the luff cable to luff the boom in use.The crane may further comprise a luff cable winch configured to reel in and out the luff cable to perform a luffing of the boom in use.The boom may be configured to be moved between a parked configuration and an operational configuration in use, wherein in the parked configuration the boom is more compact than in the operational configuration, and in the operational configuration the boom has a greater reach than in the parked configuration.The boom may comprise a lower boom section and an upper boom section, wherein the lower and upper boom sections are configured to telescope relative to each other.The boom may comprise a lower boom section, an intermediate boom section and an upper boom section, wherein the lower and intermediate boom sections are configured to telescope relative to each other and/or the intermediate and upper boom sections are configured to telescope relative to each other.The heave compensable portion of the boom may comprise a hoisting winch mounting portion configured to dispose the hoisting winch perpendicularly from the boom longitudinal axis in use.The crane may further comprise a side support member extending outwardly from a lower portion of the crane and a fixation point located near the bottom of the crane, such that in use a mast support cable can be run from the mast over the side support member to the fixation point to provide support to the mast during a lifting operation.The heave compensation system may be configured to provide heave compensation to horizontal movements of the heave compensable portion of the boom in use. The heave compensation system may be configured to provide heave compensation to horizontal movements and vertical movements of the heave compensable portion of the boom in use.According to a second aspect of the invention, there is provided a method of hoisting a load on a vessel subject to heave, comprising the steps of: providing a heave compensable crane according to the first aspect of the invention; providing a lifting cable connected to the hoisting winch; arranging the lifting cable to perform a hoisting operation of a load; and activating the heave compensation system to provide heave compensation to the heave compensable portion of the boom such that the winch is operating on a portion of the boom that is heave compensated.According to a third aspect of the invention, there is provided a crane configured to operate in compression, the crane comprising: a boom; a substantially vertically upstanding mast connected to the boom by a luff cable; a side support member extending outwardly from a lower portion of the crane; a fixation point located near the bottom of the crane; a mast support cable running from the mast over the side support member to the fixation point; and a lifting cable provided vertically from the boom for hoisting a load in use; such that during a hoisting operation the crane is subject to compressive forces through the boom, mast and side support member.According to a fourth aspect of the invention, there is provided a method of operating a crane in compression, comprising the steps of: providing a crane according to the third aspect of the invention; and hoisting a load using the lifting cable.BRIEF DESCRIPTION OF THE DRAWINGSEmbodiments of the invention will now be described with reference to the following drawings, in which:Figure 1 shows a crane in a parked position;Figures 2 and 3 show the crane of Figure 1 moving to an operational position; Figure 4 shows the crane of figure 1 in a first operation position;Figure 5 shows a cross-sectional view through the crane of Figure 1;Figure 6 shows the crane of Figure 1 in a second operation position;Figure 7 shows an alternative crane in an operation position;Figure 8 shows the alternative crane of Figure 7 in a parked position;Figure 9 shows the alternative crane of Figure 7, with the winch located on a lower boom section, in an operational position; and Figure 10 shows the alternative crane of Figure 7, with the winch location on a lower boom section, in a parked position.For clarity reasons, some elements may in some of the figures be without reference numerals. A person skilled in the art will understand that the figures are just principal drawings. The relative proportions of individual elements may also be distorted.DETAILED DESCRIPTION OF THE DRAWINGSFigure 1 shows a crane 200 and a cover assembly 100 mounted on to the crane 200 to provide protection to the crane 200 and to form a wing providing propulsion to a vessel (not shown) to which the crane 200 is mounted, as will be explained later.The crane 200 is rotatably attached to the vessel (not shown) by means of a pedestal / foundation block 210 which can rotate/slew in a swivel on the deck of the vessel.The crane 200 comprises a triple boom arrangement comprising a lower boom 201 (not visible in Figure 1, visible in Figure 3 and 4), an intermediate boom 202 and an upper boom 203. The triple boom arrangement together forms a boom. The crane 200 further comprises a hoisting winch 204 located on the intermediate boom 202 for reeling in and out a lifting cable 205 used to perform hoisting operations. It will be understood that the lifting cable 205 may be any suitable wire or rope for example. There are myriad suitable ropes available for lifting operations depending on the operating conditions and the load to be lifted. The lower boom 201 is heave compensated in use. The hoisting winch 204 is located on the intermediate boom 202 as the intermediate boom 202 is also heave compensated in use, therefore the lifting cable 205 is also heave compensated.The crane 200 further comprises a mast 206 (visible in the cross-sectional view shown in Figure 5) which is arranged in a vertically upstanding configuration. A luff cable 207 connects the mast 206 to the end of the upper boom 203 and is reeled in and out by a luff cable winch 208 to allow the triple boom arrangement to be lifted and lowered in use. The luff cable winch 208 is located on the pedestal / foundation block 210 in the presently described example. However, it will be understood that the luff cable winch 208 may be located on the mast 206 or on another part of the crane 200 in another example.The crane 200 can move from a parked position (shown in Figure 1), through intermediate positions (shown in Figures 2 and 3) to a first exemplary operational position (shown in Figure 4) and a second exemplary operational position (shown in Figure 6). It will be understood that the crane 200 has myriad operational positions in a three-dimensional sphere, therefore it is impossible to show examples of all of the possible operational positions. It will be appreciated by a person skilled in the art that a useful crane 200 may be able to hoist loads within a large sphere of operation. It will also be understood that although a 360-degree rotatable crane 200 is provided as the preferred example described herein, alternative examples may comprise a crane 200 restricted in rotational motion.As previously explained, the intermediate boom 202 is heave compensated in use. Heave compensation of the intermediate boom 202 is provided by providing heave compensation to the lower boom 201. By providing a fixed connection between the lower boom 201 and the intermediate boom 202 in use, the intermediate boom 202 is indirectly provided with heave compensation.Throughout the present description the term “heave compensation” is used. This term refers to both passive and active heave compensation which are terms known in the industry. The term “passive heave compensation” generally refers to the technique of reducing the influence of waves upon offshore operations without a control system or the provision of external power. Generally, passive heave compensation is provided by use of components such as springs which use spring isolation to reduce transmissibility to less than 1. Pneumatic or hydraulic “cushions” are also frequently used to passively reduce transmission. Active heave compensation on the other hand comprises a control system that actively compensates for movement at a specific point. The aim of an active heave compensation system is to keep a load motionless, or at least to reduce its motion, with respect to the seabed or another vessel or platform from which the load is being lifted from or lifted to, regardless of the motion of the vessel to which the crane lifting the load is attached. Although the aim is to keep the load motionless, it will be appreciated that some active heave compensation systems are unable to fully compensate for extreme heave, and so in some cases a fully functioning active heave compensation system may be unable to fully compensate for the heave experienced.Typically, active heave compensation systems are powered and may comprise electro-mechanical and/or hydraulic systems. Through the present description, the term “heave compensation” is used to refer to any type of heave compensation, although it will be understood that active heave compensation may be more useful in certain types of offshore lifting operations. Furthermore, throughout the present description, heave compensation is used to refer to two- and three-dimensional heave compensation. It will be understood that there are myriad heave compensation systems available. Therefore, a heave compensation system has been omitted from the drawings as any suitable heave compensation system may be provided, as will be appreciated by a person skilled in the art. The heave compensation system provides compensation of the lower boom 201, and as previously explained, the intermediate 202 and upper booms 203 are also heave compensated by their connection to the lower boom 201.It will be understood that in some examples heave compensation may be provided by the heave compensation system only for horizontal movement such as roll, pitch, surge and sway. In this connection, the hoisting winch 204 may still need to compensate for vertical movement.Referring again to Figure 1, the crane 200 in the parked position is compact and can be protected by the cover assembly 100 in the parked position. When the crane 200 is to be used in a lifting operation, the upper boom 203 can be extended as shown in Figure 2, and all three booms 201, 202, 203 can then be tilted/luffed outwards as shown in Figure 3. As shown in Figure 4, the intermediate boom 202 can then telescope on the lower boom 201, thereby further extending the reach of the triple boom arrangement.When in the operational position, the intermediate boom 202 and lower boom 201 may be stopped from telescoping relative to each other. Furthermore, the upper boom 203 and intermediate boom 202 may be stopped from telescoping relative to each other. In this connection, the intermediate boom 202 may be locked relative to the lower boom 201 and relative to the upper boom 203 by a pin mechanism, for example.Alternatively, the telescoping arrangement may be configured to hold the intermediate boom 202 relative to the lower boom 201 and the upper boom 203 by a brake, for example. Regardless of the specific method used, typically telescoping of the booms 201, 202, 203 is arrested by a locking means until it is desired to extend or contract the reach of the booms 201, 202, 203, in which case the booms 201, 202, 203 may again be telescoped relative to each other.For example, in lifting a subsea manifold, the crane 200 may perform the lift through several kilometres of sea, with the booms 201, 202, 203 in a fixed configuration, i.e. not telescoping. When the subsea manifold has been lifted by the crane 200 out of the water, and it is desired to extend the reach of the crane 200 such that the subsea manifold can be delivered to an adjacent vessel, the crane booms 201, 202, 203 may be telescoped outwards.In the presently described example, the lower boom 201 cannot extend or telescope relative to the pedestal / foundation block 210 or heave compensation system to which it is attached. It will be understood that in alternative examples, the lower boom 201 may also telescope relative to the pedestal / foundation block 210 in use when the booms are tilted / luffed towards the operational positions and extended to provide reach of the crane 200. In the presently described example, only three booms 201, 202, 203 are provided. In alternative examples any number of booms may be provided to allow further reach than the presently presented triple boom arrangement. In this connection, any number of booms may be arranged in a telescoping arrangement, one inside the other, such that the crane can collapse to a compact parked position as described.When in the operational position shown in Figure 4, the crane 200 is ready to perform a hoisting operation by attaching a component to be lifted to the lifting cable 205 and reeling it in using the hoisting winch 204.As the component (not shown) is raised or lowered using the crane 200, the vessel may be subject to severe heave, which is compensated by the heave compensation system (not shown) attached to the lower boom 201. By attachment of hoisting winch 204 to the intermediate boom 202, the hoisting winch 204 is heave compensated. As previously explained, in some examples heave compensation may be provided by the heave compensation system only for horizontal movement such as roll, pitch, surge and sway. In this connection, the hoisting winch 204 may still need to compensate for vertical movement.In prior art examples, the hoisting winch 204 may be typically located on or near the pedestal / foundation block 210, therefore the hoisting winch 204 is typically not mounted on a component already subject to any heave compensation. In the presently described example, the hoisting winch 204 does not need to constantly adjust for heave in all directions with heave of the vessel. As stated, the hoisting winch 204 may still need to compensate for some heave, such as vertical movements, if the heave compensation system only provides compensation for horizontal movements like roll, pitch, surge and sway.Furthermore, a lower torque hoisting winch 204 may be used in the presently described example than in prior art examples where the hoisting winch 204 is connected to the crane body (or the floor of the vessel or pedestal / foundation block 210).Furthermore, a reduced speed winch may be used in the presently described example than in prior art examples where the hoisting winch 204 is connected to the crane body (or the floor of the vessel or pedestal / foundation block 210). It will be appreciated that the hoisting winch 204 may be located on the lower boom 201 or the upper boom 203 in alternative examples.Furthermore, a lower power hoisting winch 204 may be used in the presently described example than in prior art examples where the hoisting winch 204 is connected to the crane body (or the floor of the vessel or pedestal / foundation block 210). In examples where the heave compensation system compensates for horizontal movements, the hoisting winch 204 may still need to provide compensation for vertical movements, however a lower power hoisting winch 204 may be used. In examples where the heave compensation system compensates for horizontal and vertical movements, an even lower power hoisting winch 204 may be used. Most preferably, as shown in the Figures, the hoisting winch 204 is located on the intermediate boom 202, thereby allowing the intermediate boom 202 to telescope over the lower boom 201 such that the intermediate boom 202 completely houses the lower boom 201. Furthermore, by locating the hoisting winch 204 on the intermediate boom 202 as shown, the lifting cable 205 can be run in a straight line between a first end roller 209 located at the end of the upper boom 203 and the hoisting winch 204. Although it is possible to mount the hoisting winch 204 on the lower boom 201 which is heave compensated, the lifting cable 205 may not be provided in a straight line to the first end roller 209. In such configurations, the lifting cable 205 may be required to pass over the intermediate boom 202 which may cause damage to the cable 205 in use.Referring to Figure 4, it can be seen clearly that in the preferred example shown, the intermediate boom 202 is configured with a hoisting winch mounting portion 204’ to which the hoisting winch 204 is attached. The hoisting winch mounting portion 204’ is configured to attach the hoisting winch 204 in a position on the intermediate boom 202 such that the lifting cable 205 can be run through the hoisting winch 204 and in a straight line between the first end roller 209 located at the end of the upper boom 203 and the hoisting winch 204, as can clearly be seen in Figure 5. It will be appreciated that in alternative examples where the hoisting winch 204 is located on the lower boom 201, for example, the lower boom 201 may be provided with a hoisting winch mounting portion 204’ configured to attach the hoisting winch 204 to a position on the lower boom 201 such that a lifting cable 205 can be run through the hoisting winch 204 and in a straight line between the first end roller 209 located at the end of the upper boom 203 and the hoisting winch 204. Regardless of which boom section the hoisting winch mounting portion 204’ is attached to, i.e. the lower boom 201, intermediate boom 202 or upper boom 203, or further boom sections in alternative examples comprising more than three boom sections, the hoisting winch mounting portion 204’ may be configured to dispose the hoisting winch 204 perpendicularly from the boom longitudinal axis. Most preferably, the hoisting winch mounting portion 204’ may be configured to dispose the hoisting winch 204 beyond other booms such that the lifting cable 205 can be run through the hoisting winch 204 in a straight line between the first end roller 209 and the hoisting winch 204 without touching the other boom sections.It will be understood that myriad possible lifting operations may be performed. In some lifting operations, the crane 200 may rotate on the swivel on the deck of the vessel before, during or after a lifting operation.The cover assembly 100 comprises a first protective portion 110 and a second protective portion 120. The protective portions 110, 120 are configured to protect the crane 200 from the weather when the crane is in the parked position.Referring to the cross-sectional view shown in Figure 5, it can be seen that the first protective portion 110 is attached directly to the mast 206. In this connection, the first protection portion 110 comprises fixations (not shown) for attaching the first protective portion 110 along the length of the mast. The second protective portion 120 is attached directly to the mast 206 opposite to the first protective portion 110 as can be seen most clearly in Figures 3 and 4. In the presently described example, the fixations used to attach the first and second protective portions 110, 120 to the mast 206 are nuts received into correspondingly threaded holes within the mast 206. However, it will be understood that there are myriad possible attachment means which may be implemented to attach the first and second protective portions 110, 120 to the mast 206.In the presently described preferred example, the bolts can be removed from the holes in the mast 206 to detach the first and second protective portions 110, 120 from the mast 206 when it is no longer desired to use the cover assembly. This may be, for example, when the vessel to which the crane 200 is mounted is docked. It is therefore highly advantageous if the attachment means used to attach the first and second protective covers 110, 120 to the mast 206 is releasable.The first and second protective covers 110, 120 are arranged to together form a wing. In the present description the term wing is used to refer to an aerofoil. Although there are many terms used in the arts of aerodynamics, aerospace and marine engineering, the term wing is herein used to mean a cross-sectional shape which when subjected to a gas stream is capable of generating lift. In the context of marine vessels, wings are used as sails by positioning the wing in a vertical manner, rather than a horizontal manner as they are presented in aircraft. By positioning in said vertical manner, the lift generated by the wing can be used to provide propulsion to the vessel, thereby acting as a sail.As can be seen in Figures 1 to 4, the cover 100 comprises a first adjustable flap 130 located rearward of the first protective portion 110. The terms forward and rearward are used herein to refer to positions on the cover 100 relative to intended wind direction in use, as will become apparent later. In this connection, the first adjustable flap 130 is located rearward of the first protective portion 110 meaning the first adjustable flap 130 is located downstream of the first protective portion 110 in the wind stream, in normal intended use.Although it cannot be seen in Figures 1 to 4, the cover 100 further comprises a second adjustable flap located rearward of the second protective portion 120 meaning the second adjustable flap is located downstream of the second protective portion 120 in the wind stream, in normal intended use.The first 130 and second adjustable flaps can be adjusted to change the profile of the wing to adjust the lift generated. In this connection, the first 130 and second adjustable flaps can be used to adjust the camber of the wing, which is the asymmetry of the wing.Referring again to Figure 5, a further aspect of the present exemplary arrangement is now described. As previously explained, the crane 200 comprises a hoisting winch 204 located on the intermediate boom 202 for reeling in and out a lifting cable 205 used to perform hoisting operations. The lifting cable 205 is run from the hoisting winch 204 through the first end roller 209 such that the lifting cable 205 is presented substantially vertically to the load to be lifted in use. Presentation of the lifting cable 205 substantially vertically to the load ensures that when the load is lifted the load does not begin to sway, or swing and hit the crane or other equipment.As can be seen in Figure 5, adjacent the first end roller 209 at the end of the upper boom 203 there is provided a luff cable roller 209’. The luff cable roller 209’ is arranged at an upper portion of the end of the upper boom 203 such that the luff cable 207 can be run from the mast 206 through the luff cable roller 209’ and back to the mast 206, as shown in Figure 5. As previously explained, the luff cable 207 then runs down to the luff cable winch 208 such that the luff cable 207 can be reeled in and out by the luff cable winch 208. The luff cable 207 is reeled in and out to lift and lower the triple boom arrangement, as will be easily understood by a person skilled in the art.The crane 200 further comprises a side support member 206’ extending outwardly from the bottom of the mast 206. As can be seen in Figure 5, the side support member 206’ extends out of a side of the bottom of the mast 206 opposite the triple boom arrangement. The crane 200 further comprises a mast support cable 207’ connecting the top of the mast 206 to the side support member 206’ and the bottom of the pedestal / foundation block 210.The described arrangement of the lifting cable 205 and first end roller 209, luff cable 207 and luff cable roller 209’ and mast support cable 207’ and side support member 206’ form a particularly advantageous arrangement. That is, the described arrangement provides compressive forces through the crane 200 rather than bending or torsional forces.Although it is desired to subject the crane 200 to only compressive forces, it will be appreciated that in reality some bending or torsional forces may be present. In this connection, in the present description, reference to only compressive forces is intended to mean mostly compressive forces, whereby the described arrangement substantially reduces the amount of bending and/or torsional forces any component of the crane 200 is subjected to. It is highly desirable to reduce bending and/or torsional forces on crane components 200. In this connection, it is highly desirable to reduce bending and/or torsional forces on the triple boom arrangement. It is also highly desirable to reduce bending and/or torsional forces on the mast 206. The described arrangement may substantially increase the compressive forces the triple boom arrangement is subjected to and/or the compressive forces the mast 206 is subjected to.Compressive forces through the crane 200 structure are easier to manage than bending and/or torsional forces. Therefore, it is desirable to reduce bending and/or torsional forces even if this results in an increase in compressive forces.Since the triple boom arrangement is operating mainly in compression, and the loads are absorbed by the lifting cable 205 and the compression of the triple boom arrangement, the crane 200 may be produced of lightweight materials. One such suitable lightweight material may be aluminium. Alternative lightweight materials may also be suitable. Alternatively, composite materials may be suitable.Figure 6 is provided to illustrate the crane 200 in a second exemplary operational position, wherein the triple boom arrangement is fully telescoped out.The described crane 200 may be suitable to perform lifting operations within a range of around 1-20 ton lifting capacity. It will be understood that alternative cranes may have a greater or less lifting capacity. Furthermore, it is primarily envisaged that the crane 200 may be utilised on a Service Operation Vessel (SOV) or a Commissioning Service Operation Vessel (CSOV), and primarily for the offshore wind industry.However, it will be understood that the crane 200 may be used in myriad different industries.Preferably, the crane 200 may be fully electrical. However, it will be understood that in some examples the crane 200 may be partly electrically powered and partly powered by other means.An alternative crane 2000 is now described with reference to Figures 7 and 8. The alternative crane 2000 is similar to the crane 200 described with reference to Figures 1 to 6, therefore similar reference numerals have been used with the addition of ‘0’ to indicate like part between the example shown in Figures 1 to 6 and the example shown in Figures 7 and 8.Referring firstly to Figure 7, the crane 2000 is rotatably attached to the vessel (not shown) by means of a pedestal / foundation block (not shown) which can rotate/slew in a swivel on the deck of the vessel.The crane 2000 comprises a triple boom arrangement comprising a lower boom 2010, an intermediate boom 2020 and an upper boom 2030. The triple boom arrangement together forms a boom. The crane 2000 further comprises a hoisting winch 2040 located on the intermediate boom 2020 for reeling in and out a lifting cable 2050 used to perform hoisting operations. It will be understood that the lifting cable 2050 may be any suitable wire or rope for example. There are myriad suitable ropes available for lifting operations depending on the operating conditions and the load to be lifted. The intermediate boom 2020 is heave compensated in use. The hoisting winch 2040 is located on the intermediate boom 2020, therefore the lifting cable 2050 is heave compensated.The crane 2000 further comprises a mast 2060 which is arranged in a vertically upstanding configuration. A luff cable 2070 connects the mast 2060 to the end of the upper boom 2030 and is reeled in and out by a luff cable winch 2080 to allow the triple boom arrangement to be lifted and lowered in use. The luff cable winch 2080 is located on the mast 2060 in the presently described example. However, it will be understood that the luff cable winch 2080 may be located on another part of the crane 2000 in another example. The crane 2000 can move from an operational position (shown in Figure 7), through intermediate positions (not shown) to a parked position (shown in Figure 8). It will be understood that the crane 2000 has myriad operational positions in a threedimensional sphere, therefore it is impossible to show examples of all of the possible operational positions.As previously explained, the intermediate boom 2020 is heave compensated in use. Heave compensation of the intermediate boom 2020 is provided by a heave compensation system (not shown).When in the operational position shown in Figure 7, the crane 2000 is ready to perform a hoisting operation by attaching a component to be lifted to the lifting cable 2050 and reeling it in using the hoisting winch 2040.As the component (not shown) is raised or lowered using the crane 2000, the vessel may be subject to severe heave, which is compensated by the heave compensation system (not shown) attached to the intermediate boom 2020. By attachment of the hoisting winch 2040 to the intermediate boom 2020, the hoisting winch 2040 is heave compensated. In prior art examples, the hoisting winch 2040 may be typically located on or near the pedestal / foundation block (not shown), therefore the hoisting winch 2040 is typically not mounted on a component already subject to heave compensation. In the presently described example, the hoisting winch 2040 does not need to constantly adjust with heave of the vessel. Furthermore, a lower torque winch may be used in the presently described example than in prior art examples where the hoisting winch 2040 is connected to the crane body (or the floor of the vessel or pedestal / foundation block). Furthermore, a reduced speed winch may be used in the presently described example than in prior art examples where the hoisting winch 2040 is connected to the crane body (or the floor of the vessel or pedestal / foundation block). It will be appreciated that the hoisting winch 2040 may be located on the lower boom 2010 or the upper boom 2030 in alternative examples.Referring to Figures 7 and 8 it can be seen that the lifting cable 2050 is run from the hoisting winch 2040 through a first end roller 2090 such that the lifting cable 2050 is presented substantially vertically to the load to be lifted in use. Presentation of the lifting cable 2050 substantially vertically to the load ensures that when the load is lifted the load does not begin to sway, or swing and hit the crane or other equipment.Adjacent the first end roller 2090 at the end of the upper boom 2030 there is provided a luff cable roller 209’0. The luff cable roller 209’0 is arranged at an upper portion of the end of the upper boom 2030 such that the luff cable 2070 can be run from the mast 2060 through the luff cable roller 209’0 and back to the mast 2060. As previously explained, the luff cable 2070 then runs down to the luff cable winch 2080 such that the luff cable 2070 can be reeled in and out by the luff cable winch 2080. The luff cable 2070 is reeled in and out to lift and lower the triple boom arrangement, as will be easily understood by a person skilled in the art.Referring now to Figures 9 and 10, the crane 2000 shown in Figures 7 and 8 has been modified such that the hoisting winch 2040 is located on the lower boom 2010. In this example the lower boom 2010 is provided with heave compensation via a heave compensation system (not shown). It may be advantageous to locate the hoisting winch 2040 on the lower boom 2010 as in Figures 9 and 10 as it may allow easier access to the hoisting winch 2040 for servicing and maintenance. Additionally, or alternatively, locating the hoisting winch 2040 on the lower boom 2010 may reduce the bending moment the crane 2000 is subject to, by locating the relatively heavy winch as close as possible to the mast 2060.
Claims
CLAIMS1. A heave compensable crane configured to be mountable on a vessel, the crane comprising:a heave compensation system;a boom comprising a heave compensable portion; anda hoisting winch configured to reel in and out a lifting cable to perform a hoisting operation in use;wherein the heave compensation system is configured to provide heave compensation to the heave compensable portion of the boom in use, and the hoisting winch is located on the heave compensable portion of the boom.2. The heave compensable crane according to claim 1, further comprising a substantially vertically upstanding mast.3. The heave compensable crane according to claim 2, wherein the mast is configured to be connected to the boom by a luff cable in use, such that the mast can support the boom and the luff cable can luff the boom in use.4. The heave compensable crane according to claim 3, wherein the boom comprises a luff cable roller configured such that the luff cable can be run from the mast through the luff cable roller to allow the mast to support the boom and the luff cable to luff the boom in use.5. The heave compensable crane according to claim 3 or 4, wherein the crane further comprises a luff cable winch configured to reel in and out the luff cable to perform a luffing of the boom in use.6. The heave compensable crane according to any preceding claim, wherein the boom is configured to be moved between a parked configuration and an operational configuration in use, wherein in the parked configuration the boom is more compact than in the operational configuration, and in the operational configuration the boom has a greater reach than in the parked configuration.7. The heave compensable crane according to any preceding claim, wherein the boom comprises a lower boom section and an upper boom section, wherein the lower and upper boom sections are configured to telescope relative to each other.8. The heave compensable crane according to any of claims 1 to 6, wherein the boom comprises a lower boom section, an intermediate boom section and an upper boom section, wherein the lower and intermediate boom sections are configured to telescope relative to each other and/or the intermediate and upper boom sections are configured to telescope relative to each other.9. The heave compensable crane according to any preceding claim, wherein the heave compensable portion of the boom comprises a hoisting winch mounting portion configured to dispose the hoisting winch perpendicularly from the boom longitudinal axis in use.10. The heave compensable crane according to any preceding claim, wherein the crane further comprises a side support member extending outwardly from a lower portion of the crane and a fixation point located near the bottom of the crane, such that in use a mast support cable can be run from the mast over the side support member to the fixation point to provide support to the mast during a lifting operation.11. The heave compensable crane according to any preceding claim, wherein the heave compensation system is configured to provide heave compensation to horizontal movements of the heave compensable portion of the boom in use.12. The heave compensable crane according to any of claims 1 to 10, wherein the heave compensation system is configured to provide heave compensation to horizontal movements and vertical movements of the heave compensable portion of the boom in use.13. A method of hoisting a load on a vessel subject to heave, comprising the steps of:providing a heave compensable crane according to any of claims 1 to 12; providing a lifting cable connected to the hoisting winch;arranging the lifting cable to perform a hoisting operation of a load; and activating the heave compensation system to provide heave compensation to the heave compensable portion of the boom such that the winch is operating on a portion of the boom that is heave compensated.14. A crane configured to operate in compression, the crane comprising:a boom;a substantially vertically upstanding mast connected to the boom by a luff cable;a side support member extending outwardly from a lower portion of the crane;a fixation point located near the bottom of the crane;a mast support cable running from the mast over the side support member to the fixation point; anda lifting cable provided vertically from the boom for hoisting a load in use; such that during a hoisting operation the crane is subject to compressive forces through the boom, mast and side support member.15. A method of operating a crane in compression, comprising the steps of:providing a crane according to claims 14;hoisting a load using the lifting cable.
Drawings

Priority


No priority

Patent classes


IPC classesB66C 13/02B66C 13/04B66C 13/06B66C 13/08B66C 13/10B66D 1/52CPC classesB66C 13/02B66C 13/04B66C 13/06B66C 13/08B66C 13/10B66D 1/52

Citations


CN 114803898 A (A)US 2019/337772 A1 (A1)US 2014/284296 A1 (A1)US 4506791 A (A)

Applicants, owners and inventors


Applicants
NEKKAR ASA
Andøyfaret 31 4623 KRISTIANSAND S NO (KRISTIANSAND Municipality, Agder county)Org. number: 932142104
Inventors
Yngvar Borø
Ausvigheia 27 4641 SØGNE NO (KRISTIANSAND Municipality, Agder county)
Arild Andersen
Hugins gate 1 4631 KRISTIANSAND S NO (KRISTIANSAND Municipality, Agder county)

Agent


HÅMSØ PATENTBYRÅ AS
HÅMSØ PATENTBYRÅ AS

Org. number: 918752900

Name and address are automatically synchronized with the Brønnøysund Register Centre.

Open in The Brønnøysund Register Centre
Postboks 9 4068 STAVANGER NO (STAVANGER Municipality, Rogaland county)
Org. number: 918752900
Reference: P30600NO00

Status history


Payment history


Oppositions and appeals


No oppositions or appeals

Administrative limitation


No administrative limitation

Liens and licences


No liens or licenses registered

Gazette entries


No Gazette entries foundOnly events from 2024.03.04 and onwards are shown.