Key information

Title
A method and a well device for temporary well isolation during a well completion phase
Application number
20240632
Case type
National
Status
Filed
14.06.2024
Effective date
14.06.2024
Publicly available
24.11.2025
Next annual fee due
30.06.2027
Applicant
SBS Technology AS (NO)
Owner
SBS Technology AS (NO)
Inventor
Andreas Dahlberg (NO)
Agent
BRYN AARFLOT AS (NO)
Granted
24.11.2025
Patent number
349273
Expiry date
14.06.2044

Abstract and drawing


Disclaimer: This text has been machine-scanned and may contain errors – please refer to "Publications" for legally binding content.
A well tool device (20) for temporary well isolation during a well completion phase, comprising a tubular (12a) arranged for assembly in a production tubing (12), said tubular (12a) further comprises a glass disc (20) and a glass disc break mechanism (22) disposed within a through running boring (24), wherein the glass disc break mechanism (22) is installed upstream in the tubular (12a) and on an upper side of the glass disc (20), and the glass disc (20) is arranged to be forced against the glass disc break mechanism (22) by an underbalanced pressure created on said upper side of the glass disc (20). The invention also relates to a method for temporary well isolation during a well completion phase.

Publications


B1A1
Checking availability of the latest published version...

Documents


Expand Download files (40)
Date
Date Doc. No. Process Case number In/Out Journal description To/from
28.08.2026 05-01 Innsigelse 2026/00358 UT Generelt brev BREEZE IP AS
27.08.2026 04-12 Innsigelse 2026/00358 UT Innsigelse mot NO349273 - 240826
27.08.2026 04-11 Innsigelse 2026/00358 UT D5 - WO2021032642
27.08.2026 04-10 Innsigelse 2026/00358 UT D4 - US2019017345
27.08.2026 04-09 Innsigelse 2026/00358 UT D3 - TCO_Presentation_Chevron_6-April-11
27.08.2026 04-08 Innsigelse 2026/00358 UT D3 - TCO_Presentation_Chevron_6-April-11
27.08.2026 04-07 Innsigelse 2026/00358 UT D2 - US2017321518
27.08.2026 04-06 Innsigelse 2026/00358 UT D1 - WO2020197413
27.08.2026 04-05 Innsigelse 2026/00358 UT Bilag 3b-4 - ONS 2012 stand med TDP-modeller
27.08.2026 04-04 Innsigelse 2026/00358 UT Bilag 3b-3 - ONS 2012 stand med rullerende presentasjon
27.08.2026 04-03 Innsigelse 2026/00358 UT Bilag 3b-2 - ONS 2012 stand med TDP-modell og ONS-logo
27.08.2026 04-02 Innsigelse 2026/00358 UT Bilag 3b-1 - ONS 2012 stand med TDP-modell
27.08.2026 04-01 Innsigelse 2026/00358 UT Oversendelse til patenthaver BRYN AARFLOT AS
27.08.2026 03-01 Innsigelse 2026/00358 UT Bekreftelse til kravstiller/innsiger BREEZE IP AS
27.08.2026 03-01 Innsigelse 2026/00359 UT Bekreftelse til kravstiller/innsiger ZACCO NORWAY AS
27.08.2026 02-03 Innsigelse 2026/00359 UT OP501474NO00 - Innsigelse
27.08.2026 02-02 Innsigelse 2026/00359 UT D1 - WO2025172399A1
27.08.2026 02-01 Innsigelse 2026/00359 UT Oversendelse til patenthaver BRYN AARFLOT AS
24.08.2026 02-02 Innsigelse 2026/00358 INN D3 - TCO_Presentation_Chevron_6-April-11 BREEZE IP AS
24.08.2026 02-01 Innsigelse 2026/00358 INN Korrespondanse (Hovedbrev inn) BREEZE IP AS
24.08.2026 01-11 Innsigelse 2026/00358 INN Innsigelse mot NO349273 - 240826 BREEZE IP AS
24.08.2026 01-10 Innsigelse 2026/00358 INN D5 - WO2021032642 BREEZE IP AS
24.08.2026 01-09 Innsigelse 2026/00358 INN D4 - US2019017345 BREEZE IP AS
24.08.2026 01-08 Innsigelse 2026/00358 INN D3 - TCO_Presentation_Chevron_6-April-11 BREEZE IP AS
24.08.2026 01-07 Innsigelse 2026/00358 INN D2 - US2017321518 BREEZE IP AS
24.08.2026 01-06 Innsigelse 2026/00358 INN D1 - WO2020197413 BREEZE IP AS
24.08.2026 01-05 Innsigelse 2026/00358 INN Bilag 3b-4 - ONS 2012 stand med TDP-modeller BREEZE IP AS
24.08.2026 01-04 Innsigelse 2026/00358 INN Bilag 3b-3 - ONS 2012 stand med rullerende presentasjon BREEZE IP AS
24.08.2026 01-03 Innsigelse 2026/00358 INN Bilag 3b-2 - ONS 2012 stand med TDP-modell og ONS-logo BREEZE IP AS
24.08.2026 01-02 Innsigelse 2026/00358 INN Bilag 3b-1 - ONS 2012 stand med TDP-modell BREEZE IP AS
24.08.2026 01-01 Innsigelse 2026/00358 INN Nytt overprøvningskrav (OP) BREEZE IP AS
21.08.2026 01-04 Innsigelse 2026/00359 INN OP501474NO00 - Innsigelse ZACCO NORWAY AS
21.08.2026 01-03 Innsigelse 2026/00359 INN General Power of Attorney - NO ZACCO NORWAY AS
21.08.2026 01-02 Innsigelse 2026/00359 INN D1 - WO2025172399A1 ZACCO NORWAY AS
21.08.2026 01-01 Innsigelse 2026/00359 INN Nytt overprøvningskrav (OP) ZACCO NORWAY AS
02.05.2026 09-01 Saksbehandling 20240632(349273) UT PT Varsel om betaling av første årsavgift (3317) (PT20240632) BRYN AARFLOT AS
29.01.2026 02-01 Endring av fullmektig 2026/00648 UT GH Forespørsel BRYN AARFLOT AS
27.01.2026 01-02 Endring av fullmektig 2026/00648 INN Generalfullmakt Bryn Aarflot AS BRYN AARFLOT AS
27.01.2026 01-01 Endring av fullmektig 2026/00648 INN Generell henvendelse BRYN AARFLOT AS
27.11.2025 08-01 Saksbehandling 20240632(349273) UT PT Registreringsbrev nasjonal patent (15) (PT20240632)
08.09.2025 07-01 Saksbehandling 20240632 UT PT Meddelelse om patent ACAPO ONSAGERS AS
05.06.2025 06-06 Saksbehandling 20240632 INN case 21 P20938NO00 svar på realitetsuttalelse ACAPO AS
05.06.2025 06-05 Saksbehandling 20240632 INN case 21 P20938NO00 reviderte krav og ovs krav ACAPO AS
05.06.2025 06-04 Saksbehandling 20240632 INN case 21 P20938NO00 reviderte krav og ovs krav - merket ACAPO AS
05.06.2025 06-03 Saksbehandling 20240632 INN case 21 P20938NO00 revidert beskrivelse ACAPO AS
05.06.2025 06-02 Saksbehandling 20240632 INN case 21 P20938NO00 revidert beskrivelse- merket ACAPO AS
05.06.2025 06-01 Saksbehandling 20240632 INN Korrespondanse (Hovedbrev inn) ACAPO AS
10.12.2024 05-02 Saksbehandling 20240632 UT PT report 11:43:47
10.12.2024 05-01 Saksbehandling 20240632 UT Substantive Examination ACAPO AS
30.08.2024 04-02 Saksbehandling 20240632 INN P20938NO00 Overdragelse ACAPO AS
30.08.2024 04-01 Saksbehandling 20240632 INN Korrespondanse (Hovedbrev inn) ACAPO AS
17.06.2024 03-01 Saksbehandling 20240632 UT Formalia 1 ACAPO AS
17.06.2024 02-01 Saksbehandling 20240632 UT Informasjon til oppfinner Andreas Dahlberg
14.06.2024 01-04 Saksbehandling 20240632 INN P20938NO00 patent application ACAPO AS
14.06.2024 01-03 Saksbehandling 20240632 INN P20938NO00 Fullmakt ACAPO AS
14.06.2024 01-02 Saksbehandling 20240632 INN P20938NO00 drawings ACAPO AS
14.06.2024 01-01 Saksbehandling 20240632 INN Søknadsskjema Patent ACAPO AS

Description, claims and drawings


Disclaimer: This text has been machine-scanned and may contain errors – please refer to "Publications" for legally binding content. Description
3492731Field of the inventionThe present invention relates to a method and a well device for temporary well isolation during a well completion phase.5 Typical activities are pressure test and packer setting.Background of the inventionIn different types of well operations, it is a need for well tool devices providing a temporary isolation of a tubing or casing string during well completion activities. A 10 common solution is a frangible glass plug or disc configured to break at a given differential pressure across the plug, in example 5000 psi. In example if there are a hydrostatic pressure on both sides of the plug i.e., 3000 psi, the differential pressure is zero across the plug. If pressure at wellhead/surface is increased by i.e., 5000 psi, the pressure above the plug will be 8000 psi, and the differential pressure 15 across the plug will be 5000 psi, at this point the plug will activate and open.Typical for activation of barrier valves /plugs is that they will activate on overbalanced pressure.20 International patent application published as WO2020/197413 beonging to the applicant, defines a plug breaking mechanism with a plug disposed inside a housing and axially slidable within a limited interval inside the housing, a seal ring inside the housing between the plug and the housing, axially slidable between a first position and a second position and sealing between the plug and the housing, the seal ring 25 having a seal ring uphole pisten area exposed to the pressure above the plug, and shear elements with a given shear value preventing axial movement of the seal ring inside the housing prior to shearing the shear element, and breaking members physically separated from the plug with the seal ring in its first position and exposed to the plug with the seal ring in its second position, wherein biasing members are 30 acting on said seal ring in an uphole direction, urging the seal ring in the uphole direction.US2017/0321518A1 describes a well tool device with a housing and a through bore. A frangible obstruction device is provided inside the longitudinal bore, where through 35 fluid flow is prevented due to the frangible obstruction device. The frangible obstruction device includes a through opening. The well tool device further includes an actuation device extending fluidtight at !east into the through opening. The 3492732actuation device includes an actuation tool connection interface and a disintegration device. The disintegration device is configured to be at !east partially moved into the frangible obstruction device and thereby provide disintegration of the frangible obstruction device, hence allowing fluid flow through the between the first end and 5 the second end of the through bore.Objects of the present inventionAccording to the invention, the glass disc is activated and crushed first with an underbalance on the upper side of the glass disc, whereas traditionally another tool 10 with the same function is activated on an overbalance on the upper side. With the present invention, there is no need to consider pressure cycles on the upper side of the glass disc when installing the lower or upper completion of the well. The operator can pressure test against the glass disc without risk of activating the shear function on the glass disc.15The glass disc will be run as a part of the completion in a completion fluid that is heavier than the reservoir pressure. When the completion is installed and tested and ready to open the well for production, lighter fluid or gas is circulated in to lighten the column on the upper side of the glass disc. When the differential pressure (the 20 underbalance) is large enough to reach the predetermined shear pressure for activation of the glass break mechanism, the glass disc breaks and the well starts to flow and produce.Hence, it is an object to provide an improved method and well device for temporary 25 well isolation during a well completion phase.Summary of the inventionAccording to a first aspect of the invention, a method for temporary well isolation during a well completion phase is provided, wherein the method comprises the 30 steps:running a production tubing with at least one glass disc installed, through a wellhead and into a reservoir in a subterrain formation, wherein the glass disc is run in a completion fluid that is heavier than the reservoir pressure,wherein the pressre above and below the glass disc is kept equal during the run in 35 state,setting a production packer and pressure test against the glass disc, 3492733circulating in a lighter fluid or gas to lighten a column on an upper side of the glass disc, thuscreating an underbalanced pressure on the upper side of the glass disc, sufficient to force the glass disc against a glass disc break mechanism disposed on said upper 5 side of the glass disc, andshatter the glass disc to open the well and allowing flow in the production tubing. The glass disc is arranged for axial displacement in the production tubing and to be forced against breaking pins in the glass disc break mechanism, when the10 underbalanced pressure is large enough.The glass disc glass break mechanism can be activated by a shear pressure acting on the glass disc break mechanism.15The step of circulating in lighter fluid or gas can comprise displacing fluid above the glass disc through a circulation sleeve above the production packer or gas lift through gas mandrels.20 The glass disc can be arranged to shatter when the underbalance pressure reaches a predetermined shear pressure, for instance 206,8bar (3000psi).According to a second aspect of the invention, a well tool device for temporary well isolation during a well completion phase is provided, comprising a tubular arranged 25 for assembly in a production tubing, said tubular further comprises a glass disc and a glass disc break mechanism disposed within a through running boring, wherein the glass disc break mechanism is installed above in the tubular and on an upper side of the glass disc, and the glass disc is arranged to be forced against the glass disc break mechanism by an underbalanced pressure created on said upper 30 side of the glass disc,wherein the glass disc (20) is arranged for axial displacement in the through running boring (24) of the tubular (12a) and to be forced against breaking pins in the glass disc break mechanism (22), when the underbalanced pressure is large enough. 35The glass disc can be a solid and disintegratable disc or plug made of brittle glass. 3492734The glass disc break mechanism can in one embodiment comprise one or more pins protruding axially in the through running boring of the tubular, or one or more pins mounted inside the tubular, and which are protruding inwardly in the through running boring, wherein the underbalanced pressure forces the glass disc against the pins to 5 shatter the glass disc.The glass disc break mechanism can in another embodiment comprise a load ring supporting the glass disc, said load ring is axially movable within the through running boring between a first position in where the glass disc is with a distance to a10 breaking pin and a second position in where the glass disc is forced against the breaking pin.The load ring can be resting on a shear ring with an annular shear lip to prevent axial movement in the first position until the shear lip is subjected to a force higher than a 15 predetermined force, wherein the annular shear lip of the shear ring extends radially inward in the through running boring, and the breaking pin is resting on the shear ring, and said breaking pin is accommodated in a pocket on an outside of the load ring.20 Description of the figuresEmbodiments of the present invention will now be described, by way of example only, with reference to the following figures, wherein:Figure 1 shows an overview of a well with a production tubing installed.Figure 2 shows a well tool device according to the invention.25 Fig. 3a-3d show operation sequence in the method according to the invention.Description of preferred embodiments of the inventionUnderbalance and Overbalance Pressure30Overbalance Pressure:If hydrostatic pressure in a well is higher than the reservoir pressure, the difference is called overbalance pressure, or simply overbalance.35 Underbalance Pressure:If reservoir pressure is more than hydrostatic pressure, the difference is called underbalance. 3492735Conversion3,000psi – 206,8bar6,000psi – 413,7bar5 10,000psi – 689,5bar15,000psi – 1034,2barThe invention is disclosed and shown in the drawings in a basically vertical well. Hence, the terms “upper”, “upstream”, “overlying”, “upwards”, “above”, etc., relates to 10 what is shown in fig. 1. In a horizontal well similar terms have the same meaning, but in a horizontal direction towards the wellhead.Fig. 1 shows an overview of a well. During completion, a production tubing 12 is installed between a wellhead 10 on the seafloor and a reservoir 16 in a subterrain 15 formation 18. Production packers 14 are installed between the production tubing 12 and the subterrain formation 18.A glass disc 20 and a glass disc break mechanism 22 is installed in a tubular 12a of the production tubing 12. As seen in fig. 2, the glass disc break mechanism 22 is 20 installed in a through running boring 24 in the tubular 12a and on an above or upper side of the glass disc 20, i.e., in the part of the tubular 12a closest to the wellhead 10. Hence, the glass disc 20 is installed below the glass disc break mechanism 22. The glass disc 20 is a solid glass disc, such as a disintegratable disc or plug, for 25 instance made of brittle glass, so it can be shattered by the glass disc break mechanism 22.The glass disc 20 is arranged to be forced against the glass disc break mechanism 22 by an underbalanced pressure created on the upper side of the glass disc 20. 30 The operational process steps shall be explained later.Hence, the glass disc 20 is arranged for axial displacement in the through running boring 24 of the tubular 12a and to be forced against for instance breaking pins in the glass disc break mechanism 22, when the underbalanced pressure is large 35 enough. 3492736The glass disc break mechanism 22 can in a first embodiment comprise one or more pins protruding axially in the through running boring 24 of the tubular 12a, or one or more pins mounted inside the through running boring 24 of the tubular 12a, and which are protruding inwardly in the through running boring.5The glass disc break mechanism 22 can in a second embodiment comprise a load ring supporting the glass disc 20, wherein the load ring is axially movable within the through running boring 24 between a first position in where the glass disc 20 is with a distance to a breaking pin and a second position in where the glass disc 20 is 10 forced against the breaking pin.Said load ring can be resting on a shear ring with an annular shear lip to prevent axial movement in the first position until the shear lip is subjected to a force higher than a predetermined force, created by the underbalanced pressure. The annular 15 shear lip of the shear ring extends radially inward in the through running boring 24.The breaking pin can be resting on the shear ring, and the breaking pin can be accommodated in a pocket on an outside of the load ring.Fig. 3a-3d show operation sequence of the method according to the invention.20Fig. 3a shows run-in-hole state with the glass disc 20. Same pressure above and below the glass disc 20, for instance 10,000psi. The glass disc 20 is run as part of the completion in a completion fluid that is heavier than the reservoir pressure.25 Setting production packer 14 and pressure test against the glass disc 20 is illustrated in fig.3b, for instance by applying 5,000psi.Thereafter a lighter fluid or gas is circulated to lighten a column on an upper side of the glass disc 20, as seen in fig.3c, thus creating an underbalanced pressure on the 30 upper side of the glass disc 20. When the underbalanced pressure is sufficiently large enough it will force the glass disc 20 against the glass disc break mechanism 22 arranged on said upper side of the glass disc 20, thus shattering the glass disc 20 and opening the well and allowing flow in the production tubing 12, as seen in fig.3d.35 Displacement of fluid above the glass disc 20 to lighter fluid or gas in the well can be done through a circulation sleeve above the production packer 14 or gas lift through 3492737gas mandrels. The glass disc 20 will shatter when differential (underbalance) pressure reaches the predetermined shear pressure, in this case 3000psi.5
Claims
3492738Claims1. A method for temporary well isolation during a well completion phase, wherein the method comprises the steps:5 running a production tubing (12) with at least one glass disc (20) installed, through a wellhead (10) and into a reservoir (16) in a subterrain formation (18), wherein the glass disc (20) is run in a completion fluid that is heavier than the reservoir pressure,wherein the pressure above and below the glass disc (20) is kept equal during 10 the run in state,setting a production packer (14) and pressure test against the glass disc (20), circulating in a lighter fluid or gas to lighten a column on an upper side of the glass disc (20), characterized bycreating an underbalanced pressure on the upper side of the glass disc (20), 15 sufficient to force the glass disc (20) against a glass disc break mechanism (22) disposed on said upper side of the glass disc (20), andshatter the glass disc (20) to open the well and allowing flow in the production tubing (12).20 2. The method according to claim 1, wherein the glass disc (20) is arranged for axial displacement in the production tubing (12) and to be forced against breaking pins in the glass disc break mechanism (22), when the underbalanced pressure is large enough.25 3. The method according to claim 2, wherein the glass disc glass break mechanism (22) is activated by a shear pressure acting on the glass disc break mechanism (22).30 6. The method according to claim 1, wherein the step of circulating in lighter fluid or gas comprises displacing fluid above the glass disc (20) through a circulation sleeve above the production packer (14) or gas lift through gas mandrels.7. The method according to claim 1, wherein the glass disc (20) is arranged to 35 shatter when the underbalance pressure reaches a predetermined shear pressure, for instance 206,8bar (3000psi).34927398. A well tool device for temporary well isolation during a well completion phase, comprising a tubular (12a) arranged for assembly in a production tubing (12), said tubular (12a) further comprises a glass disc (20) and a glass disc break mechanism (22) disposed within a through running boring (24), characterized in that5 the glass disc break mechanism (22) is installed above in the tubular (12a) and on an upper side of the glass disc (20), and the glass disc (20) is arranged to be forced against the glass disc break mechanism (22) by an underbalanced pressure created on said upper side of the glass disc (20),wherein the glass disc (20) is arranged for axial displacement in the through 10 running boring (24) of the tubular (12a) and to be forced against breaking pins in the glass disc break mechanism (22), when the underbalanced pressure is large enough.15 9. The well tool device according to claim 7, wherein the glass disc (20) is a solid and disintegratable disc or plug made of brittle glass.10. The well tool device according to claim 7, wherein the glass disc break mechanism (22) comprises20 one or more pins protruding axially in the through running boring (24) of the tubular (12a), orone or more pins mounted inside the tubular (12a), and which are protruding inwardly in the through running boring (24),wherein the underbalanced pressure forces the glass disc (20) against the 25 pins to shatter the glass disc (20).11. The well tool device according to claim 7, wherein the glass disc break mechanism (22) comprises a load ring supporting the glass disc (20), said load ring is axially movable within the through running boring (24) between a first position in 30 where the glass disc (20) is with a distance to a breaking pin and a second position in where the glass disc (20) is forced against the breaking pin.12. The well tool device according to claim 11, whereinsaid load ring is resting on a shear ring with an annular shear lip to prevent 35 axial movement in the first position until the shear lip is subjected to a force higher than a predetermined force, wherein the annular shear lip of the shear ring extends radially inward in the through running boring (24), and34927310the breaking pin is resting on the shear ring, and said breaking pin is accommodated in a pocket on an outside of the load ring.34927311Krav1. En fremgangsmåte for midlertidig brønnisolasjon under en brønnkompletteringsfase, hvor fremgangsmåten omfatter trinnene:å kjøre et produksjonsrør (12) med i det minste en glass-skive (20) installert, 5 gjennom et brønnhode (10) og inn i et reservoar (16) i en underjordisk formasjon (18), hvori glass-skiven (20) kjøres inn i et kompletteringsfluid som er tyngre enn reservoartrykket,hvori trykket over og under glass-skiven (20) holdes likt under innkjøringstilstanden,10 å sette en produksjonspakning (14) og trykkteste mot glass-skiven (20),å sirkulere inn et lettere fluid eller gass for å lette en søyle på en overside av glass-skiven (20), karakterisert ved,å danne et underbalansert trykk på oversiden av glass-skiven (20) tilstrekkelig til å tvinge glass-skiven (20) mot en glass-skiveknusemekanisme (22) anordnet på 15 oversiden av glass-skiven (20), ogknuse glass-skiven (20) for å åpne brønnen og tillate strømning i produksjonsrøret (12).2. Fremgangsmåten ifølge krav 1, hvor glass-skiven (20) er innrettet for aksial 20 forflytning i produksjonsrøret (12) og for å bli tvunget mot knusepinnene i glassknusemekanismen (22) når det underbalanserte trykket er stort nok.3. Fremgangsmåten ifølge krav 2, hvori glass-skiveknusemekanismen (22) aktiveres ved et skjærtrykk som virker på glass-skiveknusemekanismen (22).256. Fremgangsmåten ifølge krav 1, hvori trinnet med å sirkulere inn lettere fluid eller gass omfatter å skifte ut fluid over glass-skiven (20) via en sirkulasjonshylse over produksjonspakningen (14) eller gassløft via gassmandreller.30 7. Fremgangsmåten ifølge krav 1, hvori glass-skiven (20) er innrettet til å knuses når det underbalanserte trykket når et forhåndsbestemt skjærtrykk, for eksempel 206,8 Bar (3000 psi).8. En brønnverktøysinretning for midlertidig brønnisolasjon under en35 brønnkompletteringsfase, omfattende et rør (12a) innrettet for sammenstilling i et produksjonsrør (12), hvor røret (12a) videre omfatter en glass-skive (20) og en glass34927312skiveknusemekanisme (22) anordnet innenfor en gjennomgående boring (24), karakterisert ved atglass-skiveknusemekanismen (22) er installert ovenfor i røret (12a) og på en overside av glass-skiven (20), og glass-skiven (20) er innrettet til å bli tvunget mot 5 glass-skiveknusemekanismen (22) av et underbalansert trykk dannet på oversiden av glass-skiven (20),hvor glass-skiven (20) er innrettet for aksial forflytning i den gjennomgående boringen (24) av røret (12a) og til å bli tvunget mot knusepinnene i glassknusemekanismen (22) når det underbalanserte trykket er stort nok.109. Brønnverktøysinretningen ifølge krav 7, hvori glass-skiven (20) er en massiv og disintegrerbar skive eller plugg laget av sprøtt glass.10. Brønnverktøysinretningen ifølge krav 7, hvori glassknusemekanismen (22) 15 omfatteren eller flere pinner som strekker seg aksialt i den gjennomgående boringen (24) av røret (12a), elleren eller flere pinner anordnet inne i røret (12a), og som stikker frem innover i den gjennomgående boringen (24),20 hvori det underbalanserte trykket tvinger glass-skiven (20) mot pinnene for å knuse glass-skiven (20).11. Brønnverktøysinretningen ifølge krav 7, hvori glass-skiveknusemekanismen (22) omfatter en lastring som støtter glass-skiven (20), hvor lastringen er bevegelig 25 inne i den gjennomgående boringen (24) mellom en første posisjon hvor glassskiven (20) har en avstand til en knusepinn og en andre posisjon hvor glass-skiven (20) tvinges mot knusepinnen.12. Brønnverktøysinretningen ifølge krav 11, hvori30 lastringen hviler på en skjærring med en ringformet skjærleppe for å forebygge aksial bevegelse i den første posisjonen inntil skjærleppen utsettes for en kraft høyere enn en forhåndsbestemt kraft, hvori den ringformede skjærleppen av skjærringen strekker seg radielt innover i den gjennomgående boringen (24), og hvor knusepinnen hviler på skjærringen, og knusepinnen er anbrakt i en 35 lomme på en utside av lastringen.
Drawings

Priority


No priority

Patent classes


IPC classesE21B 33/12E21B 33/134CPC classesE21B 33/12E21B 33/134

Citations


WO 2020197413 A1 (A1)US 2017321518 A1 (A1)

Applicants, owners and inventors


Owners
SBS Technology AS
c/o c/o Entech Solutions AS, Storaneset 12 5260 INDRE ARNA NO (BERGEN Municipality, Vestland county)Org. number: 821689422
Inventors
Andreas Dahlberg
Storaneset 12 5260 INDRE ARNA NO (BERGEN Municipality, Vestland county)

Agent


BRYN AARFLOT AS
BRYN AARFLOT AS

Org. number: 979993269

Name and address are automatically synchronized with the Brønnøysund Register Centre.

Open in The Brønnøysund Register Centre
Stortingsgata 8 0161 OSLO NO (OSLO Municipality, Oslo county)
Org. number: 979993269
Reference: -

Status history


Payment history


Oppositions and appeals


InnsigelseReceived: 24.08.2026 NIPO's case No.: 2026/00358Current status: Under behandling. Brevveksling/utgående brev i saken
OpponentINNOVEX NORWAY HOLDCO AS
INNOVEX NORWAY HOLDCO AS

Org. number: 983532845

Name and address are automatically synchronized with the Brønnøysund Register Centre.

Open in The Brønnøysund Register Centre
Vestre Svanholmen 6 4313 SANDNES NO
Opponent's agentBREEZE IP AS Sandviksveien 62 5035 BERGEN NO (BERGEN Municipality, Vestland county)
Org. number: 932406667Reference: O0003NO00

InnsigelseReceived: 21.08.2026 NIPO's case No.: 2026/00359Current status: Under behandling. Brevveksling/utgående brev i saken
OpponentINTERWELL NORWAY AS Moseidsletta 34 4052 RØYNEBERG NO
Opponent's agentZACCO NORWAY AS Postboks 488 0213 OSLO NO (OSLO Municipality, Oslo county)
Org. number: 982702887Reference: OP501474NO00

Administrative limitation


No administrative limitation

Liens and licences


No liens or licenses registered

Gazette entries


No Gazette entries foundOnly events from 2024.03.04 and onwards are shown.