Key information

Title
SYSTEM AND METHOD RELATING TO PADEYES ON WIND TURBINE STRUCTURES
Application number
20240230
Case type
National
Status
Filed
11.03.2024
Effective date
11.03.2024
Publicly available
12.09.2025
Next annual fee due
31.03.2027
Applicant
NEKKAR ASA (NO)
Owner
NEKKAR ASA (NO)
Inventor
Yngvar Borø (NO)
Agent
HÅMSØ PATENTBYRÅ AS (NO)
Granted
06.10.2025
Patent number
349112
Expiry date
11.03.2044

Abstract and drawing


Disclaimer: This text has been machine-scanned and may contain errors – please refer to "Publications" for legally binding content.
A padeye installation system (3100) for lifting a padeye (2100) up the external wall of a wind turbine tower (1000) and securing the padeye (2100) to the turbine tower (1000), the system (3100) comprising: a template (3110) configured to be positioned on an internal wall (1002) of the turbine tower (1000) in use and comprising at least one fastening means guide aperture (3111A) and a guide pipe guide aperture (3110C); a template securing means (3170) configured to at least temporarily hold the template (3110) on the internal wall (1002) of the turbine tower (1000) in use; an aperture forming means (3180) configured to form, in the turbine tower (1000), at least one fastening means aperture (4111A) aligned with the fastening means guide aperture (3111A) and a guide pipe aperture (4110C) aligned with the guide pipe guide aperture (3110C); a guide pipe (3160) configured to be inserted through the guide pipe aperture (4110C) in the turbine tower (1000) in use; a winch (3150) for mounting on the template (3110) in use; a rope (5000) for operatively connecting to the winch (3150) in use such that the rope (5000) can be reeled in by the winch (3150) in use to lift the padeye (2100) up the turbine tower (1000), the rope (5000) being configured to run through the guide pipe (3160) in use; and a fastening means (3121, 3121’, 3131, 3141) configured to be inserted through the fastening means guide aperture (3111A) and fastening means aperture (4111A) to engage the padeye (2100) to selectively secure the template (3110) and the padeye (2100) to the turbine tower (1000) in use.

Publications


B1A1
Checking availability of the latest published version...

Documents


Expand Download files (17)
Date
Date Doc. No. Process Case number In/Out Journal description To/from
02.02.2026 09-01 Saksbehandling 20240230(349112) UT PT Varsel om betaling av første årsavgift (3317) (PT20240230) HÅMSØ PATENTBYRÅ AS
09.10.2025 08-01 Saksbehandling 20240230(349112) UT PT Registreringsbrev nasjonal patent (15) (PT20240230)
01.07.2025 07-01 Saksbehandling 20240230 UT Intention to grant HÅMSØ PATENTBYRÅ AS
03.02.2025 06-05 Saksbehandling 20240230 INN P31233NO00_response_030225 HÅMSØ PATENTBYRÅ AS
03.02.2025 06-04 Saksbehandling 20240230 INN P31233NO00_norwegiantranslationclaims_030225 HÅMSØ PATENTBYRÅ AS
03.02.2025 06-03 Saksbehandling 20240230 INN P31233NO00_amendedspecmarked_030225 HÅMSØ PATENTBYRÅ AS
03.02.2025 06-02 Saksbehandling 20240230 INN P31233NO00_amendedspecclean_030225 HÅMSØ PATENTBYRÅ AS
03.02.2025 06-01 Saksbehandling 20240230 INN Korrespondanse (Hovedbrev inn) HÅMSØ PATENTBYRÅ AS
09.10.2024 05-02 Saksbehandling 20240230 UT PT report 05:22:16
09.10.2024 05-01 Saksbehandling 20240230 UT Substantive Examination HÅMSØ PATENTBYRÅ AS
20.03.2024 04-01 Saksbehandling 20240230 INN Korrespondanse (Hovedbrev inn) HÅMSØ PATENTBYRÅ AS
12.03.2024 03-01 Saksbehandling 20240230 UT Formal Examination 1 HÅMSØ PATENTBYRÅ AS
12.03.2024 02-01 Saksbehandling 20240230 UT Infobrev til oppfinner HÅMSØ PATENTBYRÅ AS
11.03.2024 01-04 Saksbehandling 20240230 INN P31233NO00_specification_110324 HÅMSØ PATENTBYRÅ AS
11.03.2024 01-03 Saksbehandling 20240230 INN P31233NO00_drawings_110324 HÅMSØ PATENTBYRÅ AS
11.03.2024 01-02 Saksbehandling 20240230 INN P31233NO00 Signert generalfullmakt HÅMSØ PATENTBYRÅ AS
11.03.2024 01-01 Saksbehandling 20240230 INN Søknadsskjema Patent HÅMSØ PATENTBYRÅ AS

Description, claims and drawings


Disclaimer: This text has been machine-scanned and may contain errors – please refer to "Publications" for legally binding content. Description
3491121SYSTEM AND METHOD RELATING TO PADEYES ON WIND TURBINESTRUCTURESFIELD5 The present invention relates to padeyes on wind turbine structures. More specifically, the present invention relates to padeyes for installation on a wind turbine tower and a method of installing padeyes on wind turbine towers from inside of the tower.10 BACKGROUNDAs the world transitions away from fossil fuel-based energy towards greener energy sources, the demand for wind turbines has greatly increased. Wind turbines are extremely large structures comprised of very heavy equipment. As well as the challenges faced in installing wind turbines, the maintenance of them is expensive and 15 difficult. Wind turbines can either be located at sea or on land. At sea, wind turbines can be installed on floating structures or on structures which are fixed to the seabed.Traditionally, wind turbines are installed by use of very large cranes. A lot of work and significant infrastructure is required to get the cranes to location and to install them, before even starting to install the wind turbines themselves. Furthermore, it may require 20 good weather to install parts of the wind turbine, particularly the uppermost parts, when they are lifted by a crane separate from the tower, e.g. because of relative movement of the crane and the tower. In parts of the world where wind energy is growing, such as in northern Europe, it is difficult to plan for good weather.Fixed offshore wind turbines are typically formed of a driven monopile or other 25 structure fixed into the seabed, a transition piece and a turbine tower. At the top of the turbine tower there is located a narcelle comprising a gear box, generator and other associated equipment and turbine blades. Typically there are three turbine blades.Components of wind turbines sometimes need to be removed from the wind turbine and maintained or entirely replaced. Such components can include, but are not 30 limited to, turbine blades, gear boxes, narcelles, rotors, generators etc.Typically in offshore wind turbines, the top of the transition piece is provided with a working deck where personnel can stand and equipment can be prepared on and/or lifted and lowered onto. 3491122During the constructure of turbine towers, the turbine towers are often fabricated with fixed padeyes. The fixed padeyes are often located near the top of a turbine tower section and may be used in, for example, lifting or assisting in lifting subsequent sections of the turbine tower into position during assembly.5 After the turbine tower, with or without fixed and pre-fabricated padeyes, has been assembled, it may be desirable to retro-fit padeyes to assist in lifting further equipment. For example, padeyes may be retro-fitted to a wind turbine tower to assist in lifting equipment utilised during a main component replacement operation.The term retro-fitted/retro-fitting is used herein to refer to the installation of 10 padeyes on a tower after original construction of the turbine tower in a factory. In this connection, retrofitted padeyes may cover the installation of padeyes on the turbine tower before or after the turbine tower has entered into operation.Retrofitting of padeyes is complicated due to the fact that it must be ensured that the strength and integrity of the turbine tower is maintained. In this connection, there are 15 strict regulations limiting the amount and size of penetration of the turbine tower that is permitted, to ensure the strength and integrity of the turbine tower. Furthermore, operations which damage the paint or external coatings on the turbine tower are generally severely restricted and/or prohibited.It is also generally not allowed or highly undesirable to install padeyes from 20 outside of the turbine tower. It is extremely complicated to attempt to install padeyes from inside of the turbine tower.Patent document CN106865422B discloses foldable truss arm lifting equipment for mounting and maintaining a wind driven generator set. The equipment comprises a tower, a foldable truss arm lifting platform, multiple holding brake blocks and multiple 25 support connecting rods; the holding brake blocks are mounted at the top end of the tower; the foldable truss arm lifting platform is connected with the holding brake blocks through the support connecting rods; at least two foldable truss arm cranes are fixed on the foldable truss arm lifting platform; and the foldable truss arm cranes include lifting arms adjustable in extending direction and length. The tower is mounted in the mounting 30 process of a wind power tower section by section; and after the tower is mounted, the installation and the later maintenance and replacement of blades or cabin equipment are performed.Patent document CN215998818U discloses an H-shaped steel butt joint node drilling template and relates to a tool in steel structure production. The solution 3491123comprises a drilling template body, the drilling template body is placed on the web plate of H-shaped steel, the two sides of the drilling template body are provided with horizontally-moving fixing plates, and the H-shaped steel butt joint node drilling template is arranged on the H-shaped steel web plate. A control assembly for controlling the fixing 5 plates to slide in the direction close to or away from the flanges is arranged on the drilling formwork, the control assembly can control the two fixing plates to move by the same distance in the opposite directions at the same time, a limiting piece is further arranged on the drilling formwork, and when the limiting piece abuts against the web, half of the drilling formwork is located on the web. The drilling template can be10 conveniently located at the center position of the web plate.Patent document US5971683A discloses a multipurpose anchor assembly including a block assembly for mounting to the upper sidewall of a cargo carrying vehicle to accommodate tie down of handled cargo. A pin is received through an aperture in the block and engages a spring mounted plate assembly which allows for engagement of 15 the pin for locking in selective positions. The pin includes an eye formation at a top thereof to facilitate attachment of a tie down lashing member.The invention has for its object to remedy or to reduce at least one of the drawbacks of the prior art, or at least provide a useful alternative to the prior art.The object is achieved through features, which are specified in the description 20 below and in the claims that follow.SUMMARYAccording to a first aspect of the invention, there is provided a padeye installation system for lifting a padeye up the external wall of a wind turbine tower and securing the 25 padeye to the turbine tower, the system comprising: a template configured to be positioned on an internal wall of the turbine tower in use and comprising at least one fastening means guide aperture and a guide pipe guide aperture; a template securing means configured to at least temporarily hold the template on the internal wall of the turbine tower in use; an aperture forming means configured to form, in the turbine tower, 30 at least one fastening means aperture aligned with the fastening means guide aperture and a guide pipe aperture aligned with the guide pipe guide aperture; a guide pipe configured to be inserted through the guide pipe aperture in the turbine tower in use; a winch for mounting on the template in use; a rope for operatively connecting to the winch in use such that the rope can be reeled in by the winch in use to lift the padeye up the 3491124turbine tower, the rope being configured to run through the guide pipe in use; and a fastening means configured to be inserted through the fastening means guide aperture and fastening means aperture to engage the padeye to selectively secure the template and the padeye to the turbine tower in use.5 The system may allow padeyes to be installed from inside of the turbine tower, with only the padeye needing to be picked up from outside of the turbine tower. The system may allow padeyes to be installed with minimal structural weakening of the turbine tower. The system may allow padeyes to be installed with no or minimal damage to external paint or coatings on the turbine tower.10 The at least one fastening means guide aperture may comprise a plurality of fastening means guide apertures.The aperture forming means may be configured to form, in the turbine tower, a plurality of fastening means apertures each aligned with one of the plurality of fastening means guide apertures.15 The fastening means may comprises a plurality of fastening means wherein the plurality of fastening means are each configured to be inserted through a fastening means guide aperture and a corresponding fastening means aperture to engage the padeye to selectively secure the template and the padeye to the turbine tower in use.The template securing means may be a template securing magnet.20 The template securing magnet may be a selectively engageable mechanical magnet or an electromagnet.The aperture forming means may be a drill or a punch or a perforator or a grinder or a cutter.The rope may comprise a proximal end and a distal end. The proximal end may 25 be configured to be reeled in and out by the winch. The distal end may be configured to temporarily receive a lifting ball for lifting the padeye and/or a socket.The fastening means or each fastening means may comprise a bolt.The fastening means or each fastening means may comprise an expansion bolt assembly.30 The fastening means or each fastening means may comprise a friction bolt.The or each expansion bolt assembly may comprise: a bolt; a bolt bushing; a washer; and a plurality of bolt torquing members.The aperture forming means may comprise an attachment means such that the aperture forming means can be releasably attached to the template in use. 3491125The attachment means may be a magnet or a mechanical magnet or an electromagnet.The template may further comprise at least one socket locking guide aperture. The aperture forming means may be configured to form, in the turbine tower, at 5 least one socket locking aperture aligned with the socket locking guide aperture.The system may further comprise: a socket locking means configured to be inserted through the at least one socket locking guide aperture and at least one socket locking aperture to engage a socket locking device within the padeye to selectively move the socket locking device from an unlock position to a locked position to lock a socket 10 within the padeye in use.The at least one socket locking guide aperture may comprise a plurality of socket locking guide apertures.The aperture forming means may be configured to form, in the turbine tower, a plurality of socket locking apertures each aligned with the socket locking guide15 apertures.The socket locking means may comprise a plurality of socket locking means; wherein the plurality of socketing locking means are each configured to be inserted through a socket locking guide aperture and a corresponding socket locking aperture to engage a socket locking device within the padeye to selectively move the socket locking 20 device from an unlocked position to a locked position to lock a socket within the padeye in use.According to a second aspect of the invention, there is provided a method of lifting a padeye up the external wall of the wind turbine tower and securing the padeye to the turbine tower, comprising the steps of: providing a padeye installation system according 25 to the first aspect of the invention; providing a wind turbine tower; providing a padeye comprising at least one fastening means engagement aperture; positioning the template on an internal wall of the turbine tower; attaching the template securing means to the template to temporarily hold the template on the internal wall of the turbine tower; forming, in the turbine tower: at least one fastening means aperture aligned with the 30 fastening means guide aperture; and a guide pipe aperture aligned with the guide pipe guide aperture; inserting the guide pipe through the guide pipe aperture; mounting the winch on the template; running the rope through the guide pipe; connecting the rope to the winch such that the rope can be reeled in and out by the winch; attaching the padeye to the rope; operating the winch to reel in the rope and thereby lift the padeye up the 3491126external wall of the turbine tower; aligning the at least one fastening means engagement aperture of the padeye with the at least one fastening means aperture in the turbine tower; inserting the at least one fastening means through the fastening means guide aperture and fastening means aperture to engage the at least one fastening means 5 engagement aperture of the padeye thereby securing the template and the padeye to the turbine tower.The method may allow padeyes to be installed from inside of the turbine tower, with only the padeye needing to be picked up from outside of the turbine tower. The method may allow padeyes to be installed with minimal structural weakening of the 10 turbine tower. The method may allow padeyes to be installed with no or minimal damage to external paint or coatings on the turbine tower.The step of attaching the padeye to the rope may further comprise the steps of: running the rope through the padeye; attaching a lifting ball to the end of the rope; and reeling in the rope such that the lifting ball engages the padeye.15 The padeye may further comprise a socket locking device arranged to be moveable between a locked position and an unlocked position.The step of forming, in the turbine tower at least one fastening means aperture and a guide pipe aperture may further comprise forming, in the turbine tower, at least one socket locking aperture aligned with the at least one socket locking guide aperture of the 20 template.The method may further comprise a step of inserting the socket locking means through the at least one socket locking guide aperture and socket locking aperture to engage the socket locking device within the padeye to move the socket locking device from an unlocked position to a locked position to lock a socket within the padeye.25BRIEF DESCRIPTION OF THE DRAWINGSAn embodiment of the invention will now be described with reference to the following drawings, in which:Figure 1 shows an upper portion of a wind turbine tower comprising a padeye 30 and padeye installation system;Figure 2 shows an exploded view of the padeye and padeye installation system of Figure 1;Figures 3 and 4 show a template of the padeye installation system of Figure 1; Figure 5 shows a drill used to drill apertures in the turbine tower of Figure 1; 3491127Figure 6 shows a winch installed on the template in the padeye installation system shown in Figure 1;Figure 7 shows bushings of the padeye installation system of Figure 1;Figure 8 shows washers of the padeye installation system of Figure 1;5 Figure 9 shows a working deck of the turbine tower of Figure 1;Figure 10 shows an exploded view of the padeye of Figure 1;Figure 11 shows the padeye of Figure 1;Figure 12 shows the padeye of Figure 1 in an exploded view before engaging the turbine tower of Figure 1;10 Figure 13 shows the padeye of Figure 1 before engaging the turbine tower of Figure 1;Figure 14 shows the padeye of Figure 1 engaging the turbine tower of Figure 1; Figure 15 shows the padeye of Figure 1 being lifted up the outside of the turbine tower of Figure 1 by the rope;15 Figure 16 shows the padeye of Figure 1 at the location where the padeye will be secured to the turbine tower;Figures 17 to 19 show exploded views of the bushings, washers, bolts and torquing members of the padeye installation system of Figure 1;Figure 20 shows the bolts fully installed in the padeye installation system of 20 Figure 1;Figure 21 shows the rope and lifting ball being lowered from the padeye of Figure 1;Figure 22 shows the rope lifting a socket and lifting cable into the padeye of Figure 1;25 Figure 23 shows the socket ready for locking in the padeye of Figure 1;Figure 24 shows the socket locking device in the locked position in the padeye of Figure 1;Figures 25 and 26 show the padeye and padeye installation system of Figure 1; Figure 27 shows the padeye and padeye installation system of Figure 1 with the 30 socket locking device in the locked position;Figure 28 shows an apparatus for main component replacement wrapped around the wind turbine tower shown in Figure 1 with lifting cables attached to the padeyes; and Figure 29 shows the apparatus in Figure 28 performing main component replacement. 3491128For clarity reasons, some elements may in some of the figures be without reference numerals. A person skilled in the art will understand that the figures are just principal drawings. The relative proportions of individual elements may also be distorted.5 DETAILED DESCRIPTION OF THE DRAWINGSFigure 1 shows a part of a wind turbine in the form of a turbine tower 1000 comprising an upper portion 1100 where a plurality of padeyes 2000 have been retrofitted to the turbine tower 1000.It will be understood that in use the upper portion 1100 of the tower 1000 10 supports the power generation and conversion components of the wind turbine however for the present purposes of explaining the padeyes 2000 and their installation, the tower 1000 is shown without the power generation and conversion components installed atop the upper portion 1100 of the tower 1000.The plurality of padeyes 2000 provide fixation points such that ropes/cables used 15 to lift and lower equipment can be run thereto in use. In the presently described example, there is provided first 2100, second 2200, third 2300 (not visible in Figure 1, visible in Figures 25 to 27) and fourth 2400 (not visible in Figure 1, visible in Figure 25 to 27) padeyes. As will be explained in more detail later, each padeye 2100, 2200, 2300, 2400 comprises a means to securely hold a load bearing rope (not visible in Figure 1) or 20 other cable used in lifting or lowering components up and down the wind turbine tower 1000.As will be easily understood by a person skilled in the art, the turbine tower 1000 comprises an outer surface 1001 and an inner surface 1002. Generally, the inner surface 1002 of a wind turbine tower 1000 is more easily accessible than the outer 25 surface 1002. As can be seen in Figure 1, the inner surface 1002 can be accessed, in the presented described example, via a ladder 1003 running up through the inside of the turbine tower 1000. Furthermore, an internal working deck 1004 is provided as shown in Figure 1, thereby allowing equipment to be moved internally up through the wind turbine tower 1000 via the ladder 1003 and positioned on the internal working deck 1004. It will 30 be understood that personnel may also climb internally up through the turbine tower 1000 and stand on the working deck 1004 to perform installation or maintenance operations. It will therefore be clear that the inner surface 1002 of the turbine tower 1000 is easier accessible than the outer surface 1001.At least in some countries, regulations may prohibit operations performed from 3491129the outer surface 1001 of the turbine tower 1000.As can be seen in Figure 1, the padeyes 2000 are installed on the wind turbine tower 1000 by means of corresponding padeye installation systems 3000. In the present context, padeye installation systems 3000 are provided for lifting a padeye up the 5 external wall of a wind turbine tower and securing the padeye to the wind turbine tower.It will be understood that in the view shown in Figure 1, not all padeyes 2000 and installation systems 3000 are visible. In this connection, the first padeye 2100 has a corresponding first padeye installation system 3100 (not visible in Figure 1, visible in Figures 25 to 27), the second padeye 2200 has a corresponding second padeye 10 installation system 3200 (not visible in Figure 1, visible in Figures 25 to 27), the third padeye 2300 (not visible in Figure 1, visible in Figures 25 to 27) has a third padeye installation system 3300 and the fourth padeye 2400 (not visible in Figure 1, visible in Figures 25 to 27) has a fourth padeye installation system 3400.Further details of the first padeye 2100 and first padeye installation system 3100 15 are now explained, however it will be understood that the remaining padeyes 2200, 2300, 2400 and padeye installation systems 3200, 3300, 3400 are as explained with respect to the first padeye 2100 and first padeye installation system 3100.The components of the presently described first padeye installation system 3100 are explained before the method of installing the first padeye 2100 is explained.20 In this connection, referring to Figure 2, the first padeye installation system 3100 comprises a template 3110. The first padeye installation system 3100 further comprises a plurality fastening means in the form of: a plurality of main bolts 3120 comprising first 3121, second 3122, third 3123, fourth 3124, fifth 3125 and sixth 3126 main bolts; a corresponding plurality of main bolt torquing members 3120’ comprising first 3121’, 25 second 3122’, third 3123’, fourth 3124’, fifth 3125’ and sixth 3126’ main bolt torquing members; a plurality of main bolt bushings 3130 comprising first 3131, second 3132, third 3133, fourth 3134, fifth 3135 and sixth 3136 main bolt bushings and a plurality of washers 3140 comprising first 3141, second 3142, third 3143, fourth 3144, fifth 3145 and sixth 3146 washers. The first padeye installation system 3100 further comprises a 30 winch 3150; a rope guide pipe 3160 and a socket locking means in the form of a plurality of socket locking device engaging bolts 3120’’ comprising first 3121’’ and second 3122’’ socket locking device engaging bolts.As can also be seen in Figure 2, the first padeye 2100 comprises a plurality of magnet apertures 2110 comprising first 2111, second 2112, third 2113 and fourth 2114 34911210magnet apertures. The magnet apertures 2110 may be formed during construction of the padeye 2100 or alternative the magnet apertures 2110 may be drilled into the padeye 2100 later. The first padeye 2100 further comprises: a plurality of springs 2120 comprising first 2121, second 2122, third 2123 and fourth 2124 springs; a plurality of 5 magnets 2130 comprising first 2131, second 2132, third 2133 and fourth 2134 magnets and a plurality of non-destructive tower engagement elements 2140 comprising first 2141, second 2142, third 2143 and fourth 2144 non-destructive tower engagement elements. As will be explained in more detail later, the non-destructive tower engagement elements 2140 come into contact with the tower 1000 during installation of 10 the padeyes 2000. In the presently described example the non-destructive tower engagement elements 2140 are felt pads. In alternative examples (not shown) the nondestructive tower engagement elements 2140 may be formed of other materials, such as but not limited to elastic materials.A method of installing the padeyes 2000 is now explained with reference to 15 Figures 3 to 27 which show the first padeye 2100 being installed. The method is repeated for the second 2200, third 2300 and fourth 2400 padeyes but is not repeated in the present description in the interest of brevity.Firstly, as shown in Figure 3, the template 3110 is located on the inner surface 1002 of the turbine tower 1000 at the location where it is desired to mount the first 20 padeye 2100. The template 3110 is brought through the inside of the turbine tower 1000 for installation, as previously explained. The template 3110 is predrilled with: a plurality of fastening means guide apertures in the form of a plurality of main bolt guide apertures 3110A comprising first 3111A (not visible in Figure 3, visible in Figure 4), second 3112A (not visible in Figure 3, visible in Figure 4), third 3113A, fourth 3114A, fifth 3115A and 25 sixth 3116A main bolt guide apertures; a plurality of socket locking guide apertures 3110B comprising first 3111B and second 3112B socket locking guide apertures; and a guide pipe guide aperture 3110C. The template 3110 is provided such that apertures can be subsequently drilled in precise locations through the wall of the turbine tower 1000 from the inside of the turbine tower 1000, as will be explained.30 When the template 3110 is located where it is desired to attach the padeye 2100, a template securing means in the form of a magnet 3170 is brought into engagement with the template 3110, as shown in Figure 4, to temporarily hold the template 3110 in position until the template 3110 is fixedly attached to the turbine tower 1000. The magnet 3170 may be a selectively engageable mechanical magnet or an electromagnet, 34911211for example.Referring now to Figure 5, an aperture forming means in the form of a drill 3180 is then used to drill a plurality of apertures through the turbine tower 1000. It will be appreciated that apertures may be formed in a variety of ways, including but not limited 5 to, punching, cutting, milling, grinding or perforating, for example. The template 3110 is used to ensure that the apertures drilled are precisely where intended. More specifically, six fastening means apertures in the form of main bolt apertures 4111A, 4112A, 4113A, 4114A, 4115A, 4116A (not visible in Figure 5, visible in Figure 15) are drilled through the turbine tower 1000 by utilising guidance from the plurality of main bolt guide apertures 10 3110A, two socket locking apertures 4111B, 4112B (not visible in Figure 5, visible in Figure 15) are drilled through the turbine tower 1000 by utilising guidance from the plurality of socket locking guide apertures 3110B and a guide pipe aperture 4110C (not visible in Figure 5, visible in Figure 15) is drilled through the turbine tower 1000 by utilising guidance from the guide pipe guide aperture 3110C.15 The drill 3180 may comprise an attachment means in the form of a magnet 3180’ such that the drill 3180 can be releasably attached to the template 3110. The magnet 3180’ may be a mechanical magnet or an electromagnet.It will be understood that although the presently described example utilises six main bolt apertures 4111A, 4112A, 4113A, 4114A, 4115A, 4116A and two socket 20 locking apertures 4111B, 4112B, alternative examples not described herein may utilise a greater or lesser number of main bolt apertures 4111A, 4112A, 4113A, 4114A, 4115A, 4116A and/or socket locking apertures 4111B, 4112B.The winch 3150 is then installed on the template 3110 as shown in Figure 6. The rope guide pipe 3160 is installed through the guide pipe aperture 4110C such that a 25 rope 5000 (not visible in Figure 6, visible in Figures 12 to 15) from the winch 3150 can be reeled in and out by the winch 3150 and extend down the outside of the turbine tower 1000 as will be explained later.It will now be easily understood that the plurality of main bolt bushings 3130 comprising first 3131, second 3132, third 3133, fourth 3134, fifth 3135 and sixth 3136 30 main bolt bushings will be inserted into the corresponding main bolt apertures 4111A, 4112A, 4113A, 4114A, 4115A, 4116A, as shown prior to installation in Figure 7.Similarly, the plurality of washers 3140 comprising first 3141, second 3142, third 3143, fourth 3144, fifth 3145 and sixth 3146 washers are installed on the template 3110 around the corresponding main bolt guide apertures 3111A, 3112A, 3113A, 3114A, 349112123115A, 3116A and therefore around the corresponding main bolt apertures (not visible in Figure 8). It will be understood that the steps are shown individually to fully explain and show the method of installation, however one skilled in the art will understand that the washers are typically installed at the same time as the corresponding main bolts (which 5 will be explained in due course). It will be easily understood by a person skilled in the art that a person carrying out the method may install a single bushing, washer and main bolt at a time, or may install all of the bushings then a washer and main bolt, then another washer and main bolt, then another washer and main bolt, for example. The exact method shown, particularly with the plurality of washers shown on the template without 10 main bolts placed through the washers, is for illustrative purposes to aid in clearly explaining the method.The described method can be performed from within the turbine tower 1000, such as by positioning personnel and/or equipment on the internal working deck 1004 (shown in Figure 1). As will be explained in more detail later, externally it is required that 15 the padeyes 2000 are located near to the turbine tower 1000 such that the padeyes 2000 can be picked up and run up the turbine tower 1000 at the appropriate time during the method. The padeyes 2000 may be transported to beside the turbine tower 1000 by means of a supply vessel and a crane (not shown). As mentioned previously, wind turbines typically comprise an external working deck where personnel can stand and 20 equipment can be prepared on and/or lifted and lowered onto. In Figure 9, a working deck 1005 is provided at the end of the lower portion 1101 of the tower 1000. The working deck 1005 is used to temporarily store the padeyes 2000 directly prior to installation. It will be appreciated that suitable handling equipment may also be provided on the working deck 1005 to move the padeyes 2000 around the working deck 1005 25 where required.Referring now to Figures 10 and 11, features of the padeyes 2000 are now explained by reference to the first padeye 2100. As previously explained, the first padeye 2100 comprises a plurality of springs 2120, a plurality of magnet apertures 2110, a plurality of magnets 2130 and a plurality of non-destructive tower engagement 30 elements 2140. The plurality of springs 2120 and the plurality of magnets 2130 are located within the corresponding plurality of magnet apertures 2110.As shown in Figure 11, the plurality of non-destructive tower engagement elements 2140 protrude slightly from the surface of the padeye 2100 such that when the padeye 2100 rests against the outside of the turbine tower 1000, the plurality of non 34911213destructive tower engagement elements 2140 come into contact with the turbine tower 1000 rather than the padeye 2100 main body. The non-destructive tower engagement elements 2140 can be freely run up and down the turbine tower 1000 without damaging the paint on the tower 1000 or any coatings.5 The plurality of springs 2120 provide a damping force when the padeye 2100 engages the tower 1000. The damping force reduces the likelihood of damaging either the padeye 2100 or the tower 1000 when the padeye 2100 is brought into engagement with the tower 1000. It will be understood that damping may be provided in other ways in alternative examples not described herein. In some examples, the plurality of springs 10 2120 may be replaced by a plurality of elastic elements to provide damping, for example.The plurality of magnets 2130 are configured such that when the padeye 2100 is brought close to the turbine tower 1000, the magnets 2130 are attracted to the turbine tower 1000. The magnets 2130 serve to ensure that the padeye 2100 does not detach from the tower 1000 as the padeye 2100 is lifted up the tower 1000 during installation, 15 as will be explained. Ensuring that the padeye 2100 does not detach from the tower 100 also ensures that the padeye 2100 does not begin to swing, which could cause damage to the padeye 2100 and/or the tower 1000.Still referring to Figure 11, it can be seen that the padeye 2100 is provided with a plurality of main bolt engagement apertures 2151, 2152, 2153, 2154, 2155, 2156 20 registered with the main bolt guide apertures 3111A, 3112A, 3113A, 3114A, 3115A, 3116A of the template 3100 and the corresponding drilled main bolt apertures 4111A, 4112A, 4113A, 4114A, 4115A, 4116A of the tower 1000.Referring briefly again to Figure 1 it can be seen that the padeye 2100 comprises a socket locking device 2160. The socket locking device 2160 is arranged within the 25 padeye 2100 to be moveable from an unlocked position (shown in Figure 1) to a locked position (shown in Figure 24). As will be explained in greater detail later, the socket locking device 2160 moves substantially horizontally within the padeye 2100 and is moved from the unlocked position to the locked position by means of the plurality of socket locking device engaging bolts 3120’’ comprising first 3121’ and second 3121’’ 30 socket locking device engaging bolts (visible in Figure 2).Referring again to Figure 11, it can be seen that the socket locking device 2160 comprises two socket locking device engaging bolt apertures 2161, 2162 configured to receive the socket locking device engaging bolts 3121’, 2131’’ to move the socket locking device 2160 from the unlocked position to the locked position in use. In this 34911214connection, the socket locking device engaging bolt apertures 2161, 2162 are registered with the socket locking guide apertures 3111B, 3112B of the template 3100 and the corresponding socket locking apertures 4111B, 4112B of the tower 1000.After the winch 3150, rope guide pipe 3160 and rope 5000 have been installed (and 5 possibly the plurality of main bolt bushings 3130 and washers 3140, although as explained above these may be installed after the following steps and directly prior to or during installation of the plurality of main bolts 3120), the rope 5000 hangs down the outside of the turbine tower 1000 as previously explained. The rope 5000 comprises a proximal end which is reeled in and out by the winch 3150 and a distal end opposite the 10 proximal end. The rope 5000 is then attached to the padeye 2100 such that the rope 5000 can be reeled in by the winch 3150 to lift the padeye 2100 up the turbine tower 1000. In the presently described example, the rope 5000 is run through the padeye 2100 and a lifting ball 5100 is attached to the free end of the rope 5000, as shown in the exploded view shown Figure 12 (also showing in an exploded view the plurality of 15 springs 2120, the plurality of magnets 2130 and the plurality of non-destructive tower engagement elements 2140).Figure 13 shows the padeye 2100 directly before engagement with the tower 1000 in a non-exploded view. Figure 14 shows the padeye 2100 engaged with the tower 1000 before being lifted up the tower 1000. In the position shown in Figure 14, the non-20 destructive tower engagement elements 2140 prevent damage to the tower 1000 and the padeye 2100. Furthermore, in the position shown in Figure 14, the plurality of magnets 2130 ensure the padeye 2100 does not detach from the tower 1000 and swing from the rope 5000 during lifting, which could cause damage to the tower 1000 and/or padeye 2100.25 As can be seen in Figure 15, the padeye 2100 is then lifted up the outside of the tower 1000 by the rope 5000. As shown in Figure 16, the padeye 2100 is lifted until the main bolt engagement apertures 2151, 2152, 2153, 2154, 2155, 2156 of the padeye 2100 align with the corresponding main bolt apertures 4111A, 4112A, 4113A, 4114A, 4115A, 4116A on the turbine tower 1000 and the socket engaging bolt apertures 2161, 30 2162 align with the corresponding socket locking apertures 4111B, 4112B on the turbine tower 1000. At this point, the padeye 2100 can be locked in position for use, as is now explained.An exploded view of the first padeye installation system 3100 including the main bolt bushings 3130, washers 3140, main bolts 3120, main bolt torquing members 3120’ 34911215and socket locking device engaging bolts 3120’’ and winch 3150 is shown in Figure 17 for completeness, with the magnet 3170 not shown in Figure 17 purely in the interest of clarity. It will be understood that until the main bolts 3120 are inserted and torqued by the bolt torquing members 3120’, the magnet 3170 should remain holding the template 5 3110 in position.Figures 18, 19 and 20 show the steps to install the main bolt bushings 3130 and washers 3140 (Figure 18), main bolts 3120 (Figure 19) and main bolt torquing members 3120’ and socket locking device engaging bolts 3120’’ (Figure 20).In the presently described example, the main bolts 3120, main bolt bushings 10 3130 and main bolt torquing members 3120’ together provide expansion bolts. One suitable type of expansion bolt may be EzFit Superbolt from Nord-Lock Group. It will be understood by the skilled person that the exact type and configuration of bolt used may be different in alternative examples. It will be within the capabilities of a person skilled in the art to provide a suitable coupling means to secure the padeye 2100 to the tower 15 1000. In this connection, although it is advantageous and preferred to use an expansion bolt as described herein, other types of bolts may be provided.As previously explained, it will be understood that the steps are shown individually to fully explain and show the method of installation, however one skilled in the art will understand that the washers are typically installed at the same time as the 20 corresponding main bolts, such that a person carrying out the method may install a single bushing, washer and main bolt at a time, or may install all of the bushings then a washer and main bolt, then another washer and main bolt, then another washer and main bolt, as previously discussed.It will be understood that (in Figure 19) the main bolts 3120 are inserted through 25 the template 3100 and engage the corresponding main bolt engagement apertures 2151, 2152, 2153, 2154, 2155, 2156 in the padeye 2100 to securely hold the padeye 2100 in position on the turbine tower 1000 once torqued by the main bolt torquing members 3120’ (in Figure 20).As shown in Figure 20, the socket locking device engaging bolts 3120’’ may be 30 inserted into the socket locking guide apertures 3110B of the template 3100 and through the two socket locking apertures 4111B, 4112B into engagement with the socket locking device engaging bolt apertures 2161, 2162 in the socket locking device 2160. At this point in the method, the socket locking device engaging bolts 3120’’ may engage the socket engaging bolt apertures 2161, 6162 but are not tightened so as to move the 34911216socket locking device 2160 from the unlocked to the locked position. The padeye 2100 is now installed ready for use. It will be understood that the padeye 2100 may be installed as shown and then hours, days or even months later the padeye 2100 may be used to lift and/or lower equipment on the turbine tower 1000.5 When the padeye 2100 is to be used in a lifting operation, as shown in Figure 21, the rope 5000 and attached lifting ball 5100 is reeled out by the winch 3150. The lifting ball 5100 is removed from the rope 5000 and the rope 5000 is attached to a socket 5200 attached to a lifting cable 5300 (as shown in Figure 22), such that lifting of the socket 5200 lifts the attached lifting cable 5300. The winch 3150 reels in the rope 5000 such 10 that the socket 5200 is brought into the padeye 2100, as shown in Figure 23.Referring again to Figure 22, the socket 5200 comprises a socket locking ridge 5210. The socket locking ridge 5210 is configured to be securely engaged by the socket locking device 2160 as the socket locking device 2160 moves from the unlocked position to the locked position, as shown in Figure 24, thereby securely holding the socket 5200 15 within the padeye 2100 and thereby providing a secure fixation for the attached lifting cable 5300 which may be used in hoisting operations, i.e. lifting and/or lowering objects up and/or down the turbine tower 1000.Referring to figure 25, the four padeyes 2100, 2200, 2300, 2400 and corresponding padeye installation systems 3100, 3200, 3300, 3400 are shown. A 20 detailed view is also shown in Figure 26, without the socket 5200 inserted into the padeye 2100. It should also be noted that, in the interest of clarity, the rope 5000 has been omitted from Figure 26.Referring to Figure 27, the padeye 2100 is shown with the socket 5200 in the locked position. That is to say, the socket locking device 2160 has been moved from the 25 unlocked position to the locked position by tightening the socket locking device engaging bolts 3120’’. In the locked position shown, the socket locking device 2160 locks the socket 5200 by engaging the socket 5200 in the socket locking ridge 5210.Figures 28 and 29 shows an apparatus 6000 for main component replacement wrapped around the wind turbine tower 1000 and the apparatus 6000 performing main 30 component replacement, respectively. The apparatus 6000 is lifted up and down the turbine tower 1000 by means of first 5300, second 5301, third 5302 (not visible in Figure 28, visible in Figure 29) and fourth (not visible) lifting cables attached respectively to the first 2100 (not visible in Figures 28 and 29), second 2200 (not visible in Figure 28, visible 34911217in Figure 29), third 2300 (not visible in Figure 28, visible in Figure 29) and fourth 2400 (not visible in Figures 28 and 29) padeyes.5
Claims
34911218CLAIMS1. A padeye installation system (3100) for lifting a padeye (2100) up the external wall (1001) of a wind turbine tower (1000) and securing the padeye (2100) to the turbine tower (1000), the system (3100) comprising:5 a template (3110) configured to be positioned on an internal wall (1002) of the turbine tower (1000) in use and comprising at least one fastening means guide aperture (3111A) and a guide pipe guide aperture (3110C);a template securing means (3170) configured to at least temporarily hold the template (3110) on the internal wall (1002) of the turbine tower (1000) in use; 10 an aperture forming means (3180) configured to form, in the turbine tower (1000), at least one fastening means aperture (4111A) aligned with the fastening means guide aperture (3111A) and a guide pipe aperture (4110C) aligned with the guide pipe guide aperture (3110C);a guide pipe (3160) configured to be inserted through the guide pipe 15 aperture (4110C) in the turbine tower (1000) in use;a winch (3150) for mounting on the template (3110) in use;a rope (5000) for operatively connecting to the winch (3150) in use such that the rope (5000) can be reeled in by the winch (3150) in use to lift the padeye (2100) up the turbine tower (1000), the rope (5000) being configured to run 20 through the guide pipe (3160) in use; anda fastening means (3121, 3121’, 3131, 3141) configured to be inserted through the fastening means guide aperture (3111A) and fastening means aperture (4111A) to engage the padeye (2100) to selectively secure the template (3110) and the padeye (2100) to the turbine tower (1000) in use.252. The padeye installation system (3100) according to claim 1, wherein:the at least one fastening means guide aperture (3111A) comprises a plurality of fastening means guide apertures (3111A, 3112A, 3113A, 3114A, 3115A, 3116A);30 the aperture forming means (3180) is configured to form, in the turbine tower (1000), a plurality of fastening means apertures (4111A, 4112A, 4113A, 4114A, 4115A, 4116A) each aligned with one of the plurality of fastening means guide apertures (3111A, 3112A, 3113A, 3114A, 3115A, 3116A); and the fastening means (3121, 3121’, 3131, 3141) comprises a plurality of34911219fastening means (3121, 3121’, 3131, 3141);wherein the plurality of fastening means (3121, 3121’, 3131, 3141) are each configured to be inserted through a fastening means guide aperture (3111A, 3112A, 3113A, 3114A, 3115A, 3116A) and a corresponding fastening means 5 aperture (4111A, 4112A, 4113A, 4114A, 4115A, 4116A) to engage the padeye (2100) to selectively secure the template (3110) and the padeye (2100) to the turbine tower (1000) in use.3. The padeye installation system (3100) according to claim 1 or 2, wherein the 10 template securing means (3170) is a template securing magnet (3170).4. The padeye installation system (3100) according to claim 3, wherein the template securing magnet (3170) is a selectively engageable mechanical magnet or an electromagnet.155. The padeye installation system (3100) according to any preceding claim, wherein the aperture forming means (3180) is a drill (3180) or a punch or a perforator or a grinder or a cutter.20 6. The padeye installation system (3100) according to any preceding claim, wherein the rope (5000) comprises a proximal end and a distal end, wherein the proximal end is configured to be reeled in and out by the winch (3150) and the distal end is configured to temporarily receive a lifting ball (5100) for lifting the padeye (2100) and/or a socket (5200).257. The padeye installation system (3100) according to any preceding claim, wherein the fastening means (3121, 3121’, 3131, 3141) or each fastening means (3121, 3121’, 3131, 3141) comprises a bolt.30 8. The padeye installation system (3100) according to any of claims 1 to 6, wherein the fastening means (3121, 3121’, 3131, 3141) or each fastening means (3121, 3121’, 3131, 3141) comprises an expansion bolt assembly.349112209. The padeye installation system (3100) according to claim 8, wherein the or each expansion bolt assembly comprises:a bolt (3121);a bolt bushing (3131);5 a washer (3141); anda plurality of bolt torquing members (3120’).10. The padeye installation system (3100) according to any preceding claim, wherein the aperture forming means (3180) comprises an attachment means such that 10 the aperture forming means (3180) can be releasably attached to the template (3110) in use.11. The padeye installation system (3100) according to claim 10, wherein the attachment means is a magnet or a mechanical magnet or an electromagnet. 1512. The padeye installation system (3100) according to any preceding claim, wherein:the template (3110) further comprises at least one socket locking guide aperture (3111B);20 the aperture forming means (3180) is configured to form, in the turbine tower (1000), at least one socket locking aperture (4111B) aligned with the socket locking guide aperture (3111B); and the system (3100) further comprises:a socket locking means (3121’’) configured to be inserted through the at least one socket locking guide aperture (3111B) and at least one socket locking 25 aperture (4111B) to engage a socket locking device (2160) within the padeye (2100) to selectively move the socket locking device (2160) from an unlock position to a locked position to lock a socket (5200) within the padeye (2100) in use.30 13. The padeye installation system (3100) according to claim 12, wherein:the at least one socket locking guide aperture (3111B) comprises a plurality of socket locking guide apertures (3111B, 3112B);the aperture forming means (3180) is configured to form, in the turbine tower (1000), a plurality of socket locking apertures (4111B, 4112B) each aligned34911221with the socket locking guide apertures (3111B, 3112B); andthe socket locking means (3121’, 3121’’) comprises a plurality of socket locking means (3121’, 3121’’);wherein the plurality of socketing locking means (3121’, 3121’’) are each5 configured to be inserted through a socket locking guide aperture (3111B,3112B) and a corresponding socket locking aperture (4111B, 4112B) to engage a socket locking device (2160) within the padeye (2100) to selectively move the socket locking device (2160) from an unlocked position to a locked position to lock a socket (5200) within the padeye (2100) in use.1014. A method of lifting a padeye (2100) up the external wall (1001) of the wind turbine tower (1000) and securing the padeye (2100) to the turbine tower (1000), comprising the steps of:i) providing a padeye installation system (3100) according to any of claims 1 to 15 13;ii) providing a wind turbine tower (1000);iii) providing a padeye (2100) comprising at least one fastening means engagement aperture (2151);iv) positioning the template (3110) on an internal wall (1002) of the turbine tower 20 (1000);v) attaching the template securing means (3170) to the template (3110) to temporarily hold the template (3110) on the internal wall (1002) of the turbine tower (1000);vi) forming, in the turbine tower (1000):25 at least one fastening means aperture (4111A) aligned with the fastening means guide aperture (3111A); anda guide pipe aperture (4110C) aligned with the guide pipe guide aperture (3110C);vii) inserting the guide pipe (3160) through the guide pipe aperture (4110C); 30 viii) mounting the winch (3150) on the template (3110);ix) running the rope (5000) through the guide pipe (3160);x) connecting the rope (5000) to the winch (3150) such that the rope (5000) can be reeled in and out by the winch (3150);xi) attaching the padeye (2100) to the rope (5000);34911222xii) operating the winch (3150) to reel in the rope (5000) and thereby lift the padeye (2100) up the external wall (1001) of the turbine tower (1000); xiii) aligning the at least one fastening means engagement aperture (2151) of the padeye (2100) with the at least one fastening means aperture (4111A) in the 5 turbine tower (1000);xiv) inserting the at least one fastening means (3121, 3121’, 3131, 3141) through the fastening means guide aperture (3111A) and fastening means aperture (4111A) to engage the at least one fastening means engagement aperture (2151) of the padeye (2100) thereby securing the template (3110) and the 10 padeye (2100) to the turbine tower (1000).15. The method according to claim 14, wherein the step xi) of attaching the padeye (2100) to the rope (5000) further comprises the steps of:running the rope (5000) through the padeye (2100);15 attaching a lifting ball (5100) to the end of the rope (5000); and reeling in the rope (5000) such that the lifting ball (5100) engages the padeye (2100).16. The method according to claim 14 or 15, wherein step i) is dependent on claim 20 12, wherein the padeye (2100) further comprises a socket locking device (2160) arranged to be moveable between a locked position and an unlocked position.17. The method according to claim 16, wherein:the step vi) of forming, in the turbine tower (1000) at least one fastening 25 means aperture (4111A) and a guide pipe aperture (4110C) further comprises forming, in the turbine tower (1000), at least one socket locking aperture (4111B) aligned with the at least one socket locking guide aperture (3111B) of the template (3110).30 18. The method of claim 17, further comprising a step of:xv) inserting the socket locking means (3121’) through the at least one socket locking guide aperture (3111B) and socket locking aperture (4111B) to engage the socket locking device (2160) within the padeye (2100) to move the socket locking device (2160) from an unlocked position to a locked34911223position to lock a socket (5200) within the padeye (2100).34911224P a t e n t k r a v1. System (3100) for montering av løfteøre for å løfte et løfteøre (2100) opp den ytre veggen (1001) på et vindturbintårn (1000) og feste løfteøret (2100) til turbintårnet (1000), idet systemet (3100) omfatter:5 en mal (3110) konfigurert til å posisjoneres på en indre vegg (1002) i turbintårnet (1000) i bruk og omfattende minst én ledeåpning (3111A) for festemiddel og en ledeåpning (3110C) for lederør;et middel (3170) for festing av mal konfigurert til å i det minste midlertidig holde malen (3110) på den indre veggen (1002) i turbintårnet (1000) i bruk;10 et middel (3180) for tildanning av åpning konfigurert til å tildanne, i turbintårnet (1000), minst én åpning (4111A) for festemiddel innrettet med ledeåpningen (3111A) for festemiddel og en åpning (4110C) for lederør innrettet med ledeåpningen (3110C) for lederør;et lederør (3160) konfigurert til å føres inn gjennom åpningen (4110C) for lede-15 rør i turbintårnet (1000) i bruk;en vinsj (3150) for montering på malen (3110) i bruk;et tau (5000) for operativ kobling til vinsjen (3150) i bruk slik at tauet (5000) kan sveives inn av vinsjen (3150) i bruk for å løfte løfteøret (2100) opp turbintårnet (1000), idet tauet (5000) er konfigurert til å løpe gjennom lederøret (3160) i bruk; og20 et festemiddel (3121, 3121’, 3131, 3141) konfigurert til å føres inn gjennom ledeåpningen (3111A) for festemiddel og åpningen (4111A) for festemiddel for å gå i inngrep med løfteøret (2100) for selektivt å feste malen (3110) og løfteøret (2100) til turbintårnet (1000) i bruk.2. System (3100) for montering av løfteøre ifølge krav 1, hvor:25 den minst ene ledeåpningen (3111A) for festemiddel omfatter en flerhet av ledeåpninger (3111A, 3112A, 3113A, 3114A, 3115A, 3116A) for festemiddel; middelet (3180) for tildanning av åpning er konfigurert til å tildanne, i turbintårnet (1000), en flerhet av åpninger (4111A, 4112A, 4113A, 4114A, 4115A, 4116A) for festemiddel, der hver er innrettet med én av flerheten av ledeåpninger (3111A, 3112A,30 3113A, 3114A, 3115A, 3116A) for festemiddel; ogfestemiddelet (3121, 3121’, 3131, 3141) omfatter en flerhet av festemidler (3121, 3121’, 3131, 3141);hvor flerheten av festemidler (3121, 3121’, 3131, 3141) hvert er konfigurert til å føres inn gjennom en ledeåpning (3111A, 3112A, 3113A, 3114A, 3115A, 3116A) for festemiddel35 og en tilsvarende åpning (4111A, 4112A, 4113A, 4114A, 4115A, 4116A) for festemiddel for å gå i inngrep med løfteøret (2100) for selektivt å feste malen (3110) og løfteøret (2100) til turbintårnet (1000) i bruk.349112253. System (3100) for montering av løfteøre ifølge krav 1 eller 2, hvor middelet (3170) for festing av mal er en magnet (3170) for festing av mal.4. System (3100) for montering av løfteøre ifølge krav 3, hvor magneten (3170) for festing av mal er en selektivt inngripbar mekanisk magnet eller en elektromagnet.5 5. System (3100) for montering av løfteøre ifølge et hvilket som helst av de foregående kravene, hvor middelet (3180) for tildanning av åpning er et bor (3180) eller en hullemaskin eller en perforator eller en sliper eller en skjærer.6. System (3100) for montering av løfteøre ifølge et hvilket som helst av de foregående kravene, hvor tauet (5000) omfatter en proksimal ende og en distal ende, hvor den proksi-10 male enden er konfigurert til å sveives inn og ut av vinsjen (3150), og den distale enden er konfigurert til midlertidig å romme en løftekule (5100) for å løfte løfteøret (2100) og/eller en muffe (5200).7. System (3100) for montering av løfteøre ifølge et hvilket som helst av de foregående kravene, hvor festemiddelet (3121, 3121’, 3131, 3141) eller hvert festemiddel (3121, 3121’,15 3131, 3141) omfatter en bolt.8. System (3100) for montering av løfteøre ifølge et hvilket som helst av kravene 1 til 6, hvor festemiddelet (3121, 3121’, 3131, 3141) eller hvert festemiddel (3121, 3121’, 3131, 3141) omfatter en ekspansjonsboltsammenstilling.9. System (3100) for montering av løfteøre ifølge krav 8, hvor ekspansjonsboltsammenstil-20 lingen eller hver ekspansjonsboltsammenstilling omfatter:en bolt (3121);en boltbøssing (3131);en underlagsskive (3141); ogen flerhet av bolttiltrekkingselementer (3120’).25 10. System (3100) for montering av løfteøre ifølge et hvilket som helst av de foregående kravene, hvor middelet (3180) for tildanning av åpning omfatter et festemiddel slik at middelet (3180) for tildanning av åpning kan løsgjørbart festes til malen (3110) i bruk.11. System (3100) for montering av løfteøre ifølge krav 10, hvor festemiddelet er en magnet eller en mekanisk magnet eller en elektromagnet.30 12. System (3100) for montering av løfteøre ifølge et hvilket som helst av de foregående kravene, hvor:malen (3110) videre omfatter minst én ledeåpning (3111B) for muffelåsing; middelet (3180) for tildanning av åpning er konfigurert til å tildanne, i34911226turbintårnet (1000), minst én åpning (4111B) for muffelåsing innrettet med ledeåpningen (3111B) for muffelåsing; og systemet (3100) omfatter videre:et muffelåsemiddel (3121’’) konfigurert til å føres inn gjennom den minst ene ledeåpningen (3111B) for muffelåsing og minst én åpning (4111B) for muffelåsing for å gå i5 inngrep med en muffelåseanordning (2160) inni løfteøret (2100) for selektivt å flytte muffelåseanordningen (2160) fra en ulåst posisjon til en låst posisjon for å låse en muffe (5200) inni løfteøret (2100) i bruk.13. System (3100) for montering av løfteøre ifølge krav 12, hvor:den minst ene ledeåpningen (3111B) for muffelåsing omfatter en flerhet av le-10 deåpninger (3111B, 3112B) for muffelåsing;middelet (3180) for tildanning av åpning er konfigurert til å tildanne, i turbintårnet (1000), en flerhet av åpninger (4111B, 4112B) for muffelåsing, der hver er innrettet med ledeåpningene (3111B, 3112B) for muffelåsing; ogmuffelåsemiddelet (3121’, 3121’’) omfatter en flerhet av muffelåsemidler (3121’,15 3121’’);hvor flerheten av muffelåsemidler (3121’, 3121’’) hvert er konfigurert til å føres inn gjennom en ledeåpning (3111B, 3112B) for muffelåsing og en tilsvarende åpning (4111B, 4112B) for muffelåsing for å gå i inngrep med en muffelåseanordning (2160) inni løfteøret (2100) for selektivt å flytte muffelåseanordningen (2160) fra en ulåst posisjon til en låst20 posisjon for å låse en muffe (5200) inni løfteøret (2100) i bruk.14. Fremgangsmåte for å løfte løfteøret (2100) opp den ytre veggen (1001) til vindturbintårnet (1000) og feste løfteøret (2100) til turbintårnet (1000), omfattende trinnene:i) å tilveiebringe et system (3100) for montering av løfteøre ifølge et hvilket som helst av kravene 1 til 13;25 ii) å tilveiebringe et vindturbintårn (1000);iii) å tilveiebringe et løfteøre (2100) omfattende minst én inngrepsåpning (2151) for festemiddel;iv) å posisjonere malen (3110) på en indre vegg (1002) i turbintårnet (1000); v) å feste middelet (3170) for festing av mal til malen (3110) for midlertidig å holde30 malen (3110) på den indre veggen (1002) i turbintårnet (1000);vi) å tildanne, i turbintårnet (1000):minst én åpning (4111A) for festemiddel innrettet med ledeåpningen (3111A) for festemiddel; ogen åpning (4110C) for lederør innrettet med ledeåpningen (3110C) for lederør;35 vii) å føre inn lederøret (3160) gjennom åpningen (4110C) for lederør;viii) å montere vinsjen (3150) på malen (3110);ix) å trekke tauet (5000) gjennom lederøret (3160);x) å feste tauet (5000) til vinsjen (3150) slik at tauet (5000) kan sveives inn og ut34911227av vinsjen (3150);xi) å feste løfteøret (2100) til tauet (5000);xii) å betjene vinsjen (3150) for å sveive inn tauet (5000) og derved løfte løfteøret (2100) opp den ytre veggen (1001) på turbintårnet (1000);5 xiii) å innrette den minst ene inngrepsåpningen (2151) for festemiddel på løfteøret (2100) med den minst ene åpningen (4111A) for festemiddel i turbintårnet (1000); xiv) å føre inn det minst ene festemiddelet (3121, 3121’, 3131, 3141) gjennom ledeåpningen (3111A) for festemiddel og åpningen (4111A) for festemiddel for å gå i inngrep med den minst ene inngrepsåpningen (2151) for festemiddel på løfteøret (2100) og der-10 ved feste malen (3110) og løfteøret (2100) til turbintårnet (1000).15. Fremgangsmåte ifølge krav 14, hvor trinnet xi) for å feste løfteøret (2100) til tauet (5000) videre omfatter trinnene:å trekke tauet (5000) gjennom løfteøret (2100);å feste en løftekule (5100) til enden av tauet (5000); og15 å sveive inn tauet (5000) slik at løftekulen (5100) går i inngrep med løfteøret (2100).16. Fremgangsmåte ifølge krav 14 eller 15, hvor trinn i) er avhengig av krav 12, hvor løfteøret (2100) videre omfatter en muffelåseanordning (2160) anordnet til å kunne flyttes mellom en låst posisjon og en ulåst posisjon.20 17. Fremgangsmåte ifølge krav 16, hvor:trinnet vi) for å tildanne, i turbintårnet (1000), minst én åpning (4111A) for festemiddel og en åpning (4110C) for lederør, videre omfatter å tildanne, i turbintårnet (1000), minst én åpning (4111B) for muffelåsing innrettet med den minst ene ledeåpningen (3111B) for muffelåsing i malen (3110).25 18. Fremgangsmåte ifølge krav 17, videre omfattende et trinn for:xv) å føre inn muffelåsemiddelet (3121’) gjennom den minst ene ledeåpningen (3111B) for muffelåsing og åpningen (4111B) for muffelåsing for å gå i inngrep med muffelåseanordningen (2160) inni løfteøret (2100) for å flytte muffelåseanordningen (2160) fra en ulåst posisjon til en låst posisjon for å låse en muffe (5200) inni løfteøret (2100).
Drawings

Priority


No priority

Patent classes


IPC classesB66C 1/10F03D 13/10CPC classesB66C 1/10F03D 13/10

Citations


CN 106865422 B (B)CN 215998818 U (U)US 5971683 A (A)

Applicants, owners and inventors


Owners
NEKKAR ASA
Lumberveien 27 4621 KRISTIANSAND S NO (KRISTIANSAND Municipality, Agder county)Org. number: 932142104
Inventors
Yngvar Borø
Ausvigheia 27 4641 SØGNE NO (KRISTIANSAND Municipality, Agder county)

Agent


HÅMSØ PATENTBYRÅ AS
HÅMSØ PATENTBYRÅ AS

Org. number: 918752900

Name and address are automatically synchronized with the Brønnøysund Register Centre.

Open in The Brønnøysund Register Centre
Postboks 9 4068 STAVANGER NO (STAVANGER Municipality, Rogaland county)
Org. number: 918752900
Reference: P31233NO00

Status history


Payment history


Oppositions and appeals


No oppositions or appeals

Administrative limitation


No administrative limitation

Liens and licences


No liens or licenses registered

Gazette entries


No Gazette entries foundOnly events from 2024.03.04 and onwards are shown.